portfolio 2011
Post on 12-May-2015
243 Views
Preview:
TRANSCRIPT
KelseyHOLTINTERIOR DESIGN
PLANNING & DESIGNEXPERIENCEBoston University
PLANNING & DESIGNEXPERIENCEBoston University
PLANNING & DESIGNEXPERIENCEBridgewater State University
PLANNING & DESIGNEXPERIENCEBridgewater State University
1A2.2
February 17, 2010
3/32" = 1'-0"
Date
Scale
Dwg Title
UP
UP
UP
V
27 33
V
26
V
33
V
BURNELL SCHOOL
132
132C
132D
132E
134136
135 CHILDREN'S CTR
138 GYM
133 MUSIC 130
128
TELECO
MM
119
119B115
118 - IRD
132
101
102 103
121A
132
WOMEN
MEN
122
125
126
124
124A
123
104 105
106
107
114
113
108
112111110
100
MEN
WO
MEN
109
CO
NF
ELEC
TELECOMM
SCIENCEART
ART
ART
Telecomm/IT DRR
29
'2
7'
23
'
MW
121B
UP
UP
UP
V
27 33
V
26
V
33
V
BURNELL SCHOOL
132
132C
132D
132E
134136
135 CHILDREN'S CTR
138 GYM
133 MUSIC 130
128
TELECO
MM
119
119B115
118 - IRD
132
101
102 103
121A
132
WOMEN
MEN
122
125
126
124
124A
123
104 105
106
107
114
113
108
112111110
100
MEN
WO
MEN
109
CO
NF
ELEC
TELECOMM
SCIENCEART
ART
ART
Telecomm/IT DRR
29
'2
7'
23
'
MW
121B
35 Seating
123B
716.75 S.F.
Storage
123A
550.74 S.F.
30 Seating
124
592.82 S.F.40 Seating
125
827.09 S.F.
24 Seating
126
879.74 S.F.
Storage
127A
184.07 S.F.
TELECOM
127B
F F F
F
F Corridor A
Burnell GeneralPurpose Classrooms
Summer 2010
Facilities Management & PlanningOperations Center
200 Great Hill DriveBridgewater, MA 02325
Dwg Number
Furniture Plan
Alternative No. 1 - Floorpreparation and installation of
new carpet.
Cooridor B
1
April 13, 2010
1/8" = 1'-0"
Date
Scale
Dwg Title
Fiscal AffairsProposed Plan
Facilities Management & PlanningOperations Center
200 Great Hill DriveBridgewater, MA 02325
Dwg Number
Proposed Plan
JANITORCLOSET
PURCHASING
DN
207PRESIDENT'SSTORAGE
PUBLIC BATHROOMVESTIBULEWOMENS'
PAYROLL
DIRECTOR OFPURCHASING
DIRECTOR OFBUDGET
ASSOCIATE VP/CONTROLLER
ACCOUNTING (TO REMAIN THE SAME)
PURCHASING & BUDGET
FILE/COPY AREAWAITING AREA
- MOVE PAYROLL TO 2ND FLOOR FROM HR- STUDENT EMPLOYMENT MOVES TO ROOM 103D- INSTITUTIONAL RESEARCH WILL MOVE TO ROOM 101
COLLEGE PERFORMANCE ART CENTERACADEMICDirected Studies Project
First Level Floor Plan Second Level Floor Plan
Section Section
Steel Structure Isometrics
COLLEGE PERFORMANCE ART CENTERACADEMICDirected Studies Project
Section
Section Detail
COLLEGE PERFORMANCE ART CENTER ACADEMICDirected Studies Project
Section
COLLEGE PERFORMANCE ART CENTER ACADEMICDirected Studies Project
Second Level Reflected Ceiling Plan
First Level Reflected Ceiling Plan
PUBLIC BRANCH LIBRARYACADEMICStudio Project
PUBLIC BRANCH LIBRARYACADEMICStudio Project
COMMERCIAL OFFICEACADEMICStudio Project
COMMERCIAL OFFICEACADEMICStudio Project
RESIDENTIAL LOFTACADEMICStudio Project
RESIDENTIAL LOFTACADEMICStudio Project
FP3 PENTHOUSE SEAPORT DISTRICT - BOSTON, MA
7TH FLOOR PLAN1/4"=1'-0"
UP
KITCHEN/ENTERTAINMENT
LIVING ROOM
WEST KITCHEN ELEVATION1/2" = 1'-0" NORTH KITCHEN ELEVATION
1/2" = 1'-0"
8TH FLOOR PLAN1/4"= 1'0"
OPEN TO BELOW
DN
MASTERBATH
CLOSET
MASTERBEDROOM
WORKSPACE/ GUEST
GLASS MUSEUM ACADEMICStudio Project
NIGHT CLUBACADEMICStudio Project
RESTAURANT ACADEMICStudio Project
HAND DRAWINGSABILITIES
CONSTRUCTION DOCUMENTSABILITIES
Wall Detail
Sliding Door Detail
CONSTRUCTION DOCUMENTSABILITIES
Conference Section
Exploded Isometric
RENDERINGSABILITIES
SketchUp
RESUME
EDUCATIONWentworth Institute Of TechnologyBachelor Of Science, Interior Design — August 2011Overall GPA 3.168/4.0
AWARDSPresident’s Award in Interior Design 2011IIDA Providence City Center Student Award 2011• 2nd place winner for Commercial Office entry.Wentworth Institute of Technology Merit Scholarship
COURSEWORK Interior Studio V Technical Drawing Construction Documents Technical Studies Computer Graphics TextilesBusiness Communications Design/Drawing IBuilding Codes & Regulations Interior LightingMaterial & Furniture Specifications Programming Professional Practice History of Interiors
COMPETENCIESTechnicalVectorworks, AutoCAD, Microsoft Office, SketchUp, Revit Architecture, InDesign, Illustrator and Photoshop.DesignConcept Development, Hand Drafting, Space Planning, Presentation Boards, Hand Rendering, 3D Models, Material & Furniture Specifications and Construction/Bid Documents. ProfessionalProject Management, Budgeting, Scheduling, Bookkeeping, Time Management, Customer Service and Collaboration
DESIGN EXPERIENCE Bridgewater State University, Bridgewater, MA Administrative/Project Assistant - Facilities Management & Planning Summer 2009 & Spring 2010• Managed a two-phased office renovation project including furniture installation, carpet replacement, and painting• Produced CAD drawings for proposed space plans and renovations for various departments around campus• Performed daily administrative and customer services tasks, including office attendance, buying and paying for purchases, allocating purchases, bookkeeping, and contacting vendors• Assisted with major move and abatement of an existing building, including correspondents, scheduling, and walk-thrus• Met with faculty to discuss departmental FF&E needs for the new science building, and documented these needs• Reviewed and answered user comments and questions on plans for the construction of the new science building
Boston University, Boston, MA Assistant Designer - Planning & Design Fall 2010 & Summer 2011• Met directly with university clients to discuss programming and designing of offices, classrooms and meeting spaces• Developed space plan proposals and designs, including interior renovations and furniture installations for client approvals• Utilized AutoCad to create bid documents, to include renovation floor plans, reflected ceiling plans, electrical/data plans, furniture plans and specifications• Worked with in-house departments, and vendors to complete furniture installation and renovation construction• Assembled and tracked budget reports for university clients• Designed and renovated a reception area and adjacent office spaces for a university department, which included new wall construction, carpet, ceiling, lighting and workstations
top related