1/17SMOS Commissioning KP-0, ESAC, 9 December 2009
Payload Functionality during SODAP: preliminary review
SMOS Project Team, ESTEC/ESAC/ESRIN
EADS-CASA Espacio, UPC, TKK and DEIMOS
SMOS CEC, ESAC
Presented by: M. Martín-Neira
2/17SMOS Commissioning KP-0, ESAC, 9 December 2009
CONTENTS
- On-board Subsystems Check
- CMN A2 Strategy
- IOCP High Level Planning
- RFI
- Next Steps
3/17SMOS Commissioning KP-0, ESAC, 9 December 2009
LICEFs
A2 segment right after switch-on 17-Nov-09 (6 LICEFs); To=10C
LO locked here
Dual Pol: H and V
U-noise
- All LICEF are working well as can be deduced from the PMS values
All other segments like
this one
4/17SMOS Commissioning KP-0, ESAC, 9 December 2009
LO locked here a few Kelvin
NIR V channels right after switch-on 17-Nov-09
To=10C
initialisation
NIRs
- All three NIR units are working fine, within a few Kelvin from each other
NIR H channels similarly
5/17SMOS Commissioning KP-0, ESAC, 9 December 2009
MOHA
- All optical links are fine, as deduced from the correlations over the Antarctica coast line and from redundant correlations (manual check)
LCF-A17 LCF-A18LCF-A05 LCF-A06
6/17SMOS Commissioning KP-0, ESAC, 9 December 2009
On Redundant Baselines
- Redundant baselines are very similar to each other, for all spacings (may help to reduce LO noise injections)
LCF-A05 LCF-A20LCF-A04 LCF-A19
7/17SMOS Commissioning KP-0, ESAC, 9 December 2009
CAS
- The on-board calibration system is working also fine
- The false lock of A2 was discovered during the first CAS operation
Normal Correlations during Calibration Very Low Correlations with A2 Segment
8/17SMOS Commissioning KP-0, ESAC, 9 December 2009
CMN
- The CMNs are working fine
- However they seem to be affected by radiation and lose the LO lock from time to time
- All CMNs recover in 5 or less epochs (this is the affected data) …
- … except A2 which locks onto a secondary frequency
From CAS measurements:
1 / π Δf T < 20 / 6500
Δf > 6500 / 20π T = 86 Hz
9/17SMOS Commissioning KP-0, ESAC, 9 December 2009
Proposed Strategy for CMN A2
From ground measurements it is known that CMN A2 locks better at colder temperatures
A2 unlocks
Now at 22C
Go down to 18C
A2 unlocks
Continue Commissioning
Switch Arm-A OFF - ON
Review Situation
Relocks OK
NOK
Relocks OKNOK
10/17SMOS Commissioning KP-0, ESAC, 9 December 2009
Impact on IOCP High Level Plan
OCEAN FROM SPACE(VENICE)
1 week
SODAP
PAYLOAD
Dual-Full
Key Point
1 2 2b 3
4 5 6
7 8 9 10
11 12 13 14
15 16 17 18
19 20 21 22
KP0
KP2
KP1
KP3
PLM Switch ON
XMAS (24-Dec till 3-Jan)
4X
0
1
2
3
MICRORAD(WASHINGTON)
L2 Collocation
- Instrument commissioning will finish 1 week later than expected- Pseudo-operational phase is shortened by 1 week accordingly
Mon 23-Nov-09
Mon 21-Dec-09
Mon 18-Jan-10
Mon 15-Feb-10
Mon 15-Mar-10
Mon 12-Apr-10
Mon 10-May-10 = Start of Operational Phase
11/17SMOS Commissioning KP-0, ESAC, 9 December 2009
CORRELATOR
- The first correlator test was performed last Monday 7-Dec-2009
- Data to be processed
12/17SMOS Commissioning KP-0, ESAC, 9 December 2009
RFI – first detections
- Spikes in PMS, NIRs and correlations are produced by interferors
- They seldom saturate the PMS voltages
- Full calibration will allow to better focus the interference signals
13/17SMOS Commissioning KP-0, ESAC, 9 December 2009
RFI – geographical distribution
- Strong RFI in Europe, Middle East, South-Eastern Asia, Northern Africa- Smaller localised interferors in other places (even boats)- America, Antarctica, the Arctic, Greenland, Australia, most of Africa and Siberia, widely clean
14/17SMOS Commissioning KP-0, ESAC, 9 December 2009
- Some European countries appear much cleaner than others …
Interference over Europe
15/17SMOS Commissioning KP-0, ESAC, 9 December 2009
- Signature is periodic …
Strong Interferors are Radars
1st peak
2nd peak Nth peak. . . . .
16/17SMOS Commissioning KP-0, ESAC, 9 December 2009
- … and depends on time (SMOS in radar beam)
Strong Interferors are Radars
Legend: First = 1st peak; Second = 2nd peak; 0 = no RFI; 1 = RFI
17/17SMOS Commissioning KP-0, ESAC, 9 December 2009
- Prepare the procedure to set the instrument temperature down to 18C
- Obtain full calibration parameters (except for temperature coefficients)
- Apply FTT to L1 imaging
- Analyse LO calibration rate
- Assess instrument absolute accuracy and sensitivity
- Clearly L1 needs to enhance RFI detection and cleaning
- Verify the Corbella Equation (see next slides)
Next Steps (Week 2b and 3)
18/17SMOS Commissioning KP-0, ESAC, 9 December 2009
HUT-2D verification of Corbella equation
- Try to repeat the same exercise with SMOS …