Mumbai High South Project
•Client (EPIC Main Contractor)- Afcons- Gunanusa JV• Company- Oil and Gas Corporation Limited, India (ONGC)• Project- Mumbai High South re-development – ICP-R• Scope- New Process Platform ICP-R- New Flare Tripod ICP-F3- Bridge between ICPR and existing ICG Process platform• Fabrication Location- Topsides & Bridge PT Gunanusa - west Java- Jacket & Flare Tripod Kencana Lumut - Malaysia)• Location- Arabian Sea, India, 165km North West from Mumbai• Vessel- Hermod• Installation Date- 26 December 2010
Mumbai High South ProjectTransportation Barges
Kencana Yard, Lumut, MalaysiaSLB-1• Launch JacketHMC Mizohu• 12 x 72” Skirt Piles• Boatlanding• Misc. shipped loose itemsMaritime Glory• Tripod Jacket• 3 x 60” Skirt Piles• Flare
Gunanusa Yard, Jakarta, IndonesiaSealink 4048• MSF• BridgeJMC 3331• PGC Module• TG ModuleMaritime Pride• Separator Module
• Building Module
Mumbai High South ProjectICP-R Jacket
General info:
• footprint = 45 x 37 m
• top = 25 x 16 m
• height = 89 m
• weight = ~ 5700 m.T.
• water depth = 75.6 meter
• type: launch
• single crane upend with ballasting from SSCV