project grow, st. paul lutheran, jefferson, md

Post on 15-Apr-2017

133 Views

Category:

Spiritual

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

- Phase 1: Elevator Addition to the east of the building, including a new entry to the Pathway Room

- Phase 2: Stair & Restroom Addition to the east of the existing stair. This provides the church with an adequate number of plumbing fixtures and compliance with ADA.

- Phase 3: Narthex/Office Addition to the east of the building, containing a large narthex at each floor, offices and classrooms, and the relocation of the main driveway on center with the Parsonage.

- Future phases will look at a new Social Hall on the site of the existing Parsonage.

Phased Approach

Phase 1: Elevator Addition

Phase 1: Elevator Addition

Phase 2: ADA Restrooms

Phase 2: ADA Restrooms

Phase 3: Annex Addition

Phase 3: Annex Addition

PRELIMINARY TIMELINE

Cost Estimate