powerpoint presentationfiles.ctctcdn.com/29b079d8001/253d5171-844a-4530-bcb0... · 2016-07-31 ·...

Post on 27-Apr-2020

2 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

The Framework for Reimagining Navy Pier

JAMES CORNER FIELD OPERATIONS

JAMES CORNER FIELD OPERATIONS

Transient Boat Slips

Security Zone

PLANNING PRINCIPLES • Integrate transportation in planning for new construction, renovation, and programs

withsensitivity towards impacts on the adjacent neighborhood

• Recognize multimodal environment and desire to accommodate all modes of transportation

in an efficient and balanced way

• Recognize the wide spectrum of user groups at the Pier (e.g., employees, visitors, all ages, levels of mobility, etc.) and strive to balance their respective needs

• Limit the impact of Pier activities, as reasonably feasible, on the surrounding streets while recognizing the role played by Navy Pier as the highest attendance venue in the City

• Promote non-auto transportation options to limit traffic impacts, particularly during peak -attendance events

• Integrate design elements and character to enhance pedestrian safety and scale

• Manage on-and off -site parking facilities to maximize efficiency and provide opportunities to distribute traffic impacts

• Maintain a close working relationship with City staff and representatives to coordinate on transportation-related issues

PLAN ELEMENTS AND STRATEGIES

• Vehicle Access + Parking

• Pedestrians

• Bicycles

• Trolley

• CTA

• School + Charter Buses

• Taxi + Rideshare Services

• Water Taxi

VEHICLE ROUTE

VEHICLE ROUTE

PARKING

SCHOOL / CHARTER BUS PEDESTRIANS

BICYCLES TRANSIT

PLANNED PROJEC

COMMUNICATION + COORDINATION

• Online

• Navy Pier Mobile App

• Traditional + Social Media

• Coordination with City Agencies, Community Organizations, and

Neighboring Properties

Completed Work Remaining Work

top related