philippines build. build. build. - ceoe · 2017-06-28 · subject to completion of feasibility...
Post on 27-Apr-2020
4 Views
Preview:
TRANSCRIPT
PHILIPPINES
1
2
PHILIPPINES
3,0
8
4,4
1
2,8
9
3,6
5
4,9
7
6,7
4,7
8 5
,24
6,6
2
4,1
5
1,1
5
7,6
3
3,6
6
6,6
8 7,0
6
6,1
3
5,8
1
6,8
' 9 9 ' 0 0 ' 0 1 ' 0 2 ' 0 3 ' 0 4 ' 0 5 ' 0 6 ' 0 7 ' 0 8 ' 0 9 ' 1 0 ' 1 1 ' 1 2 ' 1 3 ' 1 4 ' 1 5 ' 1 6
SUSTAINED GDP GROWTH MANAGEABLE
INFLATION
3
PHILIPPINES
“BBB” RATING
˃US$80B FOREIGN RESERVES
4
Build. Build. Build.
5
BOLDEST, MOST AMBITIOUS INFRASTRUCTURE PROGRAM IN HISTORY
(in Euros)
Source: Philippine Institute for Development Studies
2017 National Expenditure Program
0 7.5 15 23.5
2017
2018
2019
2020
2021
2022
15 B
21.4 B
23.2 B
26.8 B
30.4 B
33.9 B
150 B Euros
in 6 years
6
7
NLEX-SLEX CONNECTOR
8
LUZON SPINE EXPRESSWAY
NETWORK
9
METRO CEBU EXPRESSWAY
10
MINDANAO DEVELOPMENT ROAD NETWORK
11
PHOTOS ARE FOR REFERENCE ONLY
PANGUIL BAY BRIDGE TANGUB CITY - MISAMIS OCCIDENTAL - TUBOD LANAO DEL NORTE
12
12 PASIG RIVER, MARIKINA RIVER AND MANGGAHAN FLOODWAY BRIDGES
North and South Harbor Bridge Binondo-Intramuros Bridge
2nd Ayala Bridge (Carlos Palanca-San Marcelino) Beata-FY Manalo Bridge (Pandacan-Sta.Ana) Binondo-Intramuros Bridge Estrella-Pantaleon Bridge F.Blumentritt-Antipolo Bridge Kabayani-Katipunan Bridge Reposo-Guatemala Bridge JP Rizal-Yale Bridge G.Gabriel St.-Mercury Ave Bridge East Bank-West Bank Bridge 1 East Bank-West Bank Bridge 2
13
PNR SOUTH RAILWAY MANILA - BICOL
COST
4.9 B Euros
A 653 km rail line designed to accommodate around
400,000 passengers per day on opening year.
14
SUBJECT TO COMPLETION OF FEASIBILITY STUDY AND APPROVAL OF THE PROJECT
MEGA MANILA SUBWAY PHASE 1 (Quezon City - Taguig)
It allows consistent travel from QC - Taguig in just 31 minutes.
370,000 passengers per day on opening year.
COST
4 B Euros
15
PHOTOS ARE FOR REFERENCE ONLY
MINDANAO RAILWAY PHASE 1 - Tagum - Davao - Digos
COST
570 M Euros
A 105 km rail line designed to accommodate around
120,000 passengers per day on opening year.
16
SUBJECT TO COMPLETION OF FEASIBILITY STUDY AND APPROVAL OF THE PROJECT
COST
679 M Euros
A 48.6km high quality bus-based mass transportation system, with a corresponding
pedestrian and bicycle greenway network.
EDSA CENTRAL CORRIDOR BRT (EDSA, Ayala Ave., Ortigas - BGC, NAIA)
17
NEW CLARK CITY
18
CLARK INTERNATIONAL AIRPORT NEW TERMINAL BUILDING
19
20
A sustained increase in
public infrastructure
spending to 5% of GDP would
add a total of 5-6% to GDP
after 15 years. International Monetary Fund
“
21
For every USD $1 Billion spent on infrastructure 200,000 direct jobs are created per year. International Labour Organization
Estimate for developing countries
22
23
24
25
26
27
28
29
top related