practical application of gi technique rev 0 haki pdf
Post on 13-Jan-2017
1.298 Views
Preview:
TRANSCRIPT
Bauer Design & Construction Systems
PRACTICAL APPLICATIONS OF GROUND IMPROVEMENT TECHNIQUES
Gavin Chung Regional Manager Senior Manager Bauer South East Asia Pacific Region Bauer (M) Singapore Ground Improvement Division
Indonesian Society of Civil and Structural Engineers (HAKI) 14th December 2013
2
Indonesian Society of Civil and Structural Engineers (HAKI) 14th December 2013
CONTENTS
Principles of Ground Improvement
Ground Improvement Techniques
Selection of Techniques
Type of Applications
Liquefaction
Bauer-Betterground Range of Techniques
3
PRINCIPLES OF GROUND IMPROVEMENT
Consolidation Techniques that drains and reduction of voids
Inclusion / Reinforcement Techniques that introduce foreign elements to improve in situ soil
Compaction Techniques that densify soil by compaction
Ground improvement methods are used to improve unsuitable subsurface soils and/or to improve the performance of structures or embankments. These methods are used when replacement of the in-situ soils is impractical because of physical limitations, environmental concerns, or other conventional methods are costly. Functions:
Increase bearing capacity, shear, or frictional strength, Increase density, Control deformations, Increase or provide lateral stability, Form seepage cutoffs or fill voids, Transfer embankment loads to more competent layers, and Increase resistance to liquefaction.
4
PRINCIPLES OF GROUND IMPROVEMENT
5
GROUND IMPROVEMENT TECHNIQUES
Ground Improvement
Consolidation
PVD + Surcharge
Vacuum Consolidation
Stone Column + Surcharge with
or w/o PVD
Reinforcement
Vibro – Stone Column,
Concrete Column
Soil-Cement mix – SCC, CSM, FDC
Grouting
Compaction
Vibro Compaction
Dynamic Compaction
6
GROUND IMPROVEMENT TECHNIQUES Category Function Methods
Consolidation Accelerate consolidation , increase shear strength and increase density with time
a. Prefabricated Vertical Drain b. Vacuum Consolidation
Reinforcement
In soft foundation soils, increases shear strength, density, improves resistance to liquefaction and reduce settlements
a. Vibro Stone Columns b. Vibro Concrete Columns c. Dynamic Replacement
Physio-chemical alteration of foundation soils to increase their tensile, compressive, and shear strength; reduce settlement; and to provide lateral stability confinement
a. Soil Cement Mix - Soil Cement Column - Cutter Soil Mix - Full Displacement Column
To form fill voids, increase density, increase tensile and compressive strength
a. Grouting - Permeation, Compaction, Jetting & Compensation
Compaction
Increase instantaneous density, bearing capacity, and frictional strength of granular soils. Reduce settlement and increase resistance to liquefaction
a. Vibro Compaction b. Dynamic Compaction
7
SELECTION OF TECHNIQUES
8
SELECTION OF TECHNIQUES
Step Selection Process
1 Suitability of technique (soil and technique compatible)
2 Technical/Performance compliance
3 Possible damage to adjacent structures
4 Construction time available for ground improvement
5 Cost – (check material availability & compare techniques)
6 Environmental issues influencing the technique
9
SELECTION OF TECHNIQUES
Soil Description Densification Reinforcement
Gravel and sand <10% silt, no clay
Excellent Very good
Sand - 10% to 20% silt and <2% clay
Very good Very good
Sand - >20% silt and non-plastic silt
Marginal (with large displacement)
Excellent
Clays Not applicable Excellent
Example of selection with Stone Column
Treatment depth of vibro stone column can be up to 30m
Example of selection with Vibro Compaction Soil Description Densification
Well graded sand <5% silt, no clay Excellent
Uniform fine to medium sand with <5% silt and no clay
Good
Silty sand with 5% to 10% silt and no clay
Moderate
Silty sand > 10% and >2% clay Not applicable
Clays Not applicable
Treatment depth of vibro compaction column have been done up to 70m (Lausitz, Germany 1999 by Degen family inventor of vibroflot) Limited improvement in silts can be achieved with stone backfill. Densification base on 70% relative density
10
SELECTION OF TECHNIQUES
EFFECT Accelerate settlement
Reduce settlement
Increase instantly Stability
Mitigate soil liquefaction
PVD, Vacuum + - - - PVD & Preloading + + - -
Columns + + + + Columns & Preloading + ++ + +
Columns & Preload &PVD
++ ++ + +
Soil Mixing n.a. +++ ++ + Jet Grouting n.a. +++ ++ +
11
Information Required For Design Selection Geotechnical report (consist of soil investigation report with location of SI shown with footprint of structures), laboratory test such as soil classification, plastic index, undrained shear strength Cu values or friction angles, consolidation test ie Oedometer, SPT, CPT, Vane Shear, boreholes, ground water table etc. Plan view & cross section of the project Specification for geotechnical solutions Design loads – infrastructure and adjacent buildings Load bearings of structures and drawings of the dimension of structures Engineering performance/design criteria and seismic design requirement, if any Standards and codes expected to follow Design reports for foundation and ground improvement Construction time frame and expected commencement for the ground engineering works. The time allowance is critical in determining a cost effective proposal. For projects involving mitigation of earthquake induced settlements and lateral spreading: Mw, Moment Magnitude and PGA, Peak Ground Acceleration datas required.
The above information is crucial to check the 3 main elements for any ground improvement design: a. Settlement b. Stability c. Liquefaction
12
TYPE OF APPLICATIONS Infrastructure: Energy Industrial Cut-Off Wall Retaining Wall Embankments Airports Highways Reclamations Low Rise Buildings
13
LIQUEFACTION What is “Soil Liquefaction” ?
14
LIQUEFACTION Earthquakes with Magnitude > 5 between 2000 and 2008
15
Effects of liquefaction – Niigata, Japan LIQUEFACTION
16
Bearing capacity failure, Izmit, Turkey. Aug 17th, 1999, M 7.4
Liquefaction – What does it do if not controlled?
LIQUEFACTION
17
LIQUEFACTION
Liquefaction – What happens to uncompacted soil
18
Prediction of Earthquakes?
Globally a Magnitude 6 earthquake happens once a week, Magnitude 5 ≈ 10 times , 4 ≈ 100 times, 3 ≈ 1000 times.
These quakes happen often in uninhabited locations and then generate little or no damage.
The main damage by earthquakes originates from large quakes of a size that only happens a few times in a century.
Per today we are not able to predict location, time, and magnitude of future earthquake events.
This has to do with the fact that in contrast to weather phenomena, the phenomena generating earthquakes occur mainly underground , hidden from direct observation.
The best insight is gained from recording annual movements on the fault lines and from recording the small-earthquake activity.
19
Propagation of earthquake waves (Distance approx. 350 km)
20
Loma Prieta earthquake, San Francisco Bay 1989
Liquefaction Computer Simulation with FLAC
21
Loma Prieta Earthquake 1989
22
LIQUEFACTION MITIGATION
Increase strength ( CRR) Ground improvement (densification or
grouting) Decrease exertion stress ( CSR)
Shear reinforcement with ‘stiffer’ elements within soil mass
Decrease excess pore pressure quickly Reduce drainage path distance with tightly
spaced drains
“What to do?”
23
Stone Columns act as vertical drains, thus
reducing the excess pore pressures that lead to
liquefaction.
The earthquake induced shear stress τ is distributed
onto soil and column in a ratio proportional to the stiffness ratio
between both materials.
LIQUEFACTION MITIGATION
Liquefaction prevention by Stone Columns
24
BAUER-BETTERGROUND TECHNIQUES
Improvement by Consolidation
Improvement by Inclusion/Reinforcement
Improvement By Compaction
Prefabricated Vertical Drain
Vibro Stone Column Cutter Soil Mix
Soil Cement Column
Vibro Concrete Column
Full Displacement Column
Grouting
Vibro Compaction Dynamic Compaction
Dynamic Replacement
25
IMPROVEMENT BY CONSOLIDATION
Indonesian Society of Civil and Structural Engineers (HAKI) 14th December 2013
26
PREFABRICATED VERTICAL DRAIN
Joint Operation
27
IMPROVEMENT BY INCLUSION/REINFORCEMENT
Indonesian Society of Civil and Structural Engineers (HAKI) 14th December 2013
28
VIBRO STONE COLUMN
Vibro Replacement (Wet Top Feed Method)
Vibro Displacement (Dry Bottom Feed Method)
Marine Vibro Stone Column (Dry Bottom Feed Method)
Joint Operation
29
VR – Vibro Replacement
VD – Vibro Displacement
Applications of Vibro Technique
VC – Vibro Compaction
Joint Operation
Vibro Technique
30
VIBRO STONE COLUMN
Joint Operation
31
VIBRO STONE COLUMN Vibro Replacement
Joint Operation
32
VIBRO STONE COLUMN
Joint Operation
33
Vibro Displacement
VIBRO STONE COLUMN
Joint Operation
34
VIBRO STONE COLUMN Vibro Displacement
Bucket Feed System suspended from crane
Excavator Mounted Bottom Feed
Gravel Pump Feed System suspended from crane
Joint Operation
35
VIBRO STONE COLUMN Marine Stone Column (bottom feed system)
Joint Operation
Pressure Chamber Injection System (Double Lock Gate)
36
TR13 TR17 TR85 Excentrical Moment 13 Nm 17Nm 85Nm
Rotation Speed 3250 min-1
= 54Hz3250 min-1
= 54Hz1900 min-1
= 31Hz Centrifugal Force 150kN 193kN 295kN Amplitude: at Excenter +2.3mm +3.4mm +7.5mm
at Tig +3.5mm +6.0mm +10.5mm Install Engine Power 96kW 96kW 224kW Hydraulic Power Requirement H180 H180 HD420
118kW 118kW 240kW180l/min 180l/min 380l/min
Vibrator Tip: JointLength 3100mm 3200mm 3900mmWeight 1010kg 1100kg 2100kgDiameter 300mm 300mm 406mm
Follower Tube Weight 200 kg/m 200 kg/m 240 kg/m Diameter 300mm 300mm 406mm Flush Air/Water Air/Water Air/Water
Vibroflot (Bauer)
VIBRO EQUIPMENT
Joint Operation
37
Vibroflot (Betterground)
VIBRO EQUIPMENT
Joint Operation
38
VIBRO STONE COLUMN 2012: Hong Kong Boundary Crossing Facility
39
VIBRO STONE COLUMN 2012: Hong Kong Boundary Crossing Facility
40
VIBRO STONE COLUMN 2012: Hong Kong Boundary Crossing Facility
41
VIBRO STONE COLUMN
42
Airport Height Restriction
42
43
VIBRO STONE COLUMN
44
VIBRO CONCRETE COLUMN
VCC Process
Joint Operation
45
Data Logger Type (Betterground)
Data Logger Type (Bauer)
QUALITY COTROL (DATA LOGGER)
Joint Operation
46
Cutter Soil Mix (CSM)
Joint Operation
47
CSM Sequence of Work
Cutter Soil Mix (CSM)
CSM Site Configuration
P 1S 2
P 3
S 4
P 5
S 6
P 7S 8
P 9
S 10
P 11
S 12
P 13
S 14
dia 8,5 m
Ø 8,5m
Joint Operation
48
Soil-Cement Mix (Wet Method) with Single Auger
Soil Cement Column (SCC)
Joint Operation
49 Joint Operation
Mixing Tools for Triple Auger
Soil Cement Column (SCC)
50
Single elements Wall elements
Grid patterns Block types
Deep Cement Mix Configuration
Joint Operation
51
Full Displacement Column (FDC)
Joint Operation
52
Permeation Grouting
Permeation grouting – is a process of injection of grout into granular, fissured or fractured ground to produce a solidified mass to support increased load and/or to fill voids and fissures.
Joint Operation
53
Compaction Grouting
Drilling to final depth Start grouting from lowest level Gradually lifting the rod Grouting in steps
Compaction grouting – injected to loose soils, homogenous grout bulbs are formed and displace, densify and strengthen the surrounding soil
Joint Operation
54
Jet Grouting
Joint Operation
55
Compensation Grouting
Compensation grouting – process used to control or reverse the settlement of structures, to induce fractures in the soil thereby causing an expansion to take place counteracting settlement and producing controlled heave.
Joint Operation
56
Dynamic Replacement (DR)
Ground reinforcement technique which inclusion such as stone or sand is compacted into the ground
Typical design of 2.5m diameter column with spacing between 4.5m to 6m with depth up to 4m-5m
Increase bearing capacity, stability, drainage path and reduce settlement
Joint Operation
57
IMPROVEMENT BY COMPACTION
Indonesian Society of Civil and Structural Engineers (HAKI) 14th December 2013
58
Vibro Compaction Vibro compaction applications are use in conditions where existing
cohesionless or slightly cohesive soils can be improve by vibration. The basic principles is that the cohesionless soils can be rearranged by
means of vibration, which requires a combination of high frequency vibration and movement induced by the flushing action of injected water resulting in initial replacement and compression of the surrounding soils.
Densification of granular soils by VC results in: a. Increased bearing capacity of soil b. Reduced foundation settlement c. Increased resistance to liquefaction d. Increased resistance to shear movement
Joint Operation
59
Vibro Compaction 3
Process
Joint Operation
60
Vibro Compaction 3
Marine Vibro Compaction
Joint Operation
61 Joint Operation
• compaction by surface impact,
• Typical drop height: 20 - 30 m,
• Typical weight:10 to 30 tons,
• Economic depth reach: 12 m to 15 m. (depending on material)
Dynamic Compaction
62
Dynamic Compaction VS Vibro Compaction at Depth
Silt Layer
Joint Operation 62
63 For more info: www.bauer.de/en
Special thanks to Dr. Dradjat Hoedajanto, President of HAKI for giving us the opportunity to make this presentation, the support of Mr. Thomas Domanski, Bauer’s Regional Director and our partner Betterground, Dr. Wilhelm Degen.
top related