project management class ( based on pmbok) - day 5

Post on 06-May-2015

1.181 Views

Category:

Education

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Day 5 - Learn the basics of project management in this 6 day course taught by Joe DiFalco, PMP, PMI-ACP, CSPO, Systems Engineer. This course covers the 5 process groups and the 47 project management processes grouped into 10 knowledge areas: Project Integration Management, Project Scope Management, Project Time Management, Project Cost Management, Project Quality Management, Project Human Resources Management, Project Communications Management, Project Risk Management, Project Procurement Management and Project Stakeholder Management.

TRANSCRIPT

{

Project Management

Joe DiFalcoPMP, PMI-ACP, CSPO, Systems Engineer

Owner CVShout™

Profile: CVShout.com/joedifalcoContact: joe@cvshout.com

Review of the Project Management Body of Knowledge (PMBOK) 5th edition

Day 4 review Budget Earned value management Follow the Lifecycle – build a schedule

Knowledge Areas Ethics topics Stakeholder topics

Day 5 Agenda

From PMBOK 5th Edition

Note: the numbers in the chart refer to the chapter in the PMBOK

Review Cost Management Plan

• Responsibilities• Approach• Measurement• Reporting• Variance response• Change control

Example

Estimate Costs

Reserve analysis:• Account for cost uncertainty• Could be a fixed %, fixed number or some other calculation• CONTINGENCY reserve

• Allocated for identified risks or “known-unknowns”• Clearly documented• Part of the cost baseline

• MANAGEMENT reserve• Reserved for unforeseen work or “unknown-unknowns”• NOT part of the cost baseline but ARE part of the budget and funding requirements• Management reserves are added to cost baseline as they are approved/used

Determine Budget

• Aggregation of the estimated costs of individual activities (work packages)• Authorized cost baseline• Use this baseline to monitor and control project performance• Project budget includes ALL of the funds authorized to execute the project

• Cost baseline is the time-phased budget excluding MANAGEMENT reserves

Project Budget ComponentsKnown un-Knowns

un-Known un-Knowns

This is the level of granularity to track measurement

Project Budget Components

Reserves

Contingency vs Management reserves

Project Budget ComponentsAnticipated

Funds required to start

Projected disbursement points

From PMBOK 5th Edition

Note: the numbers in the chart refer to the chapter in the PMBOK

Control Costs

From PMBOK 5th Edition

• Monitor project status• In relation to the value of work accomplished

• Update project costs• Manage cost baseline• Recognize variance – take corrective action

Control Costs

From PMBOK 5th Edition

Control Costs

From PMBOK 5th Edition

Question: what actions would you expect to take to manage costs?

• Follow the management plan• Utilize OPAs that are available• Manage change –

• Prevent unnecessary change• Influence factors that cause cost to rise• Communicate approved change requests

Exam tips:• Control means measure• Measurement reveals variance – variance is analyzed • Cost management plan tells you what to do to control cost

Earned Value Management (EVM)

From PMBOK 5th Edition

• Assess project performance and progress• Scope• Schedule• Resource measurements• Progress rules• 50/50 – activity is 50% when started• 20/80 – activity is 20% when started• 0/100 – activity is 100% when completed

• Integrates• Scope baseline• Cost baseline• Schedule baseline• Note: the Performance Measurement

Baseline (PMB) is the combination of these

Planned Value (PV)

From PMBOK 5th Edition

The approved budget for the work scheduled to be completed by a specified date.

• Scheduled work• Work for an activity (work breakdown component)• Defines the physical work that SHOULD have been

accomplished• Total of all PV can be referred to as:

• Total PV is also: budget at completion (BAC)

Earned Value (EV)

From PMBOK 5th Edition

The approved budget for the work actually completed by the specified date

• Measure of work performed• Based on PV (authorized budget)• Percent complete of a project• EV cannot be greater than PV• Monitored:

• Incrementally – for current status• Cumulatively – performance trends

Actual Cost (AC)

From PMBOK 5th Edition

• Realized cost incurred• Cost of work performed during a time period• Specific to the work that the EV measured• Corresponds to what was planned – PV• Has no upper limit – it is what it is

Earned Value

From PMBOK 5th Edition

Formulas to memorizeSchedule Variance (SV)

From PMBOK 5th Edition

Formulas to memorizeCost Variance (CV)

From PMBOK 5th Edition

Formulas to memorizeSchedule Performance Index(SPI)

From PMBOK 5th Edition

Formulas to memorizeCost Performance Index(CPI)

From PMBOK 5th Edition

Formulas to memorizeEstimate at Completion(EAC)

From PMBOK 5th Edition

Formulas to memorizeEstimate to Complete (ETC)

From PMBOK 5th Edition

Formulas to memorizeTo Complete Performance Index(TCPI)

From PMBOK 5th Edition

Formulas to memorizeTo Complete Performance Index(TCPI)

From PMBOK 5th Edition

Formulas to memorizeVariance at Completion(VAC)

From PMBOK 5th Edition

Earned Value Measurement

From PMBOK 5th Edition

Examples

Earned Value Measurement

From PMBOK 5th Edition

Exercise

Earned Value Measurement

From PMBOK 5th Edition

Status after 1 hour

Earned Value Measurement

From PMBOK 5th Edition

Use EVM to forecast

Develop Schedule

From PMBOK 5th Edition

Construct a House

Ethics

From PMBOK 5th Edition

Code of Ethics andProfessional Conduct

Stakeholder Management

From PMBOK 5th Edition

Stakeholder Management

From PMBOK 5th Edition

Stakeholder Management

From PMBOK 5th Edition

Identify Stakeholders

From PMBOK 5th Edition

Inputs

Identify StakeholdersTools & Techniques

Stakeholder AnalysisTools & Techniques

From PMBOK 5th Edition

Identify Stakeholders

From PMBOK 5th Edition

Outputs

Plan Stakeholder Management

From PMBOK 5th Edition

Inputs

Plan Stakeholder Management

From PMBOK 5th Edition

Tools & Techniques

Plan Stakeholder Management

From PMBOK 5th Edition

Outputs

Manage Stakeholder Engagement

From PMBOK 5th Edition

Manage Stakeholder EngagementInputs Comm Mgmt

Stake Mgmt

Manage Stakeholder Engagement

From PMBOK 5th Edition

Tools & Techniques

Manage Stakeholder Engagement

Outputs

Control Stakeholder Engagement

From PMBOK 5th Edition

Inputs

Tools & TechniquesOutputs