powerpoint presentation€¦ · 11-07-2017  · conceptual foundation layout preliminary costing...

Post on 01-Aug-2020

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

1

2

••

3

4

5

6

7

8

9

10

11

12

13

14

••

••

••

••

Existing sewer line goes right through sculpture location

No other suitable location; had to redesign foundation to accommodate sewer line

Accommodates additional viewing space for the front face of the sculpture that looks down stream

Sculpture base finishes will integrate with plaza finishes

••

top related