DAVID DIAZMechanical Engineer

PORTFOLIOManufacturing Engineering

Samples

DAVID DIAZMechanical Engineer

PORTFOLIOSome Samples

TRAVELERS AND PROCESS MAPPINGManufacturing Engineer

Options

Information to add(Options: Explain Op. or just Op. Name)

Qty Accepted and Rejected or just accepted or rejected

Approvals & InformationImportant info like what traveler

number to fallow if rework, info about scrap disposition, etc…

DAVID DIAZMechanical Engineer

PORTFOLIOSome Samples

TRAVELERS AND PROCESS MAPPINGManufacturing Engineer

DAVID DIAZMechanical Engineer

PORTFOLIOSome Samples

TRAVELERS AND PROCESS MAPPINGManufacturing Engineer

Job Traveler contains a all possible operations, when operation is not needed just mark N/A or a line and

sign up

DAVID DIAZMechanical Engineer

PORTFOLIOSome Samples

TRAVELERS AND PROCESS MAPPINGManufacturing EngineerMain Job Traveler

(Parent)

Sub Order Job Traveler(Child)

DAVID DIAZMechanical Engineer

PORTFOLIOSome Samples

TRAVELERS AND PROCESS MAPPINGManufacturing Engineer

Other Information to add

DAVID DIAZMechanical Engineer

PORTFOLIOSome Samples

TRAVELERS AND PROCESS MAPPINGManufacturing Engineer

DAVID DIAZMechanical Engineer

PORTFOLIOSome Samples

TRAVELERS AND PROCESS MAPPINGManufacturing Engineer

Ideas:

• Use plastic sheet protectors with different colors or print Job Traveler in different color papers (by Orders and Sub-Orders or by products).

• Create a SOP (Responsibilities, Job Traveler Process Procedure, etc…).

• Include Materials?

“PAPER BOXES REPLACEMENT”

KANBAN SYSTEM

DAVID DIAZMechanical Engineer

PORTFOLIOSome Samples

PROCESS IMPROVEMENT PROJETManufacturing Engineer

Paper Boxes Location on Main Copy Room8.5”X11” Paper11”X17” Paper

NEW PROCEDURE TO REPLACE PAPER BOXES

3 Boxes are Full

for 8.5”X11” Paper&2 Boxes Full for

11”X17” Paper

Box #2 is empty

NEW PROCEDURE TO REPLACE PAPER BOXES

NEW PROCEDURE TO REPLACE PAPER BOXES

Send Kanban Card to

Main Office Receptionist

NEW PROCEDURE TO REPLACE PAPER BOXES

Receptionist to order boxes

NEW PROCEDURE TO REPLACE PAPER BOXES

Receptionist to order boxes

All information needed to make order is already in the Kanban Card

NEW PROCEDURE TO REPLACE PAPER BOXES

Receptionist to send Kanban Card to Manager

NEW PROCEDURE TO REPLACE PAPER BOXES

Manager to approve Order

NEW PROCEDURE TO REPLACE PAPER BOXES

Manager to send Kanban Card to Shipping & Receiving

NEW PROCEDURE TO REPLACE PAPER BOXES

Shipping & Receiving to

receive Boxes

NEW PROCEDURE TO REPLACE PAPER BOXES

Shipping & Receiving to put Boxes in Item location

Shipping & receiving to

put Kanban Card back in

plastic envelope under box #2 &

You can always review the complete process on the back of the Kanban Card

IMPORTANT!Don’t forget to mark each completed step on the back of the

card or erase check marks once the process is complete!

Use markers located on Kanban Folders only:• Main Front Office• Manager Office and• Shipping & Receiving

Office

top related