powerlogistics asia 2013- "using hlv ships in offshore wind farm project installation - present...
Post on 29-Nov-2014
501 Views
Preview:
DESCRIPTION
TRANSCRIPT
www.jumbomaritime.nl
Offshore Wind Farm Installation with a Heavy Lift Vessel on DP
www.jumbomaritime.nl
• Facts & Figures
• Jumbo’s Hardware & Track record
• Offshore Wind Scope for DP2 HLVs
1. Offshore supply (feedering)
2. Installation of Transition Pieces
3. Installation of Pre-piles
4. Installation of Jackets + Tripods
• Software requirements
• Questions & Answers
Content
www.jumbomaritime.nl www.jumbomaritime.nl
Facts & Figures
www.jumbomaritime.nl
• Privately owned, independent company
• Founded in 1968
• Personnel: 500 (130 in office)
• Head Office: Schiedam, The Netherlands
www.jumbomaritime.nl
Jumbo’s Hardware The excisting fleet
www.jumbomaritime.nl www.jumbomaritime.nl
Project : Walney Monopile Transport
Client : DONG Energy
Object : Monopiles up to 805t and 65m long
Transport : Rostock (DE) to Barrow-in-Furness (UK)
Comment : Transport of 8 monopiles per voyage
Track record
www.jumbomaritime.nl
www.jumbomaritime.nl
Jumbo’s Hardware DP2 J-1800 class HLVs
Jumbo Javelin & Fairplayer
• DP2
• 2 x 900t mast cranes
• Large box-shaped hold, with multi-level adjustable tween decks (19,800m3)
• Transit speed of max. 17 knots
• Large flush deck (3,100m2)
• Versatile: expandable with project specific tools and systems
www.jumbomaritime.nl www.jumbomaritime.nl
Track record
www.jumbomaritime.nl
Project : Greater Gabbard
Client : Fluor Ltd. / GGOWL
Object : 131 Transition Pieces of 280t each
Location : Southern North Sea, UK
Comment : Installation on pre-installed monopiles
www.jumbomaritime.nl www.jumbomaritime.nl
Track record
www.jumbomaritime.nl
Project : Anholt
Client : MT Hojgaard / DONG Energy
Object : 111 Transition Pieces of 170t each
Location : Anholt, Denmark
Comment : Installation on pre-installed monopiles
www.jumbomaritime.nl
Supporting the offshore wind market with
DP2 heavy lift vessels:
1. Offshore supply (feedering)
2. Installation of Transition Pieces
3. Installation of Pre-piles
4. Installation of Jackets + Tripods
5. Installation of WTGs (not addressed in this presentation)
Jumbo’s Offshore Wind Scope
www.jumbomaritime.nl www.jumbomaritime.nl
1. Offshore supply (feedering)
• Optimize installation schedule
• Utilize cargo capacity of a HLV
• Employ economic sailing capacity of a HLV
• Minimize weather delays
Jumbo’s Offshore Wind Scope
www.jumbomaritime.nl
www.jumbomaritime.nl www.jumbomaritime.nl
Jumbo’s Offshore Wind Scope
www.jumbomaritime.nl
2. Installation of Transition Pieces
• Optimize installation schedule
• Utilize cargo capacity of a HLV
• Employ economic sailing capacity of a HLV
• Minimize weather delays
www.jumbomaritime.nl www.jumbomaritime.nl
3. Installation of Pre-piles:
• Utilize cargo capacity of a HLV
• Efficient sailing and in field shifts
• Robust and precise installation method
Jumbo’s Offshore Wind Scope
www.jumbomaritime.nl
www.jumbomaritime.nl
Installation of Pre-piles: Vessel Lay-out
30 Piles 2,5 m. OD
www.jumbomaritime.nl
Installation of Pre-piles: Template installation
www.jumbomaritime.nl
Installation of Pre-piles: Pile upending
www.jumbomaritime.nl
Installation of Pre-piles: Pile stabbing and vibrating
www.jumbomaritime.nl
Installation of Pre-piles: Pile driving
www.jumbomaritime.nl www.jumbomaritime.nl
4. Installation of Jackets / Tripods:
• Offer complete foundation transport and installation package (incl. pre-piling)
• Utilize cargo capacity of a HLV
• Efficient sailing and in field shifts
Jumbo’s Offshore Wind Scope
www.jumbomaritime.nl
www.jumbomaritime.nl
Installation of Jackets / Tripods: Jumbo’s Hardware
Design criteria for the floating installation
vessel concept (XL-1800):
• Economic sailing at a transit high speed
• Feasible to carry multiple fully assembled jackets
• Shallow draught in port
• Fast and robust installation method
• High workability
• DP2 to avoid anchoring and/or jacking up/down
www.jumbomaritime.nl
Installation of Jackets / Tripods: Jumbo's “XL-1800” Particulars
• Loa 183.00m (excl. Helideck)
• Boa 43.00m
• D 13.00m
• Deadweight 15,000t @ T = 7.00m
• Accomm. 135 PoB
• Main crane 1,800t @ 26m
• Free deck space 5,980 m2
www.jumbomaritime.nl
Installation of Jackets / Tripods: Soil plug removal & pile cleaning
www.jumbomaritime.nl
www.jumbomaritime.nl
www.jumbomaritime.nl
www.jumbomaritime.nl
www.jumbomaritime.nl
Market Approach
• Maintain high HSE & QA/QC standards in
all disciplines
• Add value to projects with knowhow, equipment and efficiency
• Take full project responsibility for transport and installation
• Strive to contract for T&I scope on LS basis
(to have same project incentive as the Client)
Jumbo’s Software
www.jumbomaritime.nl
Knowhow
• In-depth knowledge of offshore lifting operations and heavy lift transport
• In-depth knowledge of offshore surface and subsea installation
• Highly experienced engineering and project management department
• Highly skilled and qualified crew
• Working conform the HSE & QA/QC standards in the offshore O&G industry
Jumbo’s Software
www.jumbomaritime.nl
Jumbo’s Software
HSE & QA/QC
www.jumbomaritime.nl
Thank you for your attention Any questions?
Jumbo Shipping (Singapore) Pte. Ltd
Borge Fogh
Regional Manager, South East Asia