10 Pipeline News November 2017 • www.pipeline-news.com
in developmentPLANNEDProjects(Projects added for the current month are highlighted and in bold face type)
GAS – The Americas U.S. ALASKA GASLINE DEVELOPMENT CORP. –(REV 6/17) Project: Alaska Stand Alone Pipeline Type: Project includes construction of a
transmission pipeline and lateral Length: 763 milesDiameter: 12 and 36 inchesLocation: Prudhoe Bay, AK – Nikiski, AKCapacity: 500 MMcf/dCost: $10 billionStart: 2019Completion: 2023Status: Project is awaiting a Supplemental
Environmental Impact StatementComments: Pipeline is part of the proposed Alaska
LNG Project
ALLIANCE PIPELINE – (5/17)Project: Pacifi c Alliance Pipeline ExpansionType: Project includes addition of compression
facilitiesLocation: Chicago, ILCapacity: 500 MMcf/dContact: Jason Feit Manager, Asset Optimization and
Development (403) 517-6361Status: Project is undergoing an economics
study, with a decision on next steps anticipated by 3Q 2017
Completion: 4Q 2020
AMERICAN MIDSTREAM PARTNERS LP – (REV 6/17)Project: Magnolia Intrastate ExtensionType: Project includes extension of pipelineLength: 45 milesDiameter: 24 inchesLocation: AlabamaCapacity: 500 MDth/dStatus: Project is in the bid phaseCompletion:2019
CABOT OIL & GAS CORP. – (REV 6/17)Owner 2: Williams Partners LPOperator: Constitution Pipeline LLCProject: Constitution PipelineType: Project includes construction of pipeline
and compression facilitiesLength: 124 milesDiameter: 30 inchesLocation: Susquehanna County, PA -
Wright County, NYCapacity: 650 MMcf/dCost: $925 millionDocket: CP13-499Status: New York State blocked the federally
approved pipeline in May 2016 and the company is currently challenging the state’s decision
CANYON MIDSTREAM PARTNERS – (7/17)Operator: Pomelo Connector LLCProject: Pomelo Connector PipelineType: Project includes construction of pipeline
and a compressor stationLength: 14 milesDiameter: 30 inchesLocation: Nueces County, TXCapacity: 400 MDth/dDocket: CP17-26Status: Project is awaiting FERC approval
CHENIERE ENERGY INC. – (REV 7/17)Operator: Midship Pipeline Co. LLCProject: Midship ProjectType: Project includes construction of pipeline,
several laterals, compressor stations and interconnects
Length: 200 milesDiameter: 36 inchesLocation: Grady, OK – Bryan, TXCapacity: 1.4 MMDth/dDocket: CP17-458Status: Project is awaiting an Environmental
Impact StatementCompletion: 1Q 2019
CHESAPEAKE UTILITIES CORP. – (11/16)Operator: Eastern Shore Natural GasProject: 2017 Expansion ProjectType: Project includes pipeline looping,
upgrades to existing metering facilities and installation of a compressor unit
Length: 33 milesLocation: Pennsylvania, Maryland, DelawareCapacity: 86 MDth/dCost: $99 millionDocket: PF16-7Status: Project is currently awaiting a pre-fi ling
review
CRESTWOOD EQUITY – (7/17)Owner: Crestwood EquityProject: DELTA PipelineType: Project includes construction of pipeline Length: 200 milesDiameter: 20 inchesLocation: Reeves County, TX - Orla, TXCapacity: 200 Mcf/dContact: Russ Kovin Senior Vice President, Commercial
Operations, Central US russ.kovin@crestwoodlp.com (832) 519-2260Status: Project is seeking shipper commitmentsCompletion: 3Q 2018
DCP MIDSTREAM – (11/17)Project: Cimarron ExpansionType: Project includes pipeline constructionLength: 48 milesDiameter: 20 and 30 inchesLocation: Beaver County, OKStart: 2Q 2019Comments: Project will run from the Beaver Station
and end at DCP’s National Helium Gas Processing Plant
DENBURY RESOURCES – (7/16)Owner: Denbury ResourcesType: Project includes construction of pipelineLength: 110 milesDiameter: 20 inchesLocation: Glendive, MTStart: 2018
DOMINION ENERGY – (REV 9/17)Owner 2: Duke EnergyOwner 3: Piedmont Natural Gas Owner 4: Southern Company GasOperator: Atlantic Coast Pipeline LLCProject: Atlantic Coast PipelineType: Project includes construction of pipelineLength: 600 milesDiameter: 20, 36 and 42 inchesLocation: Harrison County, WV – Chesapeake, VACapacity: 1.5 Bcf/dCost: $5.1 billionDocket: CP15-554Status: Project has received a Final Environmental
Impact StatementStart: 4Q 2017Comments: Project has awarded construction
contracts to Spring Ridge Constructors LLC, U.S. Pipeline Inc., SMPC LLC and Rockford Corp.
Project: Supply Header ProjectType: Project includes pipeline construction and
facility modifi cationsLength: 38 milesDiameter: 30 inchesLocation: Westmoreland County, PA; Wetzel County,
WVCapacity: 1.5 MMDth/dCost: $500 millionDocket: CP15-555Status: Project has received a Final Environmental
Impact StatementStart: 4Q 2018Completion: 4Q 2019Comments: Project will move Marcellus Shale gas
from Ohio, West Virginia and Pennsylvania into the Atlantic Coast Pipeline for further delivery to Virginia and North Carolina
Project: Sweden Valley ProjectType: Project includes pipeline construction,
compressor station modifi cations and new metering and regulation facilities
Capacity: 120 MDth/dCost: $48 millionStatus: Project is preparing to fi le an application
for a Certifi cate of Public Convenience and Necessity with FERC
Completion: 4Q 2019Comments: Project will help meet growing demand
for natural gas to serve Midwest markets
DRIFTWOOD LNG PIPELINE LLC – (8/16)Project: Driftwood LNG PipelineType: Project involves dual lay of pipelineLength: 96 milesDiameter: 36 and 42 inchesLocation: Calcasieu Parish, LA - Evangeline Parish,
LA
www.pipeline-news.com • November 2017 • Pipeline News 11
Capacity: 4 Bcf/dDocket: CP17-118Status: Project has submitted a formal application
with FERCStart: 2018Completion: 2022Comments: Pipeline is part of the proposed Driftwood
LNG Project
DTE ENERGY – (REV 11/17)Operator: Birdsboro Power LLCProject: Birdsboro PipelineType: Project includes construction of pipelineLength: 14 milesDiameter: 24 or 30 inchesLocation: Oley Township, PACapacity: 79 MDth/dContact: Kenneth Magyar VP, Project Development & Business
Development (724) 416-7263Docket: PF17-1Status: Project is awaiting an Environmental
Assessment Start: 2Q 2018
Owner 2: Spectra Energy Partners LPOperator: NEXUS Gas Transmission SystemProject: NEXUS ProjectType: Project includes pipeline construction
and four compressor stationsLength: 255 milesDiameter: 42 inchesLocation: Ohio, Michigan and OntarioCapacity: 1.5 Bcf/dCost: $2 billionDocket: CP16-22Status: Project has received federal approval
and is preparing for construction
Contractor: FluorType: Front-end engineering and design
Contractor: Michels Corp.Type: Pipeline constructionLocation: Ohio and Michigan
Contractor: Latex ConstructionType: Pipeline constructionLocation: Ohio
Contractor: M.G. Dyess Inc.Type: Pipeline constructionLocation: Ohio
DUKE ENERGY – (6/17)Project: Central Corridor Pipeline ExtensionType: Project includes expansion of existing
pipelineLength: 12 milesDiameter: 20 inchesLocation: Raleigh, NCStart: 3Q 2018Completion: 2019
Type: Project includes construction of pipelineLength: 13 milesDiameter: 20 inchesLocation: Cincinnati, OH
Status: Project is undergoing public hearings. If built, pipeline will increase the reliability of natural gas delivery in central Cincinnati
ENABLE MIDSTREAM PARTNERS – (2/17)Operator: Oklahoma Gas and Electric (OG&E) Project: Muskogee PipelineType: Project includes construction of pipeline
and associated metering facilities
Length: 77 milesDiameter: 20 inchesLocation: OklahomaCapacity: 228 Mcf/dCost: $70 millionStart: 2018Comments: The 20-year contract will support OG&E’s
planned conversion of two 500 megawatt coal-fi red generating units to natural gas
PLANNEDProjects in development
12 Pipeline News November 2017 • www.pipeline-news.com
Location: Coquitlam to Squamish, B.C.Capacity: .23 Bcf/dCost: $350 millionStatus: Project is in the pre-application phaseComments: Project will expand a portion of the
existing natural gas transmission system and is asso-ciated with the proposed Woodfi bre LNG Facility
Contractor: Hedberg & Associates Consulting Ltd.Type: Project includes access planning,
permitting and LiDAR design for pipeline routing
Cost: $250 million
GULF SOUTH PIPELINE LP – (REV 11/17)Project: St. Charles Parish Expansion ProjectType: Project includes construction of
pipeline and a new compressor stationLength: 1.25 milesDiameter: 16 inchesLocation: Montz, LACapacity: 133 Mcf/dCost: $30 millionDocket: CP16-47Status: FERC has issued an Environmental
Assessment for the projectCompletion: 3Q 2018
IROQUOIS GAS TRANSMISSION SYSTEM LP– (6/17)Project: Wright Interconnect ProjectType: Project includes construction of
a compression facility and facility modifi cations
Location: Wright, NYCapacity: 650 MDth/dDocket: CP13-502Completion: 2Q 2018Comments: Project is being developed in conjunction
with the proposed Constitution Pipeline
KINDER MORGAN INC. – (11/17)Owner 1: Kinder Morgan Texas Pipeline LLC (50%)Owner 2: DCP Midstream LP (25%)Owner 3: Targa Resources Corp. (25%)Project: Gulf Coast Express Pipeline ProjectType: Project includes construction of a
pipeline lateralLength: 50 milesDiameter: 36 inchesCapacity: 1.92 Bcf/dStatus: Project is seeking defi nitive agreements
with shippers and awaiting a fi nal investment decision
Completion: 2Q 2019Comments: Project will provide an outlet for
increased natural gas production from the Permian Basin to growing markets along the Texas Gulf Coast
Owner 2: Southern Co.Operator: Southern Natural Gas Co. LLCProject: Fairburn Expansion Project Type: Project includes construction of a pipeline
lateral, pipeline looping and a compressor station
Length: 7 milesDiameter: 30 inchesLocation: Atlanta, GACapacity: 343 MDth/dCost: $240 millionDocket: CP17-46
Status: Project is awaiting FERC approvalCompletion:2018
Operator: Tennessee Gas Pipeline Co. LLC Project: Lone Star ProjectType: Project includes construction of two
compressor stationsCapacity: 300 MDth/dCost: $132 millionLocation: Jackson and San Patricio counties, TXDocket: CP16-496Status: FERC has issued an Environmental
Assessment for the project
Project: SK PipelineType: Project includes construction of pipeline
and additional compressor facilitiesLength: 40 milesDiameter: 30 inchesLocation: West Columbia, TX - Stratton Ridge, TXCapacity: 320 MDth/d Cost: $150 millionStart: 4Q 2017Completion:3Q 2019 Comments: Project will support Train III export
capacity as part of the Freeport LNG Export Project
Operator: Kinder Morgan Texas Pipeline LLCProject: Gulf Coast Express Pipeline ProjectType: Project includes construction of pipelineLength: 430 milesDiameter: 42 inchesLocation: Waha, TX - Agua Dulce, TXCapacity: 1.7 MMDth/dStatus: Project is undergoing an open seasonCompletion:2Q 2019
Operator: Kinder Morgan Louisiana Pipeline LLC Project: Sabine Pass Expansion ProjectType: Project includes construction of a tap
and lateral; modifi cation of three existing delivery interconnects; construction of additional compression; construction of header pipelines; and the abandonment and replacement of a meter station
Length: 1.6 milesLocation: Cameron Parish, LACapacity: 600 MDth/dDocket: CP17-22Status: Project is awaiting FERC approvalStart: 2Q 2018Completion:2Q 2019Comments: Modifi cations will enable bidirectional fl ow
Operator: Kinder Morgan Louisiana Pipeline LLCProject: Lake Charles Expansion ProjectType: Project includes installation of new
compression facilities and header pipelines
Length: 1.5 milesDiameter: 24 and 26 inchesLocation: Evangeline Parish, LACapacity: 1.4 MMDth/dDocket: CP14-511 Status: Project is awaiting FERC approvalCompletion: 2018Comments: Project includes reconfi guration of an
existing pipeline system to accommodate natural gas service at the proposed Magnolia LNG terminal
Operator: Tennessee Gas Pipeline Co. LLC
EQT CORP. – (REV 11/17)Owner 2: NextEra US Gas Assets LLCOperator: Mountain Valley Pipeline LLCProject: Mountain Valley PipelineType: Project includes construction of
pipeline and three compressor stationsLength: 301 milesDiameter: 42 inchesLocation: Wetzel County, WV - Pittsylvania
County, VACapacity: 2 MMDth/dCost: $3.5 billionDocket: CP16-10Status: West Virginia environmental regulators
revoked the project’s water quality certifi cation following review of the projected impact on the state’s waters
Start: 4Q 2017Completion: 4Q 2018
EQT MIDSTREAM PARTNERS LP – (REV 11/17)Project: Equitrans Expansion ProjectType: Project includes construction of
pipeline and expansion of existing compressor stations
Length: 8 milesDiameter: 6 and 30 inchesLocation: Greene, Allegheny and Washington
counties, PA; Wetzel County, WVCapacity: 600 MDth/dCost: $172 millionDocket: CP16-13Status: FERC has delayed the release of its fi nal
Environmental Impact StatementComments: Project will utilize existing
interconnects, including Texas Eastern Transmission LP and Dominion Transmission Inc., as well as a proposed future interconnect with Mountain Valley Pipeline LLC
FAIRBANKS PIPELINE CO. – (REV 8/15)Project: Arctic Fox PipelineType: Project includes construction of pipeline
and a secondary transmission networkLength: 514 milesDiameter: 4 and 12 inchesLocation: Prudhoe Bay - North Pole, AKCapacity: 19 Bcf/yCost: $1 billionStatus: Project is delayed
FLORIDA GAS TRANSMISSION – (REV 7/17)Project: East-West ProjectType: Project includes construction of two
laterals and facility modifi cationsLength: 20 milesDiameter: 12 inchesLocation: Matagorda and Wharton counties, TX;
Acadia Parish, LACapacity: 275 MMDth/dCost: $68.9 millionDocket: CP17-8Status: Project is awaiting an Environmental
Assessment
FORTISBC – (REV 9/17)Operator: Woodfi bre Natural Gas Ltd.Project: Eagle Mountain – Woodfi bre Gas PipelineType: Project includes pipeline construction and
compressor station upgradesLength: 29 miles Diameter: 24 inches
www.pipeline-news.com • November 2017 • Pipeline News 13
PLANNEDProjects in development
Project: ACR ProjectType: Project includes abandonment of
certain natural gas pipeline facilities and modifi cations of existing pipeline facilities and compressor stations
Length: 14 milesDiameter: 2 , 16, 30 and 36 inchesLocation: Louisiana - New York City- Boston Docket: CP15-88Status: FERC has issued an Environmental
Assessment for the project
MDU RESOURCES GROUP INC. – (8/17)Operator: WBI Energy Inc.Project: Line Section 27 ExpansionType: Project includes pipeline construction and
associated facilitiesLength: 13 milesDiameter: 24 inchesLocation: North DakotaCapacity: 600 MDth/dCost: $30 millionCompletion: 4Q 2018
MILLENNIUM PIPELINE CO. – (REV 11/17)Project: Eastern System UpgradeType: Project includes construction of looped
pipeline, new compression capabilities and upgrades to existing stations
Length: 10 milesDiameter: 36 inchesLocation: Rockland County, NYCapacity: 200 MDth/dCost: $275 million
Docket: CP16-486 Status: Project has received a favorable
Environmental AssessmentStart: 4Q 2017Completion: 4Q 2018
Project: Valley Lateral ProjectType: Project includes installation of a
pipeline lateralLength: 7.8 milesDiameter: 16 inchesLocation: Orange County, NYCapacity: 130 MDth/dCost: $39 millionStatus: Federal energy regulators overruled
a New York decision to deny a water quality certifi cation for the project
MONTANA-DAKOTA UTILITIES – (11/17)Project: Doosan Bobcat PipelineType: Project includes pipeline constructionLength: 21 milesDiameter: 12 inchesLocation: Milnor, ND – Gwinner, NDCost: $13.8 millionStart: 3Q 2018Completion: 2Q 2019Comments: Project will deliver natural gas to the
Bobcat plant and other customers in southeastern North Dakota
MOUNTAINEER GAS CO. – (9/17)Operator: Mountaineer Gas Co.Project: Mountaineer Gas Pipeline Phase I
Type: Project includes pipeline constructionLength: 27.5 milesDiameter: 10 inchesLocation: Berkley, VA - Martinsburg, WVCost: $45 millionDocket: 15-1256-G-390PCompletion: 2Q 2019
Project: Mountaineer Gas Pipeline Phase IISegment: Charlestown LoopLength: 24.5 milesStatus: Project is awaiting WV PSC approval
Project: Mountaineer Gas Pipeline Phase IIILength: 4.4 milesStatus: Project is awaiting WV PSC approval
NAMERICO ENERGY HOLDINGS LLC – (5/17)Operator: Pecos Trail Pipeline Co.Project: Pecos Trail PipelineType: Project includes construction of pipelineLength: 468 milesDiameter: 42 inchesLocation: West Texas – Corpus Christi, TXCapacity: 1.85 Bcf/dStatus: Project is seeking suffi cient shipper
commitmentsCompletion: 4Q 2019
NATIONAL FUEL GAS SUPPLY CORP. – (REV 6/17)Project: Northern Access 2016 ProjectType: Project includes construction of pipeline,
installation of additional compression,
PLANNEDProjects in development
14 Pipeline News November 2017 • www.pipeline-news.com
and a new compressor station and gas dehydration facility
Length: 97 milesDiameter: 24 inchesLocation: McKean County, PA - Erie County, NYCapacity: 300 MDth/dCost: $455 millionDocket: CP15-115Status: New York DEC denied the project’s permit,
so the project is on hold
Project: Line QP Project Type: Project includes construction of pipeline
and a regulator stationLength: 5 milesDiameter: 4 inchesLocation: Warren County, PA Docket: CP16-28Status: Project has received a favorable
Environmental AssessmentComments: Project includes the abandonment of the
Line Q Project and Queen Storage assets
NEW JERSEY NATURAL GAS – (REV 8/17)Project: Southern Reliability LinkType: Project includes construction of a pipeline
and compressor stationLength: 30 milesDiameter: 30 inchesLocation: Ocean, Burlington and Monmouth
counties, NJCost: $130 millionStatus: Project is awaiting approval from the New
Jersey Pinelands Commission
NEXTDECADE LLC – (REV 6/17)Operator: Rio Bravo Pipeline LLCProject: Rio Bravo PipelineType: Project includes construction of two
parallel pipelines and three compressor stations
Length: 137 milesDiameter: 42 inchesLocation: Brownsville, TX - Kingsville, TXCapacity: 4.5 Bcf/dDocket: CP16-455Status: Project is awaiting an Environmental
AssessmentStart: 2Q 2018Completion: 1Q 2022Comments: Pipeline is part of the Rio Grande LNG
Project
NEXTERA ENERGY INC. – (10/17) Operator: Florida Southeast Connection LLCProject: Okeechobee Lateral ProjectType: Project includes construction of a pipeline
lateral, receiver and launcher and other associated facilities
Length: 5.2 milesDiameter: 24 inches Location: Okeechobee County, FLCost: $30 millionDocket: CP17-463Status: FSC has engaged in discussions with
property owners along the pipeline route regarding the acquisition of an easement across the portion of their properties needed for pipeline construction and operations
Start: 3Q 2018Completion:1Q 2019Comments: Project will transport natural gas from the
main, 126-mile FSC pipeline in central Florida to a new Florida Power & Light Co. power plant currently under construction
NORTHWEST PIPELINE – (REV 11/17)Project: Pacifi c Connector ProjectType: Project includes construction of
pipelineLength: 232 milesDiameter: 16 inchesLocation: Malin, OR – Coos Bay, ORCapacity: 1.2 MMDth/dCost: $10 billionDocket: PF17-4Status: Project is requesting that FERC issue a
Draft Environmental Impact Statement in 2018, leading to FERC decisions by the end of 2018
Completion: 2024Comments: Project will connect to the proposed
Jordan Cove LNG Terminal
PAIUTE PIPELINE CO. – (10/17) Project: 2018 Expansion Project Type: Project includes pipeline replacement and
pipeline loopingLength: 8.4 milesDiameter: 12 and 20 inchesLocation: Douglas and Lyon counties, NECapacity: 4.6 MDth/d Cost: $17.9 millionDocket: CP17-471Status: Project is awaiting an Environmental
AssessmentComments: Project is an expansion of the existing
Carson and South Tahoe laterals
NYSEG – (REV 6/17)Project: DeRuyter Pipeline ReplacementType: Project includes take up and relay of
existing pipelineLength: 25 milesDiameter: 10 inchesLocation: Norwich, NY - Oneonta, NYStart: 2019Completion: 2020
PENNEAST PIPELINE CO. LLC – (REV 11/17)Project: PennEast PipelineType: Project includes construction of an
underground pipelineLength: 120 milesDiameter: 36 inchesLocation: Luzerne County, PA – Mercer, NJCapacity: 1 Bcf/dCost: $1 billionDocket: CP15-558Status: Project has applied for water crossing
permits with the U.S. Army Corps of Engineers
Start: 2Q 2018
PUBLIC SERVICE ELECTRIC AND GAS CO. –(9/17)Project: Gas System Modernization Program Phase
IIType: Project includes replacement of aging
cast-iron and unprotected steel gas pipesLength: 1,250 milesLocation: New JerseyCost: $2.7 billionStatus: Project is preparing to fi le with the New
Jersey BPU
Completion: 4Q 2022Comments: The upgrades will take place across
PSE&G’s service territory in 11 counties, concentrating on urban areas established in the early 1900s, where much of the utility’s cast-iron and unprotected steel gas pipes are located
SABAL TRAIL TRANSMISSION LLC –(REV 11/17)Owner 1: Spectra Energy Partners LP Owner 2: NextEra Energy Inc.Owner 3: Duke Energy Corp.Project: Southeast Market Pipelines ProjectSegment: Sabal Trail Pipeline Project (Phases II
and III)Type: Project includes installation of new
compressor stations and expansion of existing compressor stations
Location: Florida and AlabamaCapacity: 800 MMcf/d (additional)Docket: CP15-17Status: Phase I is in service and FERC has
prepared a Draft Supplemental Environmental Impact Statement for the remaining two phases
Comments: The existing Sabal Trail Pipeline (1 Bcf/d capacity) extends 515 miles from the Transcontinental Gas Pipeline in Alabama to the central Florida hub near Orlando, where it meets with the Florida Gas Transmission system and the Gulfstream Natural Gas System. The Southeast Market Pipelines Project includes Transcontinental Gas Pipe Line Co. LLC’s Hillabee Expansion Project and NextEra’s Florida Southeast Connection
Completion: 4Q 2021
SEMCO ENERGY GAS CO. – (11/17)Project: Marquette Connector Pipeline ProjectType: Project includes construction of
pipelineLength: 42 milesDiameter: 10 and 20 inchesLocation: Arnold, MI - Negaunee Township, MICapacity: 144 MMcf/dCost: $135 millionStatus: Michigan regulators have approved the
project and construction is on hold until all necessary easements and permits have been acquired
Start: 2020
SEMPRA ENERGY – (REV 10/17)Operator: Southern California Gas Co.Project: Pipeline Safety & Reliability Project - Line
3602Type: Project includes partial replacement of
Line 1600, which entered service in 1949Length: 43 milesDiameter: 36 inchesLocation: San Diego, CACost: $600 millionStatus: Project is in the planning stages
Operator: Port Arthur LNG Pipeline LLCProject: Port Arthur Pipeline - Texas ConnectorType: Project includes construction of pipelineLength: 34 milesDiameter: 42 inchesLocation: Jeff erson and Orange counties, TX;
Cameron Parish, LA
www.pipeline-news.com • November 2017 • Pipeline News 15
PLANNEDProjects in development
Comments: Project will provide a more reliable connection between the Hampton Roads region’s two main gas supply lines
SOUTHERN STAR CENTRAL CORP. – (11/17)Owner 2: NextEra US Gas Assets LLCProject: Sooner Trails Pipeline ProjectType: Project includes construction of
pipelineLength: 250 milesDiameter: 36 inchesLocation: Bryan County, OK - Lamar County, TXCapacity: 1.2 MMDth/dDocket: PF15-30Status: Project has withdrawn its pre-fi ling
application
SPECTRA ENERGY – (8/17)Owner 2: ConocoPhillipsProject: TEMAX ProjectType: Project includes construction of pipeline,
looping and replacement of compressor stations
Length: 33 milesDiameter: 24 inchesLocation: Clarington, OH - Delta, PACapacity: 395 MMcf/dCost: $500 millionStatus: Project is preparing to pre-fi le with FERCComments: Project is an expansion of the Texas
Eastern Transmission Pipeline System
Owner 2: Eversource EnergyOwner 3: National GridOperator: Algonquin Gas Transmission LLC
Capacity: 2 Bcf/dDocket: CP17-21Contact: JD Morris Director, Permitting & Compliance jmorris@SempraGlobal.com (718) 298-5479Status: Sempra LNG & Midstream LLC and
Woodside Energy Inc. have signed a memorandum of understanding (MOU) with Korea Gas Corp. regarding key aspects of the Port Arthur LNG Project, including engineering and construction works, operations and maintenance activities, feed gas sourcing, off take of LNG and KOGAS as a potential purchaser of LNG from, and equity participant in, the project
Start: 3Q 2021Completion: 3Q 2022Comments: Pipeline is part of the Port Arthur
Liquefaction Project
SOUTHERN CO. – (9/17)Operator: Virginia Natural GasProject: Southside Connector Distribution ProjectLength: 9 milesDiameter: 24 inchesLocation: Norfolk, VA - Chesapeake, VAStart: 4Q 2017Completion: 3Q 2018Contact: Les Flora Project Manager (757) 616-7543 x2lfl ora@southernco.com
Project: Access Northeast ProjectType: Project includes replacement of existing
pipeline, looping extensions, installation of new pipeline, compressor station modifi cations and construction of pig launcher and receiver facilities
Length: 96 milesDiameter: 6 to 12 inchesLocation: New York; Connecticut; MassachusettsCapacity: 925 MDth/d Docket: PF16-1Status: Project has been delayed indefi nitely
Operator: Algonquin Gas Transmission LLCProject: Access Northeast ProjectSegment: West Boylston LateralType: Project includes construction of a pipeline
lateralLength: 27 milesDiameter: 16 inchesLocation: Milford, Upton, Grafton, Sutton,
Shrewsbury, Boylston and West Boylston, MA
Operator: Texas Eastern TransmissionProject: Stratton Ridge ProjectType: Project includes modifi cations of three
mainline compressor stations and the installation of two new compressor stations
Location: Brazoria County, TXCapacity: 322 MDth/dCost: $94 millionDocket: CP17-57
Our name says it all.
16 Pipeline News November 2017 • www.pipeline-news.com
PLANNEDProjects in development
Status: Project is awaiting an Environmental Assessment
Completion: 2Q 2019
Project: Greater Philadelphia Expansion ProjectType: Project includes replacement of existing
pipeline with a larger diameter pipe and adding new pipeline looping
Length: 35 milesLocation: Philadelphia, PACapacity: 475 MDth/dStatus: Project is in the evaluation stageCompletion: 2019
Operator: Valley Crossing Pipeline LLCProject: Border Crossing ProjectType: Project includes pipeline construction Length: .2 milesDiameter: 42 inchesLocation: Texas state waters east of Brownsville, TXCapacity: 2.6 Bcf/dDocket: CP17-19Status: Project has received an Environmental
AssessmentComments: Project will connect the Valley Crossing
System with the Mexican Marina Pipeline
Project: Renaissance Gas Transmission ProjectType: Project includes construction of pipelineLength: 230 milesDiameter: 24, 30 and 36 inchesLocation: Mount Pleasant, TN - Lawrenceville, GACapacity: 1.25 Bcf/dStatus: Project is on hold
SPIRE – (REV 8/17)Project: Spire STL PipelineType: Project includes installation of steel
pipeline and minor modifi cations to line 880
Length: 70 milesDiameter: 24 inchesLocation: St. Louis, MOCapacity: 400 MDth/dDocket: CP17-40Status: Project is awaiting a FERC fi nal order
Contractor: T.G. Mercer Consulting Services Inc.Type: Project includes offl oading of pipeLength: 43 milesDiameter: 24 inchesLocation: Polk County, MNContact: Michael Magee Superintendent
SPRING RIDGE CONSTRUCTORS LLC – (3/17)Contractor: Rockford Corp.Type: Project includes construction of pipelineLength: 177 milesDiameter: 20, 36 and 42 inchesLocation: Virginia and North CarolinaCost: $680 millionStart: 2018Completion:2020
STEEL REEF INFRASTRUCTURE CORP. –(11/17)Project: South Saskatchewan Access PipelineType: Project includes pipeline constructionLength: 5 milesDiameter: 11 inchesLocation: Portal, ND – North Portal, SKCapacity: 900 cm/d
Start: 4Q 2018Status: Project is undergoing public meetingsComments: As the pipeline crosses an international
border, it requires approval from both the Canadian and U.S. governments
SUMMIT MIDSTREAM PARTNERS LP – (8/17)Operator: XTO Energy Inc.Project: Summit Midstream Gathering SystemType: Project includes gathering and processing
system constructionLength: 161 milesDiameter: 48 inchesLocation: Eddy and Lea counties, NMCapacity: 60 MMcf/dCost: $110 millionStatus: Project is seeking shipper commitmentsCompletion: 3Q 2018
TALEN ENERGY CORP. – (10/17)Project: Montour LateralType: Project includes construction of a pipeline
lateralLength: 15 milesDiameter: 30 inchesLocation: Montour County, PACost: $70 millionStatus: Project is in the early stagesStart: 2Q 2018Comments: Project will supply natural gas to the
Montour Plant
TALLGRASS ENERGY – (REV 4/17)Owner 2: AGL Resources Inc.Project: Prairie State PipelineType: Project includes construction of pipelineLength: 140 milesLocation: Douglas County, IL - Chicago Market
CentreCapacity: 1.2 Bcf/dCost: $1 billionStatus: Project is in the planning stage
TELLURIAN INC. – (REV 8/17)Operator: Downeast Pipeline LLCProject: Downeast PipelineType: Project includes construction of pipelineLength: 30 milesDiameter: 30 inches Location: Robbinston, MECapacity: 300 MMcf/d Docket: CP07-52Status: Project has currently been deniedComments: Pipeline is part of the proposed Downeast
LNG Project
TEXAS EASTERN TRANSMISSION LP – (10/17)Project: Idle Line 1 Abandonment ProjectType: Project includes abandonment and
removal of existing pipeline, metering and regulating facilities, and other related aboveground facilities
Length: 165 milesDiameter: 24 inchesLocation: Fayette County, OH - Greene County, PADocket: CP17-6Status: Project has received a favorable
Environmental Assessment
TRANSCANADA CORP. – (REV 9/17)Operator: Columbia Pipeline Group Inc. Project: Eastern Panhandle ExpansionType: Project includes pipeline construction
Length: 4 milesDiameter: 8 inchesLocation: Martinsburg, WVCapacity: 47 MDth/dDocket: CP17-80Status: Project is undergoing an Environmental
AssessmentStart: 2Q 2018Comments: Project will provide fi rm transportation
service to markets in West Virginia through Mountaineer Gas Co.’s gathering system
Project: Continent to Coast Expansion ProjectType: Project includes meter station upgradesLocation: Westbrook, MNCapacity: 300 MMcf/dContact: Cynthia L. Armstrong Director of Marketing and Business
Development (603) 559-5527 cynthia_armstrong@transcanada.comDocket: CP96-248Status: Project is currently in the planning stageComments: Project is an expansion of the Portland
Natural Gas Transmission System and will transport gas into the Maritimes & Northeast Pipeline
Operator: Columbia Pipeline GroupProject: Buckeye Xpress ProjectType: Project includes pipeline looping and
additional compressionCapacity: 700 MMcf/dStatus: Project is undergoing an open seasonCompletion: 1Q 2020
Operator: Columbia Pipeline GroupProject: Mountaineer XPress ProjectType: Project includes construction of various
diameter pipeline and loopingLength: 165 milesDiameter: 24, 36 and 42 inchesLocation: Marshall and Cabell counties, WV Capacity: 2.7 Bcf/dCost: $2.7 billionDocket: CP16-357Status: Project has received a favorable
Environmental AssessmentStart: 4Q 2017Completion: 4Q 2018Comments: Project is associated with the Gulf Xpress
Project
Operator: Columbia Pipeline GroupProject: Gulf Xpress Project Type: Project includes construction of three
compressor stations, modifi cations to three existing compressor stations and one regulating station
Location: Marshall and Cabell counties, WV Capacity: 2.7 Bcf/dCost: $2.7 billionDocket: CP16-361Status: Project has received a favorable
Environmental AssessmentStart: 4Q 2017Completion: 4Q 2018Comments: Project is associated with the Mountaineer
XPress Project
Contractor: Welded Construction LP Sub: ProFoam LLC
www.pipeline-news.com • November 2017 • Pipeline News 17
PLANNEDProjects in development
Type: Project includes providing foam breakers on pipeline
Length: 25 milesDiameter: 36 inchesLocation: Marshall County, WV and Greene County,
PAContact: Kevin Smith Superintendent
Operator: Columbia Pipeline GroupProject: WB Xpress ProjectType: Project includes replacement of pipeline
and the construction of two new compressor stations
Length: 30 milesDiameter: 12, 26 and 36 inchesLocation: Randolph and Pendleton counties, WV;
Kanawha County, WV; Fairfax County, VACapacity: 1.3 Bcf/dCost: $850 millionDocket: CP16-38Status: Project received a favorable
Environmental Assessment and awards are currently pending
Start: 4Q 2017Completion:3Q 2018
Operator: Columbia Pipeline GroupProject: Columbia Gas Transmission System
Modernization ProgramSegment: B-System ProjectType: Project includes construction of pipeline,
replacement of existing pipeline and upgrades to equipment and facilities
Length: 20.8 miles
Diameter: 20 inchesLocation: Fairfi eld and Franklin counties, OHDocket: CP16-498Status: Project is awaiting an Environmental
AssessmentStart: 2017Completion: 2018Comments: Project is part of Columbia’s ongoing
Modernization Program to replace aging infrastructure, upgrade natural gas compression systems and increase pipeline reliability
VENTURE GLOBAL LNG – (REV 8/17)Operator: TransCameron Pipeline LLCProject: TransCameron East LateralType: Project includes construction of pipelineLength: 24 milesDiameter: 42 inchesLocation: Grand Chenier, LA and Johnson’s Bayou,
LACapacity: 2 MMDth/dCost: $344.5 millionContact: Fory Musser Senior Vice President, Corporate
Development fmusser@venturegloballng.comDocket: CP15-550Status: Project fi led with FERC and is currently
awaiting approvalCompletion: 1Q 2019
Operator: Venture Global Gator Express LLCProject: Gator Express Pipeline System
Type: Project includes construction of pipeline, looping and appurtenant facilities
Length: 27 milesDiameter: 42 inchesLocation: Plaquemines Parish, LA Capacity: 1.9 MMDth/dCost: $284 millionDocket: CP17-67Status: Project is awaiting an Environmental
Impact Statement
WBI ENERGY INC. – (REV 8/17)Project: Valley Expansion Pipeline ProjectType: Project includes construction of pipeline,
interconnect facilities, an electric compressor station, replacement of two existing town border stations and the construction a regulator station
Length: 38 milesDiameter: 16 milesLocation: Clay County MN; Cass, Burleigh, Stutsman
and Barnes counties, NDCapacity: 40 MMcf/dCost: $60 millionDocket: PF16-10Start: 2018
WILLIAMS TRANSCONTINENTAL – (REV 10/17)Operator: Northwest Pipeline LLCProject: North Seattle Lateral Upgrade ProjectType: Project includes pipeline removal and
replacement and facility upgradesLength: 7 milesDiameter: 8 inches
Call Jim Filipowicz today! (800)334-5964 or (406)761-4848Steel Etc. • 1408 52nd St. N • Great Falls, MT
Flume PipeNew & Used STD & Heavy Wall PipeUsed Railroad Flat Cars & Tank Cars
Get your product where you need it, when you need it!
Material delivered to job sites ON TIME in the Continental US & Canada
Featurin
g:
Coal Slag Blast Abrasive
Grit Sizes8-20 Course • 16-40 Medium
20-40 Med Fine • 30-60 Fine • 40-60 Extra Fine
Environmentally friendly NO heavy metal<.2% Free silica
Consistent, hard angular particlesFast cleaning
Blastox blending® availableCARB & QPL approved
Featurin
g:
PLANNEDProjects in development
18 Pipeline News November 2017 • www.pipeline-news.com
Location: Snohomish County, WADocket: CP17-441Status: Project has fi led with FERCStart: 2Q 2019Completion: 4Q 2019Comments: Project has executed fi rm agreements
with Puget Sound Energy to expand delivery capabilities of the existing lateral, which serves PSE customers
Operator: Northwest Pipeline LLCProject: North Fork Nooksack Line Lowering
ProjectType: Project includes pipeline removal and
replacementLength: .7 milesDiameter: 30 inchesLocation: Whatcom County, WADocket: CP17-133Status: Project is awaiting an Environmental
Assessment
Operator: Steelhead LNG Corp.Project: Island Gas ConnectorType: Project includes construction of pipeline,
meter stations and compressor stationsLength: 80 milesDiameter: 36 inchesLocation: Sumas, WA - Vancouver Island, B.C.Completion: 4 Q2020Status: Project is preparing to start the pre-fi ling
process with FERC
Operator: Transcontinental Gas Pipe Line Co. LLCProject: Rivervale South to Market ProjectType: Project includes pipeline looping,
upgrades and existing facility modifi cations
Length: 11 milesLocation: New JerseyCapacity: 190 MDth/dCost: $127 millionDocket: CP17-490Status: Project submitted an application with
FERC for authorization of the project, and has executed precedent agreements with Direct Energy Business Marketing LLC and UGI Energy Services LLC for fi rm transportation service
Start: 4Q 2018Completion: 4Q 2019Comments: Project will help meet the growing
heating and power generation demand for northeastern consumers, primarily in New Jersey and New York
Operator: Transcontinental Gas Pipe Line Co. LLCProject: St. James Supply LateralType: Project includes construction of pipeline,
compressor stations and a pig receiver siteLength: .7 milesDiameter: 20 inchesLocation: St. James Parish, LACapacity: 161.5 MDth/dDocket: CP17-58Status: Project is awaiting an Environmental
AssessmentCompletion: 2020
Operator: Transcontinental Gas Pipe Line Co. LLCProject: Northeast Supply EnhancementType: Project includes construction of pipelineLength: 35 miles
Diameter: 26 and 42 inchesLocation: New York Bay; Lancaster County, PA;
Middlesex County, NJCapacity: 400 MMcf/dCost: $926.5 millionDocket: CP17-101Status: Project is in the planning stageStart: 2Q 2018Completion: 4Q 2019
Operator: Williams Northwest Pipeline LLCProject: Washington Expansion ProjectType: Project includes construction of pipeline
looping and compression stationsLength: 140 milesDiameter: 36 inchesLocation: Whatcom County, WA - Woodland, WACapacity: 750 MDth/dDocket: CP13-507 Completion: 4Q 2018
XCEL ENERGY – (8/17)Project: Tungsten to Bobtail Pipeline Type: Project includes construction of pipelineLength: 15 milesLocation: Boulder County, CO - Black Hawk, COStatus: Project is in the planning stagesStart: 2Q 2019Completion: 3Q 2020
CanadaCHEVRON CANADA LIMITED – (REV 2/17)Owner 2: Apache CanadaOperator: Pacifi c Trail Pipelines Ltd. PartnershipProject: Pacifi c Trail PipelineType: Project includes construction of pipeline
and a compressor stationLength: 298 milesDiameter: 42 inchesLocation: Prince George - Kitimat, B.C.Capacity: 1 Bcf/dCost: $1 billionFiling: A31037Status: Project is conducting pre-construction
activitiesComments: Project is associated with the proposed
Kitimat LNG Facility
IMPERIAL OIL RESOURCES – (REV 7/17)Owner 2: ConocoPhillips CanadaOwner 3: Shell CanadaOwner 4: ExxonMobil CanadaProject: Mackenzie Gas ProjectType: Project includes construction of a
gathering system and transmission pipeline
Length: 1,056 milesDiameter: 10 and 30 inchesLocation: Mackenzie Valley - Fort Simpson - AlbertaCapacity: 1.2 Bcf/d Cost: $16 billionStatus: NEB is giving the consortium until the end
of 2022 to start building the long-delayed project
SPECTRA ENERGY CORP. – (REV 5/17)Project: Westcoast Connector Gas Transmission
ProjectType: Project includes construction of two
adjacent pipelinesLength: 528 miles
Diameter: 42 and 48 inchesLocation: Cypress, B.C. - Prince Rupert, B.C.Capacity: 4.2 Bcf/dCost: $7.5 billionStatus: Project is on hold
Contractor: FLUORType: Project includes engineering,
procurement and construction of the pipeline
TRANSCANADA CORP. (REV 11/17)Project: Eastern Mainline ProjectType: Project includes construction of four
sections of new natural gas transmission pipeline and the installation of nine new 11MW compressor units at fi ve existing compressor stations
Location: City of Markham - Township of Edwardsburgh/Cardinal
Length: 173 milesDiameter: 36 inchesCapacity: 80 MMcf/dCost: $160 millionFiling: A69340Status: Project has been canceled due to
regulatory hurdles in Canada and stiff opposition from environmental groups
Start: 2018Completion: 2020Comments: Project will increase capacity of the
existing Canadian Mainline System. Project will provide businesses, homes, schools and hospitals in Ontario and Quebec with access to a safe and diverse source of natural gas
Operator: NOVA Gas Transmission Ltd.Project: Sundre Crossover ProjectType: Project includes pipeline constructionLength: 13 milesDiameter: 42 inchesLocation: Sundre, ABDocket: A82246Status: Project has fi led with the NEB and is
awaiting approvalComments: Proposed pipeline right-of-way (RoW)
will be alongside and contiguous to an existing Enbridge pipeline RoW and other linear disturbances for approximately 96 percent of its length
Operator: NOVA Gas Transmission Ltd.Project: Peace River Mainline AbandonmentType: Project includes abandonment of a loop
on the existing mainline and the removal of associated above ground facilities
Length: 165 milesLocation: Northwest AlbertaContact: Marie McKenney Process Advisor marie.mckenney@neb-one.gc.caFiling: A82534Status: The NEB will hold a public hearing to
consider an application for the projectCompletion: 2Q 2018
Operator: NOVA Gas Transmission Ltd.Project: Merrick Mainline ProjectType: Project includes construction of pipeline,
a meter station, mainline valve sites, launcher and receiver facilities, cathodic protection facilities and miscellaneous work
www.pipeline-news.com • November 2017 • Pipeline News 19
PLANNEDProjects in development
Length: 161 milesDiameter: 48 inchesLocation: Summit Lake, BC – Peace River, BCCapacity: 2 Bcf/dCost: $1.9 billionFiling: A60778Status: Project has applied with the NEB and is
currently on hold
Operator: NOVA Gas Transmission Ltd.Project: 2019 NGTL ExpansionType: Project includes construction of pipeline,
compression enhancements at fi ve compressor stations, new meter stations and other associated facilities
Length: 171 milesDiameter: 48 inchesLocation: Alberta and British ColumbiaCapacity: 3 Bcf/dCost: $2 billion Status: Applications will be fi led with the NEB in
4Q 2017Start: 1Q 2019Completion: 2Q 2021Comments: Project is in addition to the current $5.1
billion near-term capital program for the NGTL System
Operator: NOVA Gas Transmission Ltd.Project: 2018 NGTL ExpansionType: Project includes construction of pipeline,
one new compressor, new and expanded meter stations, and other associated facilities
Length: 55 miles
Diameter: 20 to 48 inchesLocation: Alberta and British ColumbiaCapacity: 2.7 Bcf/dCost: $570 million
Project: North Montney ProjectType: Project includes construction of pipeline,
associated metering facilities, valve sites and compression facilities
Length: 190 milesDiameter: 42 inchesLocation: Peace River, ABCapacity: 2.4 Bcf/dCost: $1.7 billionFiling: A69520Status: Project has received NEB approval and an
Environmental Certifi cateCompletion: 2Q 2019
Operator: Prince Rupert Gas Transmission Ltd.Project: Prince Rupert Gas Transmission PipelineType: Project includes construction of pipelineLength: 560 milesDiameter: 36 and 48 inchesLocation: Hudson’s Hope, B.C. - Lelu IslandCapacity: 2 Bcf/dCost: $5 billionStatus: Project has received regulatory
approval and is currently awaiting a fi nal investment decision
Operator: Coastal GasLink Pipeline Ltd.Project: Coastal GasLink PipelineType: Project includes construction of pipeline
and compressor stations
Length: 416 milesDiameter: 48 inchesLocation: Dawson Creek - Kitimat, B.C.Capacity: 2.1 Bcf/dCost: $4.8 billionStatus: Project has received regulatory approval
and is currently considering an alternate route
SPECTRA ENERGY – (REV 7/17)Operator: Westcoast Energy Inc. Project: Wyndwood Pipeline Expansion ProjectType: Project includes construction of pipeline
looping and associated facilitiesLength: 17 milesDiameter: 36 inchesLocation: Chetwynd, B.C.Capacity: 50 MMcf/dCost: $170 millionFiling: A80172 Status: Project is awaiting NEB approval
MexicoENGIE – (8/17)Project: Energia Mayakan Pipeline ExtensionType: Project includes construction of pipelineLength: 99 milesDiameter: 16 to 24 inchesLocation: Valladolid, Yucatan - Quintana RooCost: $300 million Status: Project is in the planning stageCompletion: 1Q 2020
Precision Welding & Fabrication
• ASME Pressure Vessels• Pipe Fabrication• Stainless And Alloy Fabrication• Structural Steel Fabrication• Cross- Overs, Platforms And
Caged Ladders• Hydro-Testing• Field Measuring• Plate Rolling
Stainless And Alloy Fabrication
Buy Direct from the Fabricator and save on your Pipe Clamps and Supports.
Send your quotes to John@weweld.com or call today at 281-252-0151Visit us at www.weweld.com
Precision Welding & Fabrication10002 Sweetwater Lane, Houston, TX 77037Phone: 281.252.0151 Toll Free: 877.252.0152 Fax: 281.252.8151 john@weweld.com www.weweld.com
20 Pipeline News November 2017 • www.pipeline-news.com
PLANNEDProjects in development
Caribbean/South & Central AmericaROYAL DUTCH SHELL – (5/17)Project: Dragon – Hibiscus PipelineType: Project includes construction of pipelineLength: 11 milesLocation: Venezuela (Dragon – Hibiscus)Capacity: 300 MMcf/dCost: $100 millionStatus: Project is in the development stage
NGL - The AmericasU.S. ENERGY TRANSFER PARTNERS LP – (4/17)Project: Fractionator VType: Project includes construction of a fifth
natural gas liquids fractionation facility and associated product infrastructure
Location: Mont Belvieu, TXCapacity: 120 MbpdCompletion: 2018
ENTERPRISE PRODUCTS PARTNERS LP —(6/17)Project: Lou-Tex NGL Pipeline ConversionType: Pipeline conversionLength: 263 milesLocation: Sorrento, LA - Mont Belvieu, TX Completion: 1Q 2020Comments: Pipeline will be converted from CPG to
PGP service
PERMICO ENERGIA LLC – (10/17) Project: Permico’s Texas NGL ProjectSegment: Companero PipelineType: Project includes bi-directional pipeline
constructionLength: 510 milesDiameter: 24 inchesLocation: Monahans, TX – Corpus Christi, TXCapacity: 300 MbpdStatus: Project funding has been secured through
long-term commitments from Korean pension fund institutions
Start: 2Q 2018Completion: 4Q 2020Comments: Project will include the Markham Storage
Facility and El Centro Fractionator
Segment: Mont Belvieu PipelineType: Project includes bi-directional pipeline
constructionLength: 230 milesDiameter: 20 inchesLocation: El Centro Fractionator - Mont BelvieuCapacity: 250 Mbpd
Segment: Markham PipelineType: Project includes bi-directional pipeline
constructionLength: 116 milesDiameter: 16 inchesLocation: El Centro Fractionator - Markham StorageCapacity: 175 Mbpd
TARGA RESOURCES CORP. – (7/17)Project: Grand Prix PipelineType: Project includes construction of pipelineLocation: West Texas - Mont Belvieu, TXCapacity: 550 Mbpd
Cost: $1.3 billionStatus: Project is in the planning stageCompletion: 2Q 2019
WILLIAMS PARTNERS LP – (6/17)Project: Promesa PipelineType: Project includes construction of pipeline
and utilization of existing pipelineLength: 3 milesDiameter: 4 to 10 inchesLocation: Mont Belvieu, TX - Houston Ship ChannelStatus: Project is in the planning stage
LNG - The AmericasU.S. DOWNEAST LNG INC. – (2/17)Project: Downeast LNG ProjectType: Project includes construction of a long
pier, two full-containment LNG storage tanks, LNG vaporization and processing equipment and other support facilities
Location: Robbinston, MECapacity: 3 MMtpaCost: $1.3 billionDocket: CP07-53Status: Project has currently been denied
FERUS NATURAL GAS FUELS LP – (REV 4/17)Operator: Eagle LNG PartnersProject: Jacksonville LNG ProjectType: Project includes construction of three
liquefaction trainsLocation: Jacksonville, FLCapacity: 1 MMtpaCost: $100 millionDocket: CP17-41Status: Project has submitted a formal application
with FERC
FREEPORT LNG DEVELOPMENT LP – (9/17)Operator: FLNG Liquefaction 4 LLCProject: Freeport LNG Quintana Regas Terminal
ExpansionSegment: Train 4 ProjectType: Project includes construction of a fourth
liquefication trainLocation: Quintana Island, TXCapacity: 5 MtpaDocket: CP17-47Status: Project is awaiting approvalCompletion: 2019Comments: Train 4 will use electric motors with
variable frequency drive for the cooling and liquefac-tion compression power, resulting in negligible incremental emissions. Train 4 will be constructed adjacent to the first three trains on Quintana Island
KINDER MORGAN INC. – (6/17)Operator: Gulf LNG Liquefaction Co. LLCProject: Gulf LNG Liquefaction ProjectType: Project includes installation of natural gas
pre-treatment, liquefaction, and export facilities at the existing Gulf LNG Terminal
Location: Jackson County, MSCapacity: 11.5 MMtpaCost: $5 billionDocket: CP15-521
Status: Project is awaiting an Environmental Impact Statement
Completion: 2020
Contractor: KBRType: Project includes a front-end engineering
and design report for FERC pre-filing services
NEXTDECADE LLC – (REV 6/17)Operator: Rio Grande LNG LLCProject: Rio Grande LNG ProjectType: Project includes construction of six
liquefaction trains, pre-treatment facilities, four full-containment LNG storage tanks and truck loading facilities
Location: Brownsville, TXCapacity: 27 MMtpaCost: $20 billionDocket: CP16-454Status: Project is awaiting an Environmental
AssessmentStart: 2Q 2018Completion: 1Q 2022
Contractor: GE Oil & GasType: Project includes supply of gas turbine and
compressor equipment
SEMPRA LNG & MIDSTREAM – (7/17)Operator: Port Arthur LNG LLCProject: Port Arthur Liquefaction ProjectType: Project includes construction of two
liquefaction trains, LNG storage tanks, marine facilities, NGLs and refrigerant storage, feed gas pre-treatment and combustion turbine generators
Location: Jefferson County, TXCapacity: 13.5 MMtpaDocket: CP17-20Contact: JD Morris Director, Permitting & Compliance jmorris@SempraGlobal.com (718) 298-5479Status: Project is awaiting FERC reviewStart: 3Q 2021Completion: 3Q 2022
TELLURIAN INC. – (REV 8/17)Operator: Driftwood LNG LLCProject: Driftwood LNG ProjectType: Project includes construction of five LNG
plants, three LNG storage tanks, marine facilities and associated infrastructure and support facilities
Location: Calcasieu Parish, LACapacity: 26 MMtpaCost: $14 billionDocket: CP17-117Status: Project has submitted a formal application
with FERCStart: 2018Completion: 2022
OIL - The AmericasU.S. BLUEKNIGHT ENERGY PARTNERS LP – (REV 11/16)Operator: Knight Warrior LLCProject: Knight Warrior PipelineType: Project includes construction of pipeline
www.pipeline-news.com • November 2017 • Pipeline News 21
PLANNEDProjects in development
Length: 160 milesDiameter: 16 inchesLocation: Madison, Walker, Grimes, Montgomery
and Harris counties, TXCapacity: 100 MbpdCost: $300 millionStatus: Project is delayed
Contractor: Hatch Mott MacDonald LLCType: Project includes engineering and design
for the project
Contractor: Contract Land Staff LLCType: Project includes land management for the
project
Contractor: Apex TITAN Inc. Type: Project includes environmental services
for the project
BUCKEYE PARTNERS LP – (5/17)Project: South Texas Gateway PipelineType: Project includes construction of a
distribution system and a long-haul pipeline
Diameter: 24 inchesLocation: Wink, TX – Corpus Christi, TXCapacity: 400 MbpdCompletion: 2019Status: Project is undergoing an open seasonContact: Kevin J. Goodwin Vice President & Treasurer irelations@buckeye.com (800) 422-2825
Comments: Pipeline is part of a series of potential investment projects Buckeye is pursuing in order to significantly enhance Permian Basin crude oil flows, including the construction of a crude oil distribution system in Corpus Christi to provide local refineries with access to new sources of supply and an expansion of its existing storage and marine terminalling assets along the Corpus Christi Ship Channel
ENBRIDGE INC. – (7/17)Project: Line 5 Pipeline Replacement Type: Project includes replacement of pipeline
via HDDLength: .6 milesDiameter: 30 inchesLocation: Little Rock, ARStatus: The Michigan Pipeline Safety Advisory
Board is expected to release two studies on risks from the aging pipeline built in 1953
Operator: Enbridge Pipelines LLCProject: Enbridge Ozark Pipeline ExpansionType: Project includes increasing horsepower at
pump stations and adding drag reducing agents to the crude petroleum
Location: Cushing, OK - Wood River, ILStatus: Project is seeking shipper commitmentsCompletion: 2Q 2018
ELK PETROLEUM INC. – (5/17)Operator: Grieve Pipeline LLCProject: Grieve Pipeline
Type: Project includes construction of pipelineLength: 32 milesDiameter: 8 inchesLocation: Mountain View, WYCapacity: 12 MbpdContact: Scott Hornafius CEO, Elk Petroleum Inc. 720-744-4884 scott.hornafius@elkpet.comStatus: Project is undergoing an open seasonCompletion: 1Q 2018
ENBRIDGE PIPELINES INC. – (REV 10/17)Project: Line 67 ExpansionType: Project includes installation of new pump
stations and associated station piping, including valves and appurtenances at four existing facilities
Location: Donaldson, Plummer, Cass Lake, and Floodwood, MN
Capacity: 120 MbpdCost: $199.2 millionDocket: PL-9/CN-12-590Status: Project has received a final EISComments: Project will add compression to a segment
of the existing Alberta Clipper Pipeline
ENERGY TRANSFER PARTNERS LP – (REV 9/17)Operator: Permian Express Terminal LLCProject: Permian Express 3Type: Project includes construction of a
gathering systemLocation: Nederland, TXCapacity: 100 Mbpd
22 Pipeline News November 2017 • www.pipeline-news.com
PLANNEDProjects in development
Contact: Chris Martin Senior Director, Business Development (281) 637-6548 chris.martin@energytransfer.comStatus: Project is undergoing an open
season Completion: 4Q 2017
Contractor: American Electric Technologies Inc. (M&I Electric)
Type: Project includes M&I’s turnkey power delivery solutions, conventional switchgear, motor control centers and installation of frequency drives
Cost: $4 million
HILCORP ALASKA – (11/17)Project: Cook Inlet Pipe Line System ExpansionType: Project includes construction of
onshore and off shore pipelines and conversion of a cross-inlet pipeline from natural gas to oil
Location: Cook Inlet, AKCost: $75 millionStatus: Project has requested permission from
the Regulatory Commission of AlaskaComments: The undersea oil pipeline will allow for
the shutdown and decommissioning of the Drift River Terminal
MAGELLAN MIDSTREAM PARTNERS LP –(7/17)Owner 2: Plains All American Pipeline LPOperator: BridgeTex Pipeline Co. LLCProject: BridgeTex Pipeline ExpansionType: Project includes expansion of the
BridgeTex Pipeline via enhancements of existing pumps and related equipment
Diameter: 20 inches Location: Bryan, TXCapacity: 100 MbpdDocket: OR16-19
MINNESOTA PIPE LINE CO. LLC – (REV 1/17)Operator: Koch Pipeline Co.Project: Minnesota Pipe Line Reliability ProjectType: Project includes adding six pump stations
to MPL Line 4 and upgrading existing stations
Location: Howard County, TX - Glasscock County, TX
Capacity: 185 MbpdDocket: PL5/CN-14-320Cost: $125 million
ONEOK BAKKEN PIPELINE LLC – (REV 3/17)Project: Bakken Expansion II Loop ProjectType: Project includes construction of pipelineLength: 58 milesDiameter: 16 inchesLocation: Alexander, ND and Ft. Laramie, FLCapacity: 160 MbpdStatus: Project has been delayed
PHILLIPS 66 – (5/17)Project: Reeves-Odessa Origination (Rodeo)
ProjectType: Project includes construction of pipeline
and associated lateralsLength: 130 milesLocation: Reeves, TX – Odessa, TXCapacity: 130 Mbpd
Contact: Scott Hutson Director, Business Development Scott.M.Hutson@p66.com.Status: Project is undergoing an open seasonCompletion: 2Q 2018
PILGRIM PIPELINE HOLDINGS LLC – (REV 3/17)Project: Pilgrim PipelineType: Project includes construction of parallel
pipelinesLength: 356 milesDiameter: 24 inchesLocation: Port of Albany, NY – Linden, NJCapacity: 400 MbpdCost: $900 millionStatus: Project is fi nalizing the route
PLAINS ALL AMERICAN PIPELINE LP – (9/17)Project: Sunrise Pipeline System ExpansionType: Project includes construction of pipeline
and utilization of existing pipelineLength: 180 milesDiameter: 24 inchesLocation: Colorado City, TX – Wichita Falls, TXCapacity: 120 MbpdStatus: Project is in the planning phaseStart: 4Q 2018Completion: 2Q 2019Comments: Project includes capacity expansions to
the existing Delaware Basin system of up to 200 Mbpd
Project: Permian Basin to Cushing PipelineType: Project includes construction of pipeline
and utilization of existing pipelineLocation: Midland, TX - Cushing, OKCapcity: 350 MbpdStatus: Project is undergoing an open seasonCompletion: 2Q 2019
SHELL PIPELINE COMPANY LP (REV 2/17)Operator: Zydeco Pipeline Co. LLCOwner 2: Shell Midstream Partners LPProject: Houma - St. James PipelineType: Project includes construction and
replacement of large diameter pipelineLength: 40 milesDiameter: 24 inchesLocation: Houma - St. JamesStart: 2Q 2018Status: Project is in the planning stagesComments: Project will replace a segment of the
existing Zydeco Houma – St. James line
TALLGRASS ENERGY – (11/17)Project: Cheyenne Connector PipelineType: Project includes pipeline constructionLength: 70 milesLocation: Weld County, COCapacity: 600 Dth/d (initial) 1.3 MMDth/d (maximum)Status: Project is undergoing an open seasonCompletion: 3Q 2019Comments: Once completed, Tallgrass Energy
Partners will own and operate the pipeline, with Western Gas and DCP Midstream having the option to invest in it at a later date
Operator: Tallgrass Pony Express Pipeline LLCProject: Platteville Extension
Type: Project includes construction of facilities to connect Holly Frontier’s refi nery complex
Location: Platteville, COCapacity: 100 MbpdStatus: Project is undergoing a second open
seasonCompletion: 2Q 2018
Project: Tallgrass Grasslands TerminalType: Project includes construction of a terminalLocation: Platteville, COStatus: Project is awaiting the conclusion of the
Platteville Extension’s recently announced open season
Completion: 2Q 2018Comments: Project will serve as a new pipeline origin
for the Pony Express Platteville Extension
TEXSTAR MIDSTREAM LOGISTICS – (5/17)Project: Karnes PipelineType: Project includes pipeline constructionLength: 15 milesDiameter: 10 and 12 inchesLocation: Karnes, TXComments: Associated with EPIC Pipeline
TRANSCANADA CORP. – (REV 8/17)Operator: Upland Pipeline LLCProject: Upland Pipeline ProjectType: Project includes construction of pipeline
and related facilities, including valve sites, tanks and new pump stations
Length: 240 milesDiameter: 20 inchesLocation: Williston, ND - Manitoba-Saskatchewan
borderCapacity: 300 MbpdCost: $600 millionDocket: 2015-18866Status: Company has requested the U.S. State
Department to pause review of the project
CanadaENBRIDGE PIPELINES INC. – (7/17)Project: Line 21 Pipeline (Norman Wells Pipeline)Type: Project includes installation and
decommissioning of pipelineLength: 1.5 milesDiameter: 12 inchesLocation: Fort Simpson, Northwest TerritoriesFiling: A85153Status: Project is awaiting NEB approval
Project: Northern Gateway PipelineType: Project includes construction of two
pipelines and a marine terminalLength: 731 milesDiameter: 20 and 36 inchesLocation: Bruderheim, AB - Kitimat, B.C.Capacity: 718 MbpdCost: $6.5 billionDocket: A43714Status: The Federal Government has directed the
NEB to dismiss the project’s application
TRANSCANADA CORP. – (REV 11/17)Project: Energy East PipelineType: Project includes pipeline conversion
and construction Length: 870 milesDiameter: 42 inches
www.pipeline-news.com • November 2017 • Pipeline News 23
PLANNEDProjects in development
Location: Hardisty, AB - St. John, N.B.Capacity: 1.1 MMbpdCost: $15.7 millionFiling: A84515Status: Project has been canceled due to
regulatory hurdles in Canada and stiff opposition from environmental groups
Start: 2Q 2018Completion: 4Q 2020
Project: Keystone XL ProjectType: Project includes construction of pipelineLength: 1,179 milesDiameter: 36 inchesLocation: Hardisty, AB - Steele City, NECapacity: 830 MbpdCost: $7 billionFiling: A21262Status: Project has launched an open season
PRODUCTS - The AmericasU.S.CENEX PIPELINE LLC – (10/17)Owner: CHS Inc.Project: Cenex Pipeline ReplacementType: Project includes 8-inch pipeline
replacementLength: 182 milesDiameter: 10 inchesLocation: Sidney, MT – Minot, ND
Status: CHS recently fi nished contacting landowners and conducting environmental resource surveys. The next step is to work with tribal leadership, state and federal agencies to complete the approval and permitting process
Start: 4Q 2017Completion: 2Q 2019Comments: The pipeline will follow a new route for
the majority of the 182 miles and will utilize existing easements for the rest of its length
FORMOSA PLASTICS GROUP – (7/17)Contractor: Strike LLCProject: Formosa Expansion ProjectType: Project includes construction of pipelineLength: 186 milesDiameter: 8, 10 and 16 inchesLocation: Point Comfort, TXCapacity: 46 Mbpd
HOWARD ENERGY PARTNERS LP – (REV 6/17)Operator: Dos Águilas Pipeline LLC Project: Dos Aguilas ProjectSegment 1: Laredo Express PipelineSegment 2: Borrego PipelineSegment 3: Poliducto Frontera PipelineSegment 4: Poliducto del Norte PipelineType: Project includes construction of pipelineLength: 287 milesDiameter: 12 inchesLocation: Corpus Christi, TX - Monterrey, Nuevo
Leon
Capacity: 72 MbpdCost: $500 millionStatus: Project is awaiting approvalStart: 4Q 2018
Operator: GT Pipeline LLCProject: Sabine Bayou Line ProjectType: Project includes construction of pipelineLength: 6 milesDiameter: 16 and 20 inchesLocation: Port Arthur, TXCapacity: 308 MbpdStatus: Project is undergoing an open season
KINDER MORGAN INC. – (REV 7/17)Operator: Palmetto Products Pipe Line LLCProject: Palmetto PipelineType: Project includes construction of pipeline,
tanks and pump stationsLength: 360 milesDiameter: 16 and 20 inchesLocation: South Carolina - FloridaCapacity: 167 MbpdCost: $1.1 billionDocket: OR15-13Status: Project is delayed
MAGELLAN MIDSTREAM PARTNERS LP –(10/17)Owner 2: Valero Energy Corp.Project: Magellan South Pipeline ExpansionType: Work scope includes the expansion and
reversal of an existing refi ned petroleum products pipeline system
1209 Hardy StreetHouston, TX 77020Tel: (713) 222-0146Tel: (800) 231-7205Fax: (713) 222-7403
Copyright 2015Knapp Polly Pig, Inc.All rights reserved
E-mail: knapp@pollypig.comwww.pollypig.com
By-pass ports::Gauging plates::Transmitter cavities::Medium or heavy density foam
Available options:
Single piece bodyBi-Directional
Condensate removalParaffin scrapingDewateringCommissioning
Quality-built in Houston, Texasfor over 25 years
FOAM DISC PIGThe Original Manufacturer of the
Steel wire brush
Rounded nose Extended-Length
Plastic brush
24 Pipeline News November 2017 • www.pipeline-news.com
PLANNEDProjects in development
Length: 135 milesDiameter: 16 inchesLocation: Houston, TX - Hearne, TXCapacity: 85 MbpdCost: $375 million (Magellan’s share)Status: Project is awaiting necessary permits and
regulatory approvalCompletion: 2Q 2019Comments: Project will provide the ability to deliver
additional product north to Temple, Waco and Dallas as well as Magellan’s Midcontinent markets, including Little Rock, AR. If warranted by additional customer demand, pipeline capacity originating in the Houston area could be further increased
MexicoINVEX GRUPO INFRAESTRUCTURA, S.A.P.I. DE C.V. – (11/17)Project: Tajín Pipeline ProjectType: Project includes pipeline and storage
terminal constructionLength: 165 milesDiameter: 20 inchesLocation: Tuxpan, Veracruz - Mexico ValleyCapacity: 165 MbpdCost: $350 millionStatus: Project is out for bidsCompletion: 2Q 2018Comments: Project will give the Mexico Valley area
access to the import markets from the U.S., Europe and the Caribbean
MONTERRA ENERGY – (REV 11/17)Owner 1: TransCanada Corp. (50%)Owner 2: Sierra Oil and Gas (40%)Owner 3: Grupo TMM (10%)Project: Monterra del Centro PipelineType: Project includes construction of
pipelineLength: 167 milesDiameter: 18 inchesLocation: Tuxpan, Veracruz - Tula, HidalgoCapacity: 100 MbpdStatus: Project is in the development stageCompletion: 3Q 2018Comments: Pipeline will run parallel to
TransCanada’s natural gas pipeline from Tuxpan to Tula that is currently under construction
OFFSHORE - The AmericasU.S. WILLIAMS COMPANIES INC. – (8/17)Operator: Transcontinental Gas Pipe Line Co. LLCProject: Central Texas Gathering System FacilitiesType: Project includes pipeline abandonment
and constructionLength: 40 milesDiameter: 20 inchesLocation: off shore Texas (Brazos Block A-133A to
Brazos Block 538)Capacity: 2.6 Bcf/dCost: $2.9 millionDocket: CP17-450Status: Project fi led an application with FERC
OTHER - The AmericasU.S. DENBURY RESOURCES – (9/16)Project: Cedar Creek Anticline ProjectType: Project includes construction of pipelineLength: 120 milesDiameter: 20 inchesLocation: Eastern MontanaCost: $225 millionStart: 2Q 2018
GAS – InternationalAsia PacificALCAN GOVE PTY LTD. – (REV 2/17)Project: Katherine to Gove Gas Pipeline Type: Project includes the construction and
operation of new pipelineLength: 373 milesLocation: Katherine - GoveComments: Project is currently undergoing a feasibility
study
BANGLADESH PETROLEUM CORP. – (9/17)Project: Dhaka to Chittagong PipelineType: Project includes pipeline constructionLength: 155 milesDiameter: 16 inchesLocation: Dhaka – ChittagongCapacity: 3 MMtpaStatus: Project is securing land acquisition
Contractor: Engineers India Ltd.Type: Project includes route surveying
Contractor: Bangladesh ArmyType: Project includes engineering,
procurement and construction
CHINA PETROCHEMICAL CORP. (SINOPEC) –(9/17)Project: Erdos-Anping-Cangzhou PipelineType: Project includes construction of a trunk
and fi ve trunk linesLength: 1,424 milesLocation: Xiongan New Area, Beijing – Cangzhou,
Hebei provinceCapacity: 30 Bcm/yCost: $5.1 billionStatus: Project has been approved by the National
Development and Reform CommissionStart: 2019Comments: Project is designed to connect major LNG
storage with Xiongan New Area, China’s new economic zone near capital Beijing and is part of Sinopec’s clean heating program on the northern region
INDIAN OIL CORP. LTD. – (1/13)Project: Sanganer-Bijwasan Naphtha PipelineType: Project includes the construction of new
pipelineLength: 183 milesLocation: Sanganer - Bijwasan NaphthaComments: Project is currently awaiting development
decisions
Project: Patna to Motihari and Baitalpur Pipeline
Type: Project includes the construction of new pipeline
Length: 167 milesLocation: Patna to MotihariComments: Project is currently awaiting development
decisions
Project: Cauvery Basin-Trichy Pipeline Type: Project includes the construction of new
pipelineLength: 74 milesLocation: Cauvery Basin refi nery - TrichyComments: Project is currently awaiting development
decisions
Project: Ennore-Trichy-Puducherry LPG PipelineType: Project includes the construction of new
pipelineLength: 248 milesLocation: Ennore – Trichy - PuducherryComments: Project is currently awaiting development
decisions
PHILIPPINE NATIONAL OIL CO. – (REV 12/16)Project: Batangas-Manila PipelineType: Project includes the construction of new
pipelineLength: 65 milesLocation: Batangas - ManilaStart: Delayed
RELIANCE INDUSTRIES – (REV 7/13)Project: Kakinada-Basudebpur-Howrah Pipeline Type: Project includes the construction of new
pipelineLength: 680 milesLocation: Kakinada-Basudebpur-HowrahComments: According to the New Indian Express,
land owners opposed the project due to inadequate compensation and safety concerns with past pipeline leakage
SINOPEC – (11/16)Project: Zhundong Coal-to-Gas Plant Type: Project includes the construction of new
gas pipelinesLength: 4,970 milesLocation: Zhundong, ChinaCompletion: 2021Comments: Project will be the largest coal-to-gas
plant in China and will help increase domestic energy effi ciency and cut reliance on oil and gas imports
Contractor: Chu Kong PETType: Project includes pipeline supply
FSU Eastern EuropeAZERBAIJAN/TURKMENISTAN/GOV. OF UK – (REV 8/16)Project: Trans Caspian Gas Pipeline Type: Project includes the construction of new
pipeline, including a subsea portionLength: 186 milesLocation: Türkmenbaşy – Caspian Sea - Sangachal
Terminal, BakuComments: Project will have a capacity of 30 Bcm
www.pipeline-news.com • November 2017 • Pipeline News 25
GASCADE GASTRANSPORT – (REV 11/17)Owner 1: Wintershall Holding GmbHOwner 2: GazpromProject: European Gas Pipeline Link (EUGAL) Type: Project includes construction of a two-
string pipeline, compressor station and receiving station
Length: 301 milesDiameter: 55 inchesLocation: Brandenburg - Saxony - Mecklenburg-
Western PomeraniaCapacity: 51 Bcm/yStatus: First pipes have been delivered for the
project Start: 3Q 2018Completion: 4Q 2020Comments: Project will be constructed parallel
to the existing OPAL Pipeline and connected at the landing point of the Nord Stream 2 network in order to deliver Russian gas into central Europe
Contractor: EuropipeType: Contract includes pipe supply for the
project
GAZPROM – (REV 12/16)Project: Yamal – Europe-2 Pipeline Type: Project includes the construction of new
pipelineLength: 250 milesLocation: Poland - Slovakia - Hungary Completion: 2019Comments: Project will have an annual throughput of
no less than 15 Bcm of gas
GAZ-SYSTEM S.A – (REV 11/17)Owner 2: EnerginetProject: Baltic Connector Pipeline Type: Project includes the construction
of a bi-directional gas transmission pipeline, two onshore gas transmission pipelines, a gas metering station and two compressor stations
Length: 93 milesDiameter: 20 and 27 inchesLocation: Paldiski (Estonia) - Inkoo (Finland)Capacity: 7.2 MMcm/dCost: $293 millionStart: 2Q 2018Completion: 4Q 2019Comments: Project will provide Denmark and
Poland with direct access to Norway’s gas fi elds
Contractor: Neste JacobsType: Contract includes engineering for the
project
Contractor: MMTType: Contract includes a route survey for the
off shore pipeline
Project: Poland-Slovakia PipelineType: Project includes the construction of new
pipelineLength: 158 milesLocation: Poland - Slovakia Start: 2018Comments: Project will connect the natural gas
transmission systems of the two countries and expansion of the Poland-Czech Republic Pipeline
Project: Zdzieszowice-Wrocław PipelineType: Project includes the construction of new
pipelineLength: 80 milesDiameter: 30 inchesLocation: Zdzieszowice - WrocławCapacity: 8.4 MtpaComments: Project is currently awaiting development
decisions
Project: Szczecin-Lwówek PipelineType: Project includes the construction of new
pipelineLength: 116 milesLocation: Szczecin - LwówekComments: Project is currently awaiting development
decisions
Project: Strachocina-Pogórska Wola PipelineType: Project includes the construction of new
pipelineLength: 60 milesDiameter: 30 inchesLocation: Strachocina - Pogórska WolaCost: $445 millionStatus: Project is currently awaiting development
decisionsCompletion: 4Q 2019Comments: Project will enable the transmission of gas
from Hermanowice imports to Pogórska Wola and further in the direction of Śląsk, as well as the transmission of gas from the Underground Gas Storage in Strachocina to the transmission system directly in the western direction
MALTA/SICILY – (7/17)Project: Malta to Sicily PipelineType: Project includes the construction of a
22-inch pipelineLength: 98 miles (21 miles onshore and 77 miles
off shore)Location: Gela, Sicily – Delimara, MaltaCapacity: 2 Bcm/yCost: $360 millionStatus: Malta and Sicily have signed a letter of
intent that will allow for progress to be made regarding the construction of the project
Completion: 2024
POLAND/DENMARK – (6/17)Project: Poland to Norway PipelineType: Project will link Poland to gas from
Norway and increase the security of its energy supplies
Location: Poland - NorwayStatus: Project is seeking capacity commitments
POLAND/LITHUANIA – (REV 8/17)Project: Gas Interconnection Poland–LithuaniaType: Project includes the construction of new
pipelineLength: 445 milesLocation: Lithuania - Poland Capacity: 2.3 Bcm/yCost: $658 millionCompletion: 2019Status: Project is currently undergoing route
studiesComments: Pipeline is a part of the Baltic Energy
Market Interconnection Plan Project
Southeast Connections, LLC2720 Dogwood Dr. SE
Conyers, GA 30013404-659-1422
www.seconnections.com
• New Pipeline Construction • Pipeline Maintenance and Integrity Management • Pipeline Relocation “Providing expert options for today’s ever-changing utility installation requirements”
Southeast Connections, LLC
1-17_SE_Connections_Ad1.indd 1 1/12/2017 8:58:14 PM
26 Pipeline News November 2017 • www.pipeline-news.com
VaculiftsShearsHammersBuckets
WHEEL LOADERSAll machines 21/2 to 9 yrds.All current Kawasaki models available with couplers, forks or buckets.
EXCAVATORSAll machines from 17,000 to 111,000 lbs. All current Kobelcomodels available.
OFF ROADDUMP TRUCKSBell Truck models, Cat and other makes available, from 25 to 50 ton.
MOTOR GRADERSMany models to choosefrom: 140H, 140M & 14H. Joystick or lever controls, scarifiers & rippers, Accugrade ready.
CRANESCrawlers, rough terrain and carrydeck models available. From 30 to 100 ton.
COMPRESSORSIngersoll Rand, Atlas Copco, Doosan, Sullair. 100 to 125 psi. Tier 3 or 4 diesel available.
LIGHT PLANTSAvailable with 90 hr. runtime, 6.0kW single phase generators,auto start / stop.
PIPELAYERS& SIDEBOOMSMidwestern booms with 20,000 to 40,000 lbs. max lift. Many makes and models to choose from.
WATER TRUCKSOn and off road trucks available. From 2,000 to 8,000 gallons.
ON HIGHWAYDUMP TRUCKSWestern Star, International, Mack, F450’s, F750’s and more!
DOZERSA variety of models to choose from. Cat D3K’s to D8T’s available with winches, rippers and angle blades.
Morooka MST1500 Personnel Carriers
Morooka MST1500 Fuel Tankers
LICENSED AND INSURED TRANSPORTATION SERVICES AVAILABLE
Crane Mat Grapples
Morooka MST1500 Vacuums
ATTACHMENTS
Morooka MST1500 Flatbeds
Morooka MST1500 Sandblasters
Morooka MST1500 Dumpers
Morooka MST2200 Dumpers
320 Briscoe Drive Morris, Illinois 60450 www.iltruck.com rental@iltruck.com
One Call Rents It All! 815-941-1900
RUBBER TRACK CARRIERS New models available: 800’s, 1500’s and 2200’s. Dumpers, Flatbeds, Personnel Carriers, Mounted Vacuums, Fuel Tanks, Welders, Compressors, Sandblasters and Conveyors. • Custom configurations are available upon request, call one of our sales or rental representatives to inquire.
www.pipeline-news.com • November 2017 • Pipeline News 27
VaculiftsShearsHammersBuckets
WHEEL LOADERSAll machines 21/2 to 9 yrds.All current Kawasaki models available with couplers, forks or buckets.
EXCAVATORSAll machines from 17,000 to 111,000 lbs. All current Kobelcomodels available.
OFF ROADDUMP TRUCKSBell Truck models, Cat and other makes available, from 25 to 50 ton.
MOTOR GRADERSMany models to choosefrom: 140H, 140M & 14H. Joystick or lever controls, scarifiers & rippers, Accugrade ready.
CRANESCrawlers, rough terrain and carrydeck models available. From 30 to 100 ton.
COMPRESSORSIngersoll Rand, Atlas Copco, Doosan, Sullair. 100 to 125 psi. Tier 3 or 4 diesel available.
LIGHT PLANTSAvailable with 90 hr. runtime, 6.0kW single phase generators,auto start / stop.
PIPELAYERS& SIDEBOOMSMidwestern booms with 20,000 to 40,000 lbs. max lift. Many makes and models to choose from.
WATER TRUCKSOn and off road trucks available. From 2,000 to 8,000 gallons.
ON HIGHWAYDUMP TRUCKSWestern Star, International, Mack, F450’s, F750’s and more!
DOZERSA variety of models to choose from. Cat D3K’s to D8T’s available with winches, rippers and angle blades.
Morooka MST1500 Personnel Carriers
Morooka MST1500 Fuel Tankers
LICENSED AND INSURED TRANSPORTATION SERVICES AVAILABLE
Crane Mat Grapples
Morooka MST1500 Vacuums
ATTACHMENTS
Morooka MST1500 Flatbeds
Morooka MST1500 Sandblasters
Morooka MST1500 Dumpers
Morooka MST2200 Dumpers
320 Briscoe Drive Morris, Illinois 60450 www.iltruck.com rental@iltruck.com
One Call Rents It All! 815-941-1900
RUBBER TRACK CARRIERS New models available: 800’s, 1500’s and 2200’s. Dumpers, Flatbeds, Personnel Carriers, Mounted Vacuums, Fuel Tanks, Welders, Compressors, Sandblasters and Conveyors. • Custom configurations are available upon request, call one of our sales or rental representatives to inquire.
28 Pipeline News November 2017 • www.pipeline-news.com
PLANNEDProjects in development
Middle EastGOV. OF IRAN – (REV 3/17) Project: Iran-Iraq-Syria PipelineType: Project includes the construction of
pipelineLength: 3,500 milesDiameter: 56 inchesLocation: Iran – Iraq - SyriaCapacity: 110 MMcm/dCost: $10 billionStatus: Project is in the planning stage
KOREA GAS CORP. – (REV 4/17)Type: Project includes construction of one
onshore lateral from Rudan to Mobarak Mount, and one off shore lateral from Mobarak Mount to Sohar Port in Oman
Length: 250 milesLocation: Iran - OmanCost: $1.2 billionStatus: Project is undergoing route changesComments: Feasibility studies for the off shore section
of the pipeline are complete
AfricaEAST AFRICAN COMMUNITY – (REV 12/16)Project: Dar es Salaam-Tanga-Mombasa PipelineType: Project includes the construction of new
pipeline and gas skid supply terminalsLength: 329 milesLocation: Tanzania - MombasaComments: Project is currently undergoing a feasibility
study
OIL - InternationalAfricaKENYA PIPELINE CO. – (REV 11/17) Project: Eldoret - Kampala PipelineType: Project includes the extension and
reversal of existing pipeline, including mainline pumps, intermediate pump stations and road/rail loading facilities
Length: 497 milesDiameter: 8 and 14 inchesLocation: Eldoret – KampalaCapacity: 1 Bcf/dStatus: Project has released construction bidsComments: Project will also serve markets in
South Sudan, DRC Congo, Burundi and Tanzania
Contractor: Prome Construction Ltd.Type: Project includes the engineering,
procurement and construction of the pipeline
MALAWI GOVERNMENT – (REV 7/16)Project: Moz-Malawi-Zambia-Congo PipelineType: Project includes the construction of new
pipeline, pumping stations and storage tanks
Length: 504 milesLocation: Moz – Malawi – Zambia - CongoComments: Pipeline will have 500 cm/month of
capacity
SOUTH SUDAN – (REV 12/16)Project: Juba-Lamu oil pipelineType: Project includes the construction of new
pipelineLength: 1,242 milesLocation: Juba - LamuCapacity: 450 MbpdComments: Project is currently in the feasibility
stages and, when complete, will transport between 700M to one million barrels of crude oil from South Sudan to other countries via the proposed Lamu Port, as an alternative route to Port Sudan
Middle EastMINISTRY OF OIL OF IRAQ – (8/17)Operator: State Company for Oil Projects Project: Basra-Aqaba PipelineType: Project includes construction of dual oil
and gas pipelinesLength: 440Location: Basra, Iraq - Aqaba, JordanCapacity: 2.25 Mbpd 500 Mcf/dCost: $18 billionStart: 4Q 2018Complete: 4Q 2020Status: Project is in the tender process
Contractor: SNC LavalinType: Project includes engineering,
procurement and design
OFFSHORE – InternationalAsia PacificASIA CONSORTIUM ENGR./DOSB – (3/16)Project: Trans Oriental Gas PipelineType: Project includes the construction of a
subsea pipelineLength: 2,485 milesCompletion: 2022Location: Malaysia - South KoreaComments: An MoU for the project has been signed
FSU Eastern EuropeGOV. OF RUSSIA/GOV. OF JAPAN – (REV 6/17)Project: Sakhalin - Japan PipelineType: Project includes the construction of new
pipelineLength: 807 milesLocation: Sakhalin - JapanCapacity: 25 Bcm/yCost: $6.7 billionStatus: Japanese lawmakers are revisiting the
delayed project due to high demand
Middle EastTRADE BANK OF IRAQ – (REV 7/17)Project: Basra - Aqaba PipelineType: Project includes pipeline constructionLength: 1,044 milesLocation: Basra - AqabaCapacity: 4.5 MMbpdStatus: An MoU was signed in November 2015Comments: Jordan is urging the reopening of the Iraq
border, which would push the project forward
Western Europe & EU CountriesSTATOIL – (REV 1/17)Project: Skrugard Field DevelopmentType: Project includes pipeline constructionLength: 174 milesLocation: Skrugard - VeidnesCapacity: 200 MbpdCompletion: 4Q 2018
Contractor: MulticonsultType: Project includes the front-end
engineering and design for the pipeline
AfricaBP – (11/17)Operator: Kosmos EnergyProject: Tortue Development ProjectType: Project includes subsea gas production,
a fl oating gas treatment facility, a pipeline with domestic gas connection points and a nearshore gas conversion hub facility
Location: off shore Mauritania and SenegalCost: $1 billionStart: 2Q 2018
Contractor: KBR Inc.Type: Project includes pre-FEED services for
the project