photo album for union twp, nj job 18843 march 30, 2007 · © 2015 fire & safety consulting,...

Post on 29-May-2020

2 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

© 2015 Fire & Safety Consulting, LLC © 2015 Fire and Safety Consulting

Photo Album for Somerville, MA

Job 28089-01

March 6, 2015

This week the cab finished on the cab line and has

been merged with the chassis along with the pump

house. The body finished in paint and began on the line

where harnessing and trim are added. Next week the

chassis is scheduled to begin on the main assembly

line where the body and water tank should be merged

with the chassis.

© 2015 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC07502 DSC07503

DSC07504 DSC07505

© 2015 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC07506 DSC07507

DSC07508 DSC07509

© 2015 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC07510 DSC07511

DSC07512 DSC07513

© 2015 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC07514 DSC07515

DSC07516 DSC07517

© 2015 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC07518 DSC07519

DSC07520 DSC07521

© 2015 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC07522 DSC07523

DSC07524 DSC07525

© 2015 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC07526 DSC07527

DSC07528 DSC07529

© 2015 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC07530 DSC07531

DSC07532 DSC07533

© 2015 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC07534 DSC00388

DSC00389 DSC00390

© 2015 Fire & Safety Consulting, LLC WWW.FASCG.COM

DSC00391 DSC00392