Existing sewer line goes right through sculpture location
No other suitable location; had to redesign foundation to accommodate sewer line
Accommodates additional viewing space for the front face of the sculpture that looks down stream
Sculpture base finishes will integrate with plaza finishes
•
•
•
••
•