TRANSCRIPT

Connecting continents

TRANSPORT ROUTES FOR HEAVYWEIGHT EQUIPMENT

Kuryk

Pavlodar

«HEAVY» CENTRAL ASIA ???

long distances poor infrastructure harsh weather conditions Unique laws and regulation parched rivers customs barriers lack of technology

Main delivery routes for OVERSIZED and HEAVY EQUIPMENT

Along North Sea Routes, Obskaya Bay and Irtysh river

Through Black/Azov Sea, Volgo-Don Channel, Caspian Sea

ALONG NORTH SEA ROUTES

Navigation for vessels with ice-class lower than 1А (Аrk 4) open from July till September

ALONG NORTH SEA ROUTES

Transshipment in Obskaya Bay, direct with vessels gears to barges

ALONG NORTH SEA ROUTES

Onshore complex in Salekhard port is able to transship cargo with maximum weight 350 tons from river-sea vessels to barges

SUPERHEAVY CARGO RIVER TRANSPORTATION THROUGH OB AND IRTYSH RIVERS

Barges from 300 tons till 5.000 tons capacity are exploited

INFRASTRUCTURE CONDITIONS

RO-RO JETTY

VOLGO-DON CHANNEL

Atyrau

Aktau Kuryk

Turkmenbashi

Astrakhan

Rostov on Don

Possibility to arrange barge transportation of superheavy cargo from Black Sea, through Volgo-Don Channel to Caspian Sea ports

SUPERHEAVY CARGO ROAD HAULAGE 1116 tons

TRANSSHIPMENT OF SUPERHEAVY REACTORS ON THE ROAD OF PORT KAVKAZ

DISCHARGING OF SUPERHEAVY REACTORS ON RO-RO JETTY

TRANSPORTATION OF SUPERHEAVY REACTORS FROM RO-RO JETTY TO REFINERY

POWER EQUIPMENT DELIVERY TO GAS-TURBINE POWER PLANT IN TASHKENT

Gas turbine: 1.095 х 495 х 498 cm / 288.000 kg Gas turbine generator: 856 х 534 х 425 cm / 224.540 kg POL Charleston/Albany (USA), Linz(Аustria) POT Constanta (Romania) POD Аktau, Kuryk (Kazakhstan) SITE Тashkent (Uzbekistan)

ON ROAD OVER 3.000 km, CROSSED 162 BRIDGES

EQUIPMENT

ROUTE 7.800 SEA MILES + 3.100 KM

ex USA

TRANSHIPMENT OPERATION FROM SEA VESSEL AND BARGE TO RIVER-SEA VESSEL ON THE ROAD OF PORT CONSTANTA

STREAM TURBINE TRANSSHIPMENT IN KURYK PORT

HEAVYWEIGHT CARGO DELIVERY BY MEAN OF ROAD TRANSPORT FROM PORT KURYK TO GAS-TURBINE POWER PLANT IN TASHKENT

Loading: port Kuryk

Transport: vehicle - 22 axles in 3 lines

total weight 400 t.

Discharge: Tashkent GTPP

Decision:

.

CONSTRUCTION WORKS ON SHEPTE-BEYNEU ROUTE SEGMENT

GAS TURBINE TRANSPORTATION IN UZBEKISTAN

GAS TURBINE TRANSPORTATION IN UZBEKISTAN

CERTIFICATES

General contractor certificate for construction operations (construction of - berths, circumurban roads, bridges, etc.) in Russia № СРОСР-С-3281.1 – 28032012.

CONTACTS

We sincerely hope to see you among our clients.

Together we can take on any project that comes our way.

Efficiency, reliability and innovative solutions to your

complex needs await you at Chandler.

Chandler Moscow Tel.: +7 499 683 00 78 Fax: +7 499 683 00 78