presentation of company axis a.s. -...

Post on 20-Apr-2018

218 Views

Category:

Documents

4 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Presentation of company AXIS a.s.

AXIS was founded in 1993 in Hradec Kralove

and is hold by appropriate Czech holders

At present we have 220 regular employes

and cooperate with our partners all over the World

WELCOME TO AXIS a.s.

Experience

Quality

Proven price

Exact delivery dates

Reliable partnership for long term cooperation

The world is in our hands

WHAT DO WE OFFER ?

MANUFACTURING OF:

• Gas turbine filter houses

• Gas turbine inlet systems

• Coupling guards for gas turbines

• Skids for Process equipment

• Steel tructures

• Conveyors

• Ducts

• Carbon/Stainless steel weldments

• Tanks – Silos

• Pressure vessels

AXIS on map

Headquarter

Preparation workshop

Stainless steel workshop 2000m2

• 1 x 12,5 t crane • 1 x 6,3 t crane • 2 x 6,3 t crane

Storage area

New AXIS facility area

New facility area as indicated on left is to be reconstructed to improve fabrication capacities. Carbon steel fabrication already started in existing workshops, area 10.000m2

Machinery

CNC Hydraulic Press Brake SAFAN H-Brake 6 m lenght Max. operating pressure 480 ton

Machinery

Watter Jet PTV 2000 mm x 6000 mm Operating pressure 4100 bar 3D cutting head Scarfing available Max. steel sheet thickness 150 mm Cutting of steel, plastic, glas, stone, rubber…

GE Energy Referenced projects

PROJECT DESCRIPTION PROJECT NAME GE CUSTOMER YEAR

2 Units 20 bag Stainless Steel Filter House Total ROSSA GE Energy Alton / Clarcor 2014

6 Units 6 x 15t support structure Sabine Pass SPX – Balcke Durr Italiana 2013/2014

12 Units ducts stainless parts - retrofit Cessao Onerosa GE Energy Alton 2013/2014

4 Units Stainless Steel Filter House CKX Hess GE Energy Alton 2013

2 Units upper/lower modules for FH Sabine Pass SPX – Balcke Durr Italiana 2013

5 Units Stator frame of gas turbine generator BDAX 62 BRUSH SEM - GE Energy 2013

3 Units Stainless Steel inlet units NOBLE O&G Nuovo Pignone, Italy 2013

1 Unit 9 bag prototype holding frame prototype GE Energy Alton 2013

2 Units 36 bag Stainless Steel Filter House KINABALU Rolls – Royce Energy

Systems 2013

1 Units ducts stainless parts - retrofit Buchan Alpha GE Energy Alton 2013

GE Energy Referenced projects

PROJECT DESCRIPTION PROJECT NAME GE CUSTOMER YEAR

10 Units Stainless Steel welded parts QC Coil GE Energy Alton 2013

8 Units Vane stainless separators separators GE Energy Alton 2012

2 Units Coulping guard - multishaft ERZIN GE Energy France 2012

2 Units Coulping guard - singleshaft ERZIN GE Energy France 2012

3 Units Instrumental panels LAGGAN GE Energy Alton 2012

2 Units Stainless Steel Filter House Gladstone Santos 2012

2 Units Stainless Steel Ventilation Filter

House LEMAN SHELL 2012

3 Units Frames retrofit – Modec Ghana HARMATTAN Modec Ghana 2012

10 Units Stainless Steel Transitions Wheatstone Chevron 2012

GE Energy Referenced projects

PROJECT DESCRIPTION PROJECT NAME GE CUSTOMER YEAR

2 Units Combustion Air Intake Filter System FAST FERRY GE AVIATION 2011

2 Units 48 bag Stainless Steel Filter House KPOC O&G Nuovo Pignone, Italy 2011

3 Units 88 bag Stainless Steel Filter House LAGGAN O&G Nuovo Pignone, Italy 2011

2 Units 40 bag Stainless Steel Filter House BRUNEI SHELL Dresser Rand, Norway 2011

3 Units 54 bag Stainless Steel Filter House CHEVRON JACK O&G Nuovo Pignone, Italy 2011

3 Units 35 bag Stainless Steel Filter House BIG FOOT Dresser Rand, Norway 2011

3 Units 110 bag Stainless Steel Filter House N’Kossa O&G Nuovo Pignone, Italy 2011

4 Units 54 bag Stainless Steel Filter House CLOV O&G Nuovo Pignone, Italy 2011

8 Units 48 bag Painted Stainless Steel Filter

House P57 PETROBRAS O&G Nuovo Pignone, Italy 2011

5 Units Stainless Steel Ventilation Filter

House GORGON O&G Nuovo Pignone, Italy 2011

5 Units Air Treatment System comprising MULTIBRID AREVA, Germany 2011

GE Energy Referenced projects

FABRICATION EXAMPLES

Black Trial Assembly – Painted Carbon Steel Filter House for Frame 7

FABRICATION EXAMPLES

64 bag Stainless Steel painted Filter House for Gas Turbine 100 bag Stainless Steel Filter House for Gas Turbine

FABRICATION EXAMPLES

48 bag Stainless Steel painted Filter House for Gas Turbine 54 bag Stainless Steel Filter House for Gas Turbine

FABRICATION EXAMPLES

36 bag Stainless Steel painted Filter House with Anti Ice Rake for LM2500 Gas Turbine

FABRICATION EXAMPLES

36 bag Stainless Steel painted Filter House with Anti Ice Rake for LM2500 Gas Turbine

FABRICATION EXAMPLES

Inlet System for Gas Turbine Duct with Inlet Bleed Heating pipework and nozzles

FABRICATION EXAMPLES

Inlet System for Gas Turbine Silencer with perforated sheets and acoustic pillows

Elbow with insulation and cladding panels

FABRICATION EXAMPLES

FABRICATION EXAMPLES

FABRICATION EXAMPLES

Production of inlet/outlet ducts and retrofits

FABRICATION EXAMPLES

FABRICATION EXAMPLES

Pipe/Skid pre/fabrication

FABRICATION EXAMPLES

FABRICATION EXAMPLES

FABRICATION EXAMPLES

FABRICATION EXAMPLES

Stator frames of generators for

gas turbines - energy sector

FABRICATION EXAMPLES

FABRICATION EXAMPLES

Various steel structures with FIT-UP and surface treatement HDG, painting

FABRICATION EXAMPLES

FABRICATION EXAMPLES

Complete realization

of breweries Production of pressure vessels

FABRICATION EXAMPLES

Complete realization

of breweries

FABRICATION EXAMPLES

Production of telescopic arms and cover housings

FABRICATION EXAMPLES

Production of pipelines – stainless/carbon steel

FABRICATION EXAMPLES

Production of distributing units

General contractor for complete industrial plants Piping installation

Tanks installation

Installation of Paper machines and technology

Installation of technological lines

INSTALLATION ACTIVITIES

Reconstruction – Rebuilding of Paper machines and other technological equipment, lines

Dismantling of technological equipment, lines

Relocation of Paper machines

Installation of Steel structures

INSTALLATION ACTIVITIES

SIEMENS AG UK Installation of Plant Structural Steelwork “SAICA PM11 ERB”

Installation

FLSmidth, Denmark Assembly of Electrostatic precipitator

Installation

KIMBERLY CLARK Project NERO, Installation of JE Jacobs US technology, general contractor for piping incl. installation

Installation

BRUNNSCHWEILER UK Installation of ventilation system and hood PM “SAICA PM11”

Installation of steam & condensate piping, heat exchangers

Installation

BRUNNSCHWEILER UK Installation of HVAC, steam & condensate piping, heat exchangers

Installation

FMT Rebuilding works – Press section refurbishment, After dryer installation

Installation

Kronospan Russia – 2 projects Ufa and Yegorjevsk Full installation of technology for OSB panels fabrication

Installation

SYNTHOS Kralupy_BRONSWERK HEAT TRANSFER Installation of air cooling system (STYREN) incl. piping

Installation

SMS SIEMAG Alabama

Installation

LAB – Oxford UK

Installation

Certification

Headquarters in Hradec Králové AXIS a.s. Kydlinovská 29 500 02 Hradec Králové, Czech Republic phone: +420 498 654 311 fax: +420 498 654 339 e-mail: axis-hk@axis-hk.cz (company management) Branch Štětí AXIS a.s. Litoměřická 250 www.axis-hk.cz 411 08 Štětí Czech Rebublic, Europe phone.: +420 498 654 361 fax: +420 498 654 360 e-mail: axis02@axis-hk.cz

Company contacts

top related