p74: a first view

Post on 01-Feb-2016

27 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

P74: a first view. VISAS - ODG. ESO Faculty meeting, 6 April 2004. Call and Proposal submission. No more PostScript, PDF only PDF: smaller & searchable. Totals P74. 806 proposals received for La Silla and Paranal 14 Large Programs (Paranal 13, La Silla 1) - PowerPoint PPT Presentation

TRANSCRIPT

VISAS -

ODG

P74:

a first view

ESO Faculty meeting, 6 April 2004

Call and Proposal submission

No more PostScript, PDF only PDF: smaller & searchable

Totals P74

806 proposals received for La Silla and Paranal

14 Large Programs (Paranal 13, La Silla 1)

2 submitted via email!

Proposal arrivals vs. Time (P74)

Days

3 0 0 3 0 0 1 1 0 0 0 2 0 0 0 1 1 2 0 0 0 2 1 5 11 186 4

32

75

269

359

0

50

100

150

200

250

300

350

400

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Nu

mber

Proposal arrivals vs. Time (P74)

Days

Nu

mber

1

10

100

1000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Country distribution (P74)

54% Fellows + students

Paranal vs. La Silla

0

100

200

300

400

500

600

700

P63 P64 P65 P66 P67 P68 P69 P70 P71 P72 P73 P74

Nu

mber

Scientific areas (P74)N

um

ber

0

50

100

150

200

250

A B C D

LS

LSLSLS

P PPP

Optimizing the community: the VLT sky

Optimizing the community: the VLT sky

Optimizing the community: the VLT sky

Optimizing the community: the VLT sky

Total Available vs. Total Requested

“Available” in this presentation means always 182 nights!

Predicting trouble: UT1

Real life P74: UT1

For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)

Predicting trouble: UT2

Real life P74: UT2

For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)

Predicting trouble: UT3

Real life P74: UT3

For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)

Real life P74: UT3 DARK TIME

For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)

~18 times available time!!

Predicting trouble: UT4

Real life P74: UT4

For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)

Real life 3.6: P74

For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)

Real life NTT: P74

For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)

Real life 2.2: P74

For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)

Real life 2.2: P74 DARK TIME

For real pressure multiply by ~2 (technical time + ongoing LPs + carryovers)

MP

IA ti

me

Telescope time allocation

The communityN

umbe

r of

pro

posa

ls

1977 Now

3.6 m

1.5 Dan0.9 Dut

1.4 Cat

2.2 m

SESTNTT

UT1UT2UT3

UT4

TaToo, the scheduler

TaToo, the scheduler

TaToo, the scheduler

TaToo, the scheduler

top related