performer wp2 introduction 13th of september 2013 cstb sophia antipolis, france
Post on 14-Dec-2015
212 Views
Preview:
TRANSCRIPT
PERFORMERWP2
INTRODUCTION
13th of September 2013
CSTB Sophia Antipolis, France
| PAGE 2PERFORMER Kick-Off meeting
WP2 ‘HOLISTIC ASSESSMENT FRAMEWORK FOR BUILDING ENERGY PERFORMANCES’ – OVERVIEW
• Objectives:• To build a consistent and comprehensive framework, which augments
the PERFORMER solution with ICT-enabled smartness and automation
• Facts & figures• RTD work-package – mainly focused on ICT• Duration: M1 – M30• Involving UPL, CSTB, CEA, CU, BRE, EC, GDF, SG, SIGMA, CCC
(Leader CEA)• Total WP effort = 93 p.m (15% of project’s total effort)
• Activities• Specifying and prototyping a comprehensive and adaptable (i.e. scalable) ICT
infrastructure (sensors, communication software, interfaces, and devices) for building energy, comfort and usage data collection.
• Assessing, selecting and implementing the most relevant combinations of artificial intelligence and building digital modelling approaches for real-time energy monitoring, awareness and management.
• Providing smart visualization and decision support during operation phase.
| PAGE 3DELFT, 17-18 SEP 2013
Task 2.1: Base technology selection (CU)
Task 2.2: Building intrinsic and actual performances energy assessment ICT infrastructure (ECG)
Task 2.3: Energy performance modelling environment (CEA)
Task 2.4: Energy performances management (CSTB)
D2.1: Performer Base Technologies Report (M6, 9 p.m)
D2.2: Intrinsic Performances Assessment Framework (M24, 24 p.m)
D2.3: Energy Performance Modelling Environment (M24, 27 p.m)
D2.4: Actual Performance Monitoring and Management Framework (M30, 33 p.m)
WP2 ‘HOLISTIC ASSESSMENT FRAMEWORK FOR BUILDING ENERGY PERFORMANCES’ – STRUCTURE
PERFORMER Kick-Off meeting
MS4: Delivery of Intrinsic and in-use performance monitoring and management framework (M30)
WP1: Global framework and methodologies
Methodological supportD1.1: PERFORMER framework (M12)D1.2: Methodologies for the Assessment of Intrinsic Energy Performance of Building Envelopes (M15)D1.3: Cost Optimised Energy Performance Measurement Plan Methodology (M15)D1.4: Specification for Energy Management, Fault Detection and Diagnostic Tools (M15)Pilot informationD3.1: Pilot Building Characteristics and Related Energy Data (M9)D3.3: Pilot Information Model (M12)D3.4: Consideration of Measurement Challenges (M12)Demonstration requirementsD4.1: Pilot Version Sharing and Awareness Raising Report (M6)
WP3: Pilot Data Gathering
WP4: Demonstrators
WP2: ICT framework
WP4: Demonstrators
WP5: Replication and Assessment
WP6: Dissemination and
exploitation
WP1: Global framework and methodologies
SoA (D2.1) and ICT-related requirements and limitations
Technology Research results
ICT infrastructure and tools (D2.2, D2.3, D2.4)
WP2 ‘HOLISTIC ASSESSMENT FRAMEWORK FOR BUILDING ENERGY PERFORMANCES’ – DEPENDENCIES
| PAGE 5
ACTIVITY PLAN M1-M6 WP2 ‘HOLISTIC ASSESSMENT FRAMEWORK FOR BUILDING ENERGY PERFORMANCES’
Activity Expected outcome Partners involved Deadline
1. Review of WP2 partners’ background
Summary of technological background available to WP2
All WP2 partners 10/2013
2. Clarification of technological contributions
Summary of contributions – tools architecture overview – detailed structure of D2.1
All WP2 partners 11/2013
3. Technology review (-> D2.1) State of the art contributions
TRF, RNS, AOC, APH
01/2014
4. D2.1 consolidation D2.1 for internal review CU, CEA, CSTB, GDF
02/2014
5. Development planning refinement
M6-24 detailed development planning
Task leaders: CU, EC, CEA, CSTB
02/2014
Objectives in M1-M6 SoA – technologies selection - clarification of contributions
Active tasks T2.1 ‘Base technology selection’ mainly – CU ; All tasks to start during the first 6 months.
Planned effort 10-12 person-months (out of total 93 person-months for this WP)
Remark/anticipated issue
-
PERFORMER Kick-Off meeting
WP2 - COMMENTS
Work organization
List of participants + one main contact point for each partners
One conf call every two weeks
F2Fmeetings when necessary
Having a WP2 workshop at M3 about the architecture?
Need business models
Initially planned at M48 – early internal delivery?
The planning is tight
Two ICT deliverables at M24
There is a risk of “drift” to M28-M30
Need for an early awareness of end-users functional requirements
From WP3-4-5
Impact on technology choice (e.g. MAS vs expert systems)
THANK YOU
Any questions?