powerpoint presentation · 4. constructed ground 5. transportation / navigation 5a. new harborwalk...

Post on 01-Jun-2020

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Imagine Boston 2030

Imagine Boston 2030

Climate Ready Boston

Imagine Boston 2030 Resilient BostonClimate Ready East Boston

and Charlestown

Climate Ready South Boston

Climate Ready Boston Moakley Park Study

UMB Finance and Governance Study

Go Boston 2030 Boston Harbor Barrier Study

highly desirable or most favored positive impact

highly undesirable or least favored positive impact

Neutral impact

top related