part 4 trafo absw ds
Post on 28-Apr-2015
88 Views
Preview:
DESCRIPTION
TRANSCRIPT
M A T E R I A LNOITEM M A T E R I A LNOITEM
tr
bt
hlc
c
1
1
3
Trafo distribusi 1 phasa
Braket transformer
Hot line clamp
Cco
Kabel shoes
ar
gl
gw
jp
3
1
1
Armor rood
Ground lock
Ground wire
Jumper
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
TRAFO
PEMASANGAN TRAFO 1 PHASAPADA LINE 1 PHASA
CG - 105
ks
1
3
1
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
Plate for transaformer braket1
M A T E R I A LNOITEM M A T E R I A LNOITEM
tr
bt
hlc
c
1
1
3
Trafo distribusi 1 phasa
Braket transformer
Hot line clamp
Cco / Boundel connector
Kabel shoes
ar
gl
gw
jp
3
1
1
Armor rood
Ground lock
Ground wire
Jumper
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
TRAFO
PEMASANGAN TRAFO 1 PHASAPADA LINE 1 PHASA
TERSAMBUNG PADA JTR LVTC
CG - 105
ks
1
3
1
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
Plate for transformer braket1
cco
M A T E R I A LNOITEM M A T E R I A LNOITEM
t
ar
hlc
bt
1
1
2
Trafo distribusi 1 phasa
Armor rood
Hot line clamp
Braket trafo
cc
ks
jk
gw
3
1
Compression connector
Kabel shoes
Jumper LVTC / Kabel
Ground wire
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
TRAFO
KONSTRUKSI TRAFOPADA JTM DEADEND 1 PHASA
CG - 106
1
3
3
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
Plate for transformer braket1
M A T E R I A LNOITEM M A T E R I A LNOITEM
t
ar
hlc
bt
1
1
2
Trafo distribusi 1 phasa
Armor rood
Hot line clamp
Braket trafo
cc
ks
jk
gw
3
1
Compression connector
Kabel shoes
Jumper LVTC / Kabel
Ground wire
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
TRAFO
KONSTRUKSI TRAFOPADA JTM DEADEND 1 PHASATERSAMBUNG PADA JTR LVTC
CG - 106
1
3
3
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
Plate for transformer braket1
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
TRAFO
M A T E R I A LNOITEM M A T E R I A LNOITEM
hcl
1000
1500
ar
LA
1000
800
CG / SG - 107
PEMASANGAN TRAFO 1 PHASADENGAN SERANDANG
dm
p
p
2
2Braket,transformer,cluster and adapter paltes as req’d
Connectors, as required
Connectors, thermal
an
ap
aq
bvek
1
1
1
Transformer CSP type,50 KVA MAX
Clamp hot line tap assembly
Jumpers, stranded as required
Rods, armorLocknuts
2
vb 2 Pole band double rack type
3
2 Besi kanal np 8 x 1000
Besi kanal np 6 x 800
2 Besi siku 4 x 4 x 1500
10 Mur baut 12 x 4 cm
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
Kabel shoes 4
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
CG136
14.4 / 24.9 KV,SINGLE PHASA TRANSFORMER
ON THREE PHASE CIRCUIT
TRAFO
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
1 Transformer braket & stand half
1 Plate for transformer braket
Kabel shoes 4
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
CG312
THREE TRANSFORMERS,CLUSTER MOUNTED4-WIRE GROUNDED WYE-GROUND WYE
FOR 220/380 VOLT POWER LOADS
TRAFO
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
Kabel shoes9
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
TRAFO CG - 312A
1500
2000
C2
C1
KONSTRUKSI TRAFO 3 ø DENGANSERANDANG 1 TIANG
( UNTUK TRAFO 50 - 200KVA )
M A T E R I A LJUMLAH M A T E R I A LJUMLAH
3 buah
3 buah
1 buah
Fuse cut out
Lighting arrester
Braket trafo
Crossarm kanal (2000 mm)
Besi siku 2500
Pole band double rack 8 ½”
Mur baut 2,5 x 12 mm
1 buah
5 buah
4 buah
2 buah
22 buah
4 buahTransformer Dist. 3 phasa
Crossarm kanal (1500 mm (50 x 100mm))
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
Hot line clamp
Cable shoesArmor rood
3 buah
4 buah1 buah
2500
2500
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
TRAFO CG - 313
PEMASANGAN TRAFO 3 PHASAMAX 630 KVA PADA 2 TIANG
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
750
500
750
2500
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
CG-313-A
THREE PHASA TRANSFORMERS STRUCTURE24.9 KV / 220-380 VOLT
FOR 500 AND 750 KVA TRANSFORMERS
TRAFO
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
TRAFO M27
TRANSFORMER CONNECTION GUIDEOPEN WIRE SERVICES
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
M27-1
TRANSFORMER CONNECTION GUIDEDUPLEX OR TRIPLEX SERVICES
TRAFO
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
M27-2
TRANSFORMER CONNECTION GUIDESECONDARY UNDERBUILD
TRAFO
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
M28
TRANSFORMER CONNECTION AND SERVICETAKE-OFF GUIDE FROM SECONDARY
TRAFO
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
600
400 250
600
KONSTRUKSI NT.FS BOXTRAFO 1 PHASA; OUTPUT
2 LINE X DAN X1 2
ground terminal
250
TRAFO 1 FASA 1 TIANG
NT.FSBOX
GB 1-1
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
NT.FSBOX
TRAFO 3 FASA 1 TIANG
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
800
600300
NT FUSE BOX (PAPAN BESI)TRAFO 3 PHASA 1 TIANG
300
RT
NF
BS
MCCB
ground terminal
PT PLN APJ . . . . . . .UPJ . . . . . . . . . . . . . .
AWAS TEGANGAN
GRD NO: . . . . . . . . . .
pandangan depan
GB 3-1
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
NT.FSBOX
TRAFO 3 FASA 2 TIANG
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
1400
1100450
450
RT
NF
BS
MCCB
ground terminal
PT PLN APJ . . . . . . .UPJ . . . . . . . . . . . . . .
AWAS TEGANGAN
GRD NO: . . . . . . . . . .
GB 3-2
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
NT.FSBOX
ITEM MATERIAL
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
ITEM MATERIALNOJMLUKURAN
1
2
NT FUSE
PLAT BESI
3
CABLE SHOES
MCCB
PIPA PRALON
POLE BAND SINGLE RACK
POLE BAND SINGLE RACK
BESI SIKU
PLAT COOPER
NT FUSE REMOVAL4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
NT FUSE HOLDER
KNEE PIPE
GROUND WIRE / BC
H TYPE COMP. CONNECTOR
BESI CANAL NP
GROUND ROOD WITH CLAMP
KABEL NYY
KABEL LVTC
PIPA PRALON
JMLUKURANJMLUKURAN
2
0
3
2
2
1
1
0
1 FASA 1 TIANG 3 FASA 1 TIANG 3 FASA 2 TIANG
2
3
1
0
As req.
2 mm
2 x 30 x 40 x ....
7 ½ ”
25 mm
5/8 x 2500
3x40x80x200mm
3 x 70 mm
3
1
4
2
2
1
1
4
2
3 mm
As req.
1
8
4
2
1
8
As req.
As req.
As req.
As req.
As req.
9 ½ ”
2 ½ ”
½ ”
As req
As req
As req.
As req.
As req.
As req.
As req.
As req.
As req.
7 ½ ”
9 ½ ”
2 ½ ”
½ ”
25 mm
5/8 x 2500
3x40x80x200mm
3 x 70 mm
As req
As req
3
1
0
3 mm
As req.
As req.
As req.
As req.
As req.
As req.
As req.
7 ½ ”
9 ½ ”
2 ½ ”
½ ”
25 mm
5/8 x 2500
3x40x80x200mm
3 x 70 mm
As req
As req
As req.
As req.
As req.
4
As req.
3
1
2
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PERALATAN
KABEL SEC. MASUK DAN KELUAR 2JURUSAN UNTUK GARDU DISTRIBUSI 1 TIANG
50 - 200KVA 3PH 4 KAWAT 220 / 380 V
M8 - A1
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PERALATAN
RINCIAN MATERIAL
M8 - A1
M A T E R I A LKODE JUMLAH
2Steel channel C NP 4 x 750 mm13Pole band single rack1Pole band double rackvb12Bolt machine ½” x 0”C2C1Galvanized pipe 3” x 6600 mmgc21gc42116Shock galvanized pipe 2 ½” 3Shockgalvanized pipe 3”411Bow galvanized pipe 3”
2,5Ground wire 50 mm2195LV Copper cable 4 core 103 mm2 (m) input304Connector compresion terminal lug 105 mm23
Knee galvanized pipe 2 ½” Knee galvanized ppe 3”
chchva
Sh1Sh2Kn1Kn2bw
gc1gc3gc5
CjCp1
P
Cp2PP
4
5Strap u/ kabel TRSaluran PJ bila diperlukanLV copper cable 4 core 16 mm2 (m)
2Connector compression terminal P
Sp
30
2P
Steel channel C NP 4 x 528 mm
Bolt machine ½” x 1 ½ ”
Galvanized pipe 3” x 925 mmGalvanized pipe 2 ½ ” x 8420 mmGalvanized pipe 2 ½ ” x 925 mmGalvanized pipe ½ ” x 925 mm
LV Copper cable 4 core 195 mm2 (m) output
Connector compresion terminal lug 95 mm2Connector compresion connector 95 mm2
Connector compression connector # 4-16 mm2
KETENTUAN TEKNIS :
1. Kedalaman penanaman kabel +/- 80 cm.2. Kabel keluar untuk penerangan jalan dimasukkan dalam satu pipa kabel keluar JTR.3. Kabel harus ditimbun dengan tanah halus dan pasir di sekeliling kabel.4. Bodi LVBC dan pipa pelindung kabel harus diketanahkan / digrounding.
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PERALATAN M8 - A2
KABEL SEC. MASUK DAN KELUAR 2JURUSAN UNTUK GARDU DISTRIBUSI 2 POLE
50 - 200KVA 3PH 4 KAWAT 220 / 380 V
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PERALATAN
RINCIAN MATERIAL
M8 - A2
M A T E R I A LKODE JUMLAH
2Steel channel C NP 4 x 750 mm42
Pole band single rack
4Beugels beves gasp 8 ½ x 2 ½”
4Bolt machine ½” x 0”C2Galvanized pipe 2 1/2” x 7843 mmgc11gc22116Shock galvanized pipe 2 ½” 3Shockgalvanized pipe 3”411Bow galvanized pipe 3”
2,5Ground wire 50 mm215,5LV Copper cable 4 core 185 mm2 (m) input308Connector compresion connector #3-95 mm24
Knee galvanized pipe 2 ½” Knee galvanized ppe 3”
ch
1A1B2A2Bbw
gc3gc4gc5
P
PP
8
Saluran PJ bila diperlukanLV copper cable 4 core 16 mm2 (m)
2Connector compression terminal 18 mm2 P30
4P
Galvanized pipe 3” x 5355 mmGalvanized pipe 2 ½ ” x 855 mmGalvanized pipe 3 ” x 803 mmGalvanized pipe ½ ” x 885 mm
LV Copper cable 4 core 95 mm2 (m) output
Connector compresion terminal lug 185 mm2Connector compresion terminal lug 185 mm2
Connector compression connector # 4-16 mm2
Beugels beves gasp 10 x 2 ½” 2Beugels beves gasp 10 x 3”
KETENTUAN TEKNIS :
1. Kedalaman penanaman kabel +/- 80 cm.2. Kabel keluar untuk penerangan jalan dimasukkan dalam satu pipa kabel keluar JTR.3. Kabel harus ditimbun dengan tanah halus dan pasir di sekeliling kabel.4. Bodi LVBC dan pipa pelindung kabel harus diketanahkan / digrounding.
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PERALATAN M8 - B1
KABEL SEC. MASUK DAN KELUAR 4JURUSAN UNTUK GARDU DISTRIBUSI 1 TIANG
50 - 200KVA 3PH 4 KAWAT 220 / 380 V
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PERALATAN
RINCIAN MATERIAL
M8 - B1
M A T E R I A LKODE JUMLAH
2Steel channel C NP 4 x 750 mm13Pole band single rack1Pole band double rackvb12Bolt machine ½” x 0”C2C1Galvanized pipe 3” x 6600 mmgc21gc42116Shock galvanized pipe 2 ½” 3Shockgalvanized pipe 3”411Bow galvanized pipe 3”
2,5Ground wire 50 mm2195LV Copper cable 4 core 103 mm2 (m) input304Connector compresion terminal lug 105 mm23
Knee galvanized pipe 2 ½” Knee galvanized ppe 3”
chchva
Sh1Sh2Kn1Kn2bw
gc1gc3gc5
CjCp1
P
Cp2PP
4
5Strap u/ kabel TRSaluran PJ bila diperlukanLV copper cable 4 core 16 mm2 (m)
2Connector compression terminal P
Sp
30
2P
Steel channel C NP 4 x 528 mm
Bolt machine ½” x 1 ½ ”
Galvanized pipe 3” x 925 mmGalvanized pipe 2 ½ ” x 8420 mmGalvanized pipe 2 ½ ” x 925 mmGalvanized pipe ½ ” x 925 mm
LV Copper cable 4 core 195 mm2 (m) output
Connector compresion terminal lug 95 mm2Connector compresion connector 95 mm2
Connector compression connector # 4-16 mm2
KETENTUAN TEKNIS :
1. Kedalaman penanaman kabel +/- 80 cm.2. Kabel keluar untuk penerangan jalan dimasukkan dalam satu pipa kabel keluar JTR.3. Kabel harus ditimbun dengan tanah halus dan pasir di sekeliling kabel.4. Bodi LVBC dan pipa pelindung kabel harus diketanahkan / digrounding.
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PERALATAN M8 - B2
KABEL SEC. MASUK DAN KELUAR 4JURUSAN UNTUK GARDU DISTRIBUSI 2 POLE
50 - 200KVA 3PH 4 KAWAT 220 / 380 V
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PERALATAN
RINCIAN MATERIAL
M8 - B2
M A T E R I A LKODE JUMLAH
2Steel channel C NP 4 x 3000 mm1210Pole band single rack24Bolt machine ½” x 6”C4C
1Galvanized pipe 3” x 6600 mmgc21gc444116Shock galvanized pipe 2 ½” 3Shockgalvanized pipe 3”161Bow galvanized pipe 3”
2,5Ground wire 50 mm215,5LV Copper cable 4 core 185 mm2 (m) input604Connector compresion terminal lug 185 mm216
Knee galvanized pipe 3” Knee galvanized ppe 2 ½ ”
chchva
ShShKnKnbw
gc1gc3gc5
Cj
P
PP
16
5Strap u/ kabel TRSaluran PJ bila diperlukanLV copper cable 4 core 16 mm2 (m)
4Connector compression terminal P
4
60
4P
Steel channel C NP 4 x 550 mm
Bolt machine ½” x 1 ½ ”
Galvanized pipe 3” x 925 mmGalvanized pipe 2 ½ ” x 8850 mmGalvanized pipe 2 ½ ” x 925 mmGalvanized pipe ½ ” x 925 mm
LV Copper cable 4 core 95 mm2 (m) output
Connector compresion terminal lug 95 mm2Connector compresion connector #3/0/95 mm2
Connector compression connector # 4-16 mm2
KETENTUAN TEKNIS :
1. Kedalaman penanaman kabel +/- 80 cm.2. Kabel keluar untuk penerangan jalan dimasukkan dalam satu pipa kabel keluar JTR.3. Kabel harus ditimbun dengan tanah halus dan pasir di sekeliling kabel.4. Bodi LVBC dan pipa pelindung kabel harus diketanahkan / digrounding.
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
GROUNDING M2-11
GROUNDING ASSEMBLY - GROUND ROD TYPE
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
SM2-11
GROUNDING ASSEMBLY - GROUND ROD TYPESTEEL POLE
GROUNDING
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
CM2-15
GROUNDING ASSEMBLY - PLATFORM TYPEFOR SECTIONALIZING AIR BREAK SWITCH
GROUNDING
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PENGAMAN M3-1A, M3-4
14.4 / 24.9 KV, 1 PHONE SECTIONALIZING FUSE CUTOUT
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
SM3-1A, SM3-4
14.4 / 24.9 KV, 1 PHONE SECTIONALIZING FUSE CUTOUT
PENGAMAN
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
CM3-16
14.4 / 24.9 KV, PRIMARY, 3 PH, 4 WIRE STARSECTIONALIZING AIR BRAKE SWITCH
GROUP OPERATED
PENGAMAN
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
NEW PRODUC ABSW = LOAD BREAK SWITCH INCLUDE STEEL X’ ARM & BRAKET
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PERALATAN
PEMASANGAN ABSW
CM 3-16
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
rood ground 5/8 x 2500with clamp
flexiblecable ground
p
elbow pipe
KS
cco
main contact
insulator LBS
pipe 1 3/8 dia
upper universal joint
M A T E R I A L JMLNO
1
2
12
6
Oval eye bolt 5/8 x 10 1
Dead end clamp primary
Suspension insulator
3
4
Oval eye nut 5/8 6
Steel brace 60”
6
Jumper kawat 9 m
Compression connector
3
Pole band double rack 7 ½ 4
Bolt double arming 5/8 x 12”
5
4
6
7
8
9
10
11
12
13
14
Steel cross arm 2500
Kabel shoes 2 mata
Flexible kabel ground for handle load brake
Load brake switch set
CM2-15 set (see unit CM2-15 drawing)
6
2
1
dougaphinteruptor
blade
main universal joint
loweruniversal joint
handlefor LBS
galvanize graetz
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PERALATAN
PEMASANGAN ABSW PADAD SIRKUIT ATAS
SM / CM 3-16A
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PERALATAN
PEMASANGAN ABSW PADAD SIRKUIT ATAS
SM / CM 3-16A
M A T E R I A LKODE JUMLAH
- Bolt Machine 5/8” x Req'd length
12
2 Cross Arm Steel 3000 Galvanis
6 Strain Clamp
6 Snackle anchor
2
2 Deadend assembly neutral
2
6
12
2
6 Insulator suspension 10”
3 Bolt double arming ?" x req'd length
3
2
12 Locknuts as required
6 Kabel Shoes 240 AL/CU
Switch lood break, 3 pole unit 35 KV With operating mehanisme
Pole band double rack type 7 1/2”
Washer Square 2 ¼", 2 ¼, 13/16" hole
Brace Steel 770”
Nut eye 35 5/8”
Line Live Conector 240
Moer Baut 1 1/2" x Req'd length
Bolt machine ½" x req'd length
KETENTUAN TEKNIS :
- Pemasangan pada JTM 3 Ph Doble Sirkuit Posisi ABSW Diatas.
- Satu tiang hanya dapat dipasang 1 unit ABSW.
- Untuk operasi normal kontak tetap pada sisi sumber dan kontak gerak pada sisi beban.
KONTRUKSI ABSW PADA DOUBLE SIRKUIT ATAS
3 Dou Gap
1 Pipa Galvanis 1 1/2" x 3 m
1
1 Pipa Galvanis 3/4" x 3 m
4 SM 2-11 ( Ground dengan bc 50 m )
Pipa Galvanis 1 1/2" x 6 m
1 Keset Pengaman
1 Beugel Kolong
c
d
g
l
bc
cu
cc
aa
p
c
c
k
n
vb
ek
vb
3 Kopel Pipa Galvanis
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PERALATAN
PEMASANGAN ABSW PADAD SIRKUIT BAWAH
SM / CM 3-16B
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PERALATAN
PEMASANGAN ABSW PADAD SIRKUIT BAWAH
SM / CM 3-16B
M A T E R I A LKODE JUMLAH
- Bolt Machine 5/8” x Req'd length
12
2 Cross Arm Steel 3000 Galvanis
6 Strain Clamp
6 Snackle anchor
2
2 Deadend assembly neutral
2
6
12
2
6 Insulator suspension 10”
3 Bolt double arming ?" x req'd length
3
2
12 Locknuts as required
6 Kabel Shoes 240 AL/CU
Switch lood break, 3 pole unit 35 KV With operating mehanisme
Pole band double rack type 7 1/2”
Washer Square 2 ¼", 2 ¼, 13/16" hole
Brace Steel 770”
Nut eye 35 5/8”
Line Live Conector 240
Moer Baut 1 1/2" x Req'd length
Bolt machine ½" x req'd length
KETENTUAN TEKNIS :
- Pemasangan pada JTM 3 Ph Doble Sirkuit Posisi ABSW Dibawah.
- Satu tiang hanya dapat dipasang 1 unit ABSW.
- Untuk operasi normal kontak tetap pada sisi sumber dan kontak gerak pada sisi beban.
KONTRUKSI ABSW PADA DOUBLE SIRKUIT BAWAH
3 Dou Gap
1 Pipa Galvanis 1 1/2" x 3 m
1
1 Pipa Galvanis 3/4" x 3 m
4 SM 2-11 ( Ground dengan bc 50 m )
Pipa Galvanis 1 1/2" x 6 m
1 Keset Pengaman
1 Beugel Kolong
c
d
g
l
bc
cu
cc
aa
p
c
c
k
n
vb
ek
vb
3 Kopel Pipa Galvanis
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PENGAMAN
LOAD BREAK SWITCH (LBS)KONSTRUKSI GANTUNG
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
SM / CM 3-16G
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PENGAMAN
LOAD BREAK SWITCH (LBS)KONSTRUKSI GANTUNG
M A T E R I A LKODE JUMLAH
2 Cross Arm Steel 3000 ( UNSP 10 ) Galvanis
4
6 Suspension Insulator ( set )
6 Scakle
6 Strain Clamp
3
1 Isolator Long Shenk
1
2
4
6
2 Bracket untuk Frame LBS
2 Besi Chanal NP 10 x 2500 ( Bentuk siku )
1
1
6 Pipa Galvanis 1" ( meter )
2 Besi Chanal NP 8 x 1000 untuk Box Kontrol
Besi Chanal NP 10 x 1500 ( Bentuk siku )
LBS Lengkap dengan Box control ( set )
Steel Brace 770 mm
Bolt Double Arming 5/8" x 20
Cross Arm Steel 2000 ( UNSP 10 ) Galvanis
Pole Band Double Rack 7 1/2”
Bolt Cariage 5/8" x Req'd length
Arester 18 KV ( bh )
KETENTUAN TEKNIS :
- Konstruksi LBS Model Gantung dengan 6 buah Arrester 18 KV pada posisi yang tepat.
- Sebagai Pengaman Peralatan
LOAD BREAK SWITCH ( LBS ) KONTRUKSI GANTUNG
2 Pole Band Double Rack 9 1/2”
1 SM 2-11 ( Ground lengkap dengan BC 50 mm )
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
SM / CM 3-16G
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PERALATAN
FAULT INDIKATOR
M5 - 50
M A T E R I A LJMLKODE
1 Fault indikator
STN
buahfi
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PERALATAN
DISCONECTING SWITCH
M5 - 51
M A T E R I A LJMLKODE
1 Disconecting Switch 600 A
STN
buahds
2 Jumper wirebuahaq
2 Sepatu kabelbuahsp
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PERALATAN
ARCHING HORN
M5 - 52
M A T E R I A LJMLKODE
3 Arching horn
STN
buahach
5 Ground wire 50 mm2meterai
3 Kabel skun 50 mm2buah-
1 CM 2 - 11unit-
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
M3-20
14.4 / 24.9 KV, 3 PHOIL CIRCUIT RECLOSER
PENGAMAN
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
M3-20-A
14.4 / 24.9 KV, 3 PHOIL CIRCUIT RECLOSER
PENGAMAN
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
M3-20-A
14.4 / 24.9 KV, 3 PHOIL CIRCUIT RECLOSER
PENGAMAN
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
M3-20-A
14.4 / 24.9 KV, 3 PHOIL CIRCUIT RECLOSER
PENGAMAN
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
M3-20-A
14.4 / 24.9 KV, 3 PHOIL CIRCUIT RECLOSER
PENGAMAN
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
M3-23
14.4 / 24.9 KVONE SECTIONALIZING OIL CIRCUIT RECLOSER
WITH BY-PASS SWITCH
PENGAMAN
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
JTM M7-1
14.4 / 24.9 KVONE STEP VOLTAGE REGULATOR
PLATFORM MOUNTED
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PERALATAN
REGULATOR
M7 - 3
M A T E R I A LJMLKODE M A T E R I A LJMLKODE
g
g
2
12
Regulator by pass switch
4
Brace steel 660
Brace steel 550
Regulator step type3
cuCross arm steel 1500
Cross arm steel 2000
STN STN
sk
cu
sc
4
3
bh
bh
bh
bh
bh
unt
10
Bolt machine ½” x 5” as req’d
6 Jumper as req’d
By pass arrester24
brPole band single rack
aq
c 12
Bolt machine ½” x req’d length
Bolt eye 5/8 x req’d length
12
pBolt machine 3/8” x req’d length
c
bh
bh
g 4
Bolt machine 3/4” x req’d length
3 Arrester 18 kV
Connector as req’d6
aeCross arm steel 3000
c ae 3
bh
bh
6
Isolator suspension
2 Dead end assembly neutral
Kabel skun AI/Cu 240 mm26
ccDead end assembly primary
k bu 6
set
set
unt
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PENGAMAN
RECLOSER 3 ø 20KV KONSTRUKSI1 TIANG DENGAN 1 PMS
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
SM 3-21
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PENGAMAN
RECLOSER 3 ø 20KV KONSTRUKSI1 TIANG DENGAN 1 PMS
M A T E R I A LKODE JUMLAH
3 Disconecting Switch
1
1 Recloser ( unit ) dengan control panel
1 Bracket Recloser ( unit )
2 Besi Chanal NP 8 x 1 m
2
2 Steel Brace 550 mm
2
2
2
4
3 Bolt Double Arming 5/8" x 20
12 Washer Square
6
18
6 Jumper ( Set ) 240
6 Pipa Galvanis 1”
Luq Nut
Sepatu Kabel AL/CU 240 mm
PT 20000 IV3 / 100 IV3 V u/power
Besi siku NP 8 x 1 m
Pole Band Double Rack 7 1/2”
Pole Band Double Rack 8 1/2”
Cross Arm Steel 3000
Steel Brace 770 mm
KETENTUAN TEKNIS :
- Pemasangan Recloser dengan 3 Disconecting Switch dan dengan Arester 6 buah pada posisi yang tepat.
- Sebagai Pengaman Peralatan terhadap Surja Petir.
RECLOSER 3 PHASA 20 KV KONSTRUKSI 1 TIANG 1 PMS
1 Tutup T atap 1”
2 Pole Band Double Rack 9 1/2”
1
6 Line live conector 240 mm
3 Sepatu Kabel AL/CU 70 mm
SM 2-11 ( Ground dengan BC 50 mm )
4 Sepatu Kabel AL/CU 25 mm
6 Arester
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
SM 3-21
Neutral position
LOAD SOURCE
LBS
RECLOSER
LBS
DS
Ar
RECLOSER
Neutralposition
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
AR
DS
RECLOSER 3 ø 20KV KONSTRUKSI1 TIANG DENGAN 1 PMS + LBS
PENGAMAN SM 3-21 L
Neutral position
RECLOSER
DS
Ar
RECLOSER
Neutralposition
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
AR
DS
RECLOSER 3 ø 20KV KONSTRUKSI1 TIANG DENGAN 1 PMS + LBS
PENGAMAN SM 3-21 L
M A T E R I A LJMLNO M A T E R I A LJML
1
2
12
6
Cross arm steel 2500
1
Pole band double rack 8 ½
Recloser
Lighting arrester 11 ½ kv2
11Dead end clamp primary
Suspension insulator
3
10
12
4
3
3
Steel brace 28 ”t
Ground wire #6
Ground rod 5/8 x 2 m 4
15Disconnecting switch
16
2
Pole band double rack 7 ½
Ground rod clamp
Load break switch if needed (M3-16)6
17Steel brace 28 ”
2
Double arming bolt 5/8 x 12 ”
6 Kabel shoes
Compression connector3
13Cross arm steel 1500
5 14 18
4
6
7
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
PENGAMAN
NO
8
9 18
MATERIAL
4
1
1
1
RECLOSER 3 ø 20KV KONSTRUKSI1 TIANG DENGAN 1 PMS + LBS
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PENGAMAN
RECLOSER 3 ø 20KV KONSTRUKSI1 TIANG DENGAN 3 PMS
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
DESCRIPTION PARAF DATA
Checked
Approped
Checked
Approped
Checked
Approped
PENGAMAN
RECLOSER 3 ø 20KV KONSTRUKSI1 TIANG DENGAN 3 PMS
M A T E R I A LJMLKODE M A T E R I A LJMLKODE
- Bolt machine 5/8 x req’d length 6 Disconecting Switch
12 Washer Square 2 ¼", 2 ¼, 13/16" hole 1 PT 20000 IV3 / 100 IV3 V u/power
Cross Arm Steel 3000 Galvanis Recloser ( unit ) dengan control panel
6 Strain Clamp 1 Bracket Recloser ( unit )
Snackle anchor Besi Chanal NP 8 x 1 m
2 1
6 2
2 Brace Steel 770” 2 Besi siku NP 8 x 1 m
2 Deadend assembly neutral 2 Steel Brace 550 mm
Nut eye 35 5/8” Pole Band Double Rack 7 1/2”
6 Line Live Conector 240 2 Pole Band Double Rack 8 1/2”
Moer Baut 1 1/2" x Req'd length Cross Arm Steel 3000
2 2
12 2
2 Bolt machine ½" x req'd length 4 Steel Brace 770 mm
6 Insulator suspension 10” 3 Bolt Double Arming 5/8" x 20
Bolt double arming 5/8” x req'd length Washer Square
3 Switch lood break, 3 pole unit 35 KV - 6 Luq Nut
with operating mehanisme Sepatu Kabel AL/CU 240 mm
3 12
18
2 Pole band double rack type 7 1/2” 6 Jumper ( Set ) 240
12 Locknuts as required 6 Pipa Galvanis 1”
Kabel Shoes 240 AL/CU Tutup T atap 1
3 Dou Gap 2 Pole Band Double Rack 9 1/2”
Pipa Galvanis 1 1/2" x 3 m SM 2-11 ( Ground dengan BC 50 mm )
6 1
1 1
Pipa Galvanis 1 1/2" x 6 m Line live conector 240 mm
1 Pipa Galvanis 3/4" x 3 m 3 Sepatu Kabel AL/CU 70 mm
SM 2-11 ( Ground dengan bc 50 m ) Sepatu Kabel AL/CU 25 mm
1 6
4 4
1 Keset Pengaman 3 Arrester
1 Beugel Kolong
Kopel Pipa Galvanis3
KETENTUAN TEKNIS :
- Pemasangan Recloser dengan Bay Pass ABSW dengan Arester 3 buah Posisi tidak tepat.
- Sebagai Pengaman Peralatan terhadap Surja Petir.
RECLOSER 1 TIANG DENGAN 3 PMS
PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA
top related