philippines build. build. build. - ceoe · 2017-06-28 · subject to completion of feasibility...

Post on 27-Apr-2020

4 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

PHILIPPINES

1

2

PHILIPPINES

3,0

8

4,4

1

2,8

9

3,6

5

4,9

7

6,7

4,7

8 5

,24

6,6

2

4,1

5

1,1

5

7,6

3

3,6

6

6,6

8 7,0

6

6,1

3

5,8

1

6,8

' 9 9 ' 0 0 ' 0 1 ' 0 2 ' 0 3 ' 0 4 ' 0 5 ' 0 6 ' 0 7 ' 0 8 ' 0 9 ' 1 0 ' 1 1 ' 1 2 ' 1 3 ' 1 4 ' 1 5 ' 1 6

SUSTAINED GDP GROWTH MANAGEABLE

INFLATION

3

PHILIPPINES

“BBB” RATING

˃US$80B FOREIGN RESERVES

4

Build. Build. Build.

5

BOLDEST, MOST AMBITIOUS INFRASTRUCTURE PROGRAM IN HISTORY

(in Euros)

Source: Philippine Institute for Development Studies

2017 National Expenditure Program

0 7.5 15 23.5

2017

2018

2019

2020

2021

2022

15 B

21.4 B

23.2 B

26.8 B

30.4 B

33.9 B

150 B Euros

in 6 years

6

7

NLEX-SLEX CONNECTOR

8

LUZON SPINE EXPRESSWAY

NETWORK

9

METRO CEBU EXPRESSWAY

10

MINDANAO DEVELOPMENT ROAD NETWORK

11

PHOTOS ARE FOR REFERENCE ONLY

PANGUIL BAY BRIDGE TANGUB CITY - MISAMIS OCCIDENTAL - TUBOD LANAO DEL NORTE

12

12 PASIG RIVER, MARIKINA RIVER AND MANGGAHAN FLOODWAY BRIDGES

North and South Harbor Bridge Binondo-Intramuros Bridge

2nd Ayala Bridge (Carlos Palanca-San Marcelino) Beata-FY Manalo Bridge (Pandacan-Sta.Ana) Binondo-Intramuros Bridge Estrella-Pantaleon Bridge F.Blumentritt-Antipolo Bridge Kabayani-Katipunan Bridge Reposo-Guatemala Bridge JP Rizal-Yale Bridge G.Gabriel St.-Mercury Ave Bridge East Bank-West Bank Bridge 1 East Bank-West Bank Bridge 2

13

PNR SOUTH RAILWAY MANILA - BICOL

COST

4.9 B Euros

A 653 km rail line designed to accommodate around

400,000 passengers per day on opening year.

14

SUBJECT TO COMPLETION OF FEASIBILITY STUDY AND APPROVAL OF THE PROJECT

MEGA MANILA SUBWAY PHASE 1 (Quezon City - Taguig)

It allows consistent travel from QC - Taguig in just 31 minutes.

370,000 passengers per day on opening year.

COST

4 B Euros

15

PHOTOS ARE FOR REFERENCE ONLY

MINDANAO RAILWAY PHASE 1 - Tagum - Davao - Digos

COST

570 M Euros

A 105 km rail line designed to accommodate around

120,000 passengers per day on opening year.

16

SUBJECT TO COMPLETION OF FEASIBILITY STUDY AND APPROVAL OF THE PROJECT

COST

679 M Euros

A 48.6km high quality bus-based mass transportation system, with a corresponding

pedestrian and bicycle greenway network.

EDSA CENTRAL CORRIDOR BRT (EDSA, Ayala Ave., Ortigas - BGC, NAIA)

17

NEW CLARK CITY

18

CLARK INTERNATIONAL AIRPORT NEW TERMINAL BUILDING

19

20

A sustained increase in

public infrastructure

spending to 5% of GDP would

add a total of 5-6% to GDP

after 15 years. International Monetary Fund

21

For every USD $1 Billion spent on infrastructure 200,000 direct jobs are created per year. International Labour Organization