photo journal v8. 9 16-14

Post on 30-Jun-2015

10.362 Views

Category:

Presentations & Public Speaking

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Photo and written presentation of problems with the civil court house.

TRANSCRIPT

DADE COUNTY COURTHOUSE

PhotoJournal

OfficeofGovernmentLiaison & PublicRelations September16th,2014

Guided Tour

Current:Basementcolumnwithwateraccumulationoneastside

Current:Basementcolumnwithwateraccumulationonnorthside

#1 Columns

Current:Basementcolumnswithwateraccumulationnearnorthentrancesurroundedbydrywallenclosure

1

Current:Corrodedbasementcolumnsonnorthside

#2 Columns & Corroded Shelving

2

Exposedcorrodedrebar(reinforcementbars)inslopingceilingbasment

#3 Corrosion

Current:Slopingceilinginfileroomonnorth side.Rustedrebar(reinforcementbars)&cracked

cementonbeams

#4 Exposed Rusted Rebar

3

#5 Compromised Workspaces

Current:Pumpingwateroutofworkspaces-walkinghazardsonwestside

4

Current:Corrodedshelvingsupportsineast sidebasementfileroomduetowaterintrusion

Current:Ruston24thfloorsigninstairwell2

#6 Rust

Current:Corrosiononconduitpipesemerg-ingfrominteriorwall

#7 The 25th Floor

Current:Crackedfaçadeoverinteriorcolumn

#8 The 25th Floor

5

Current:Algaegrowingoninteriorwallsduetowaterintrusion

#9 The 25th Floor

Curent:Exposedcorrodedrebar(reinforcementbars)oninteriorfloor

#10 The 25th Floor -Algae

6

Water Intrusion

Current:Wastewaterleakingintoofficeon9thfloor

Workingconditions:Waterintrusionin22ndfloorstaffattorneys’offices

Damagetowallin19thfloorbathroom

Humiditydamagein16thfloorstairwell

Water Intrusion

7

Current:Wateraccumulationnearhallwayonwestside

Water Intrusion

Current:Floodingandcorrosiononbottomshelvesinbasementfileroomonnorthside

Workingconditions:23rdfloorofficeshowsfloodingpriortoremediation

8

Fandryingwaterdamagedfilesinthebasement

Corrosion

Current:Corrosioninsidewestbasemententrywayprior toremediation

Corrosion

WorkingConditions:Exposedcorrodedpipesandleaksaboveactiveofficespaces

9

Crackedfaçadeovercolumnsinbasementmailroombeforeremediation

Crumbledfaçadeovercolumnsinbasementbeforeremediation

Corrosion

Removalofrustedbeamsduringfaçaderestorationproject

10

Termites

TermiteActivityon22ndfloor

Termiteactivityincourtroom5-2

Termites

TermiteActivityon6thFloor

11

Mold and Air Quality

Moldbeforeremediation

8thfloorofficescontainingmoldbeneathwallpaperbeforeremediation

Mold/ Air Quality

14thfloormoldonwallsbeforeremediation

12

Inadequate Space

Workingconditions:limitedvisibiltyincourtroom10-1

Inadequate Space

WorkingConditions:5thfloorjudge’schambershaslimitedareatoaccessfiles

13

Structural Damage

Exteriorstructuraldamageprior tofaçaderestorationproject

Structural Damage

14

top related