patrons of  st. columban foundation

Post on 20-Jan-2016

21 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

PATRONS OF  ST. COLUMBAN FOUNDATION. The goal of the foundation is to raise funds through bequests, government grants, personal donations and fundraising events to be used for capitol projects.  - PowerPoint PPT Presentation

TRANSCRIPT

PATRONS PATRONS OF OF 

ST. COLUMBAN ST. COLUMBAN

FOUNDATIONFOUNDATION

The goal of the foundation is to The goal of the foundation is to raise funds through bequests, raise funds through bequests, government grants, personal government grants, personal donations and fundraising events donations and fundraising events to be used for capitol projects. to be used for capitol projects. 

Long term projects will include Long term projects will include the repointing of the exterior the repointing of the exterior walls, roof replacement, chimney walls, roof replacement, chimney and steeple work.  and steeple work. 

A five year plan is in placeA five year plan is in place

Phase 1 – 2008 Phase 1 – 2008 A- Total replacement of the Cornice and repairs to A- Total replacement of the Cornice and repairs to

the roof valleys where some leakage has occurred. the roof valleys where some leakage has occurred.

B- Front (south) Tower Section Wall Elevation. Work B- Front (south) Tower Section Wall Elevation. Work involves repointing all joints, repair and/replace involves repointing all joints, repair and/replace damaged stones, reinstate relevant stone details, damaged stones, reinstate relevant stone details, caulk windows and replace accessible tower caulk windows and replace accessible tower flashing. flashing.

Some work Some work has been has been

completedcompleted

Stone work Stone work & &

re-pointingre-pointing

Gaps between stonesGaps between stones

Needs Needs repairrepair

Stone Stone needing needing repairrepair

Mortar neededMortar needed

Mortar work Mortar work donedone

Stone needing Stone needing repairrepair

Repaired stoneRepaired stone

Stone work to be done Stone work to be done

Stone repaired & re-Stone repaired & re-pointedpointed

Re-pointing Re-pointing donedone

NoNo gaps between stones gaps between stones

Re-pointing Re-pointing donedone

Stone needing Stone needing replacementreplacement

New New stonestone

New stoneNew stone

No gapsNo gaps

Stonework re-Stonework re-pointedpointed

ScaffoldingScaffolding&&

FasciaFascia

Restoration in Restoration in progressprogress

Flashing coming awayFlashing coming away

Fascia needing Fascia needing repairrepair

Restored FasciaRestored Fascia

Re-pointing doneRe-pointing done

Restored FasciaRestored Fascia

Restored Restored FasciaFascia

Plan for 2009Plan for 2009

Phase 2 -2009 Phase 2 -2009

Front (southeast and southwest) wall Front (southeast and southwest) wall elevations. Work involves re-pointing elevations. Work involves re-pointing all joints, repair and/replace all joints, repair and/replace damaged stones, reinstate relevant damaged stones, reinstate relevant stone details, caulk windows and stone details, caulk windows and doors and stabilize southwest corner. doors and stabilize southwest corner.

The 5 Year PlanThe 5 Year Plan Phase 3 -2010 Phase 3 -2010 Phase 4 -2011 Phase 4 -2011 Phase 5 -2012Phase 5 -2012

More detail about the five year plan can be More detail about the five year plan can be found on our website:found on our website:

www.stcolumbans.comwww.stcolumbans.com

PLEASE PLEASE CONSIDERCONSIDER

MAKING MAKING AA

DONATION DONATION

top related