oxebridge q001 - iso9001:2015 · oxebridge q001 ver. 0.3– draft a user-friendly remix of iso...
Post on 31-Aug-2020
2 Views
Preview:
TRANSCRIPT
Oxebridge Q001 Quality Management System Requirements Ver. 0.3 DRAFT – NOT A FINAL VERSION
A user-friendly, open source remix of ISO 9001:2015.
© 2020 Oxebridge Quality Resources International LLC. All rights reserved.
For the latest edition, check www.oxebridge.com
THIS IS A DRAFT DOCUMENT
If you’d like to provide
feedback on it, submit your
comments to Christopher
Paris via email to
OQR@oxebridge.com .
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 2 of 25
Table of Contents
1.0 Scope ............................................................................................................................................................................................................................................4 2.0 Normative References .................................................................................................................................................................................................................4 3.0 Terms and Definitions ..................................................................................................................................................................................................................4 4.0 Context of the Organization.........................................................................................................................................................................................................5
4.1 Identifying Stakeholders .........................................................................................................................................................................................................5 4.2 Identifying Stakeholders’ Concerns and Requirements .........................................................................................................................................................5 4.3 Quality Management System Scope ......................................................................................................................................................................................5 4.4 Quality Management System Processes ................................................................................................................................................................................5
5.0 Leadership ....................................................................................................................................................................................................................................6 5.1 Management Commitment ....................................................................................................................................................................................................6 5.1.2 Quality Culture & Customer Focus ......................................................................................................................................................................................6 5.2 Policy .......................................................................................................................................................................................................................................6 5.3 Organizational Roles Responsibilities and Authorities ...........................................................................................................................................................6
6.0 Quality Management System Planning........................................................................................................................................................................................7 6.1 Risk and Opportunity Management .......................................................................................................................................................................................7 6.1.1 Approach to Risk and Opportunity Management ...............................................................................................................................................................7 6.1.2 Risk Management ................................................................................................................................................................................................................7 6.1.3 Opportunity Management ..................................................................................................................................................................................................7 6.2 Change Management .............................................................................................................................................................................................................8
7.0 Support.........................................................................................................................................................................................................................................8 7.1 Resources ................................................................................................................................................................................................................................8 7.1.1 Resource Provision ..............................................................................................................................................................................................................8 7.1.2 People ..................................................................................................................................................................................................................................8 7.1.3 Infrastructure.......................................................................................................................................................................................................................8 7.1.4 Work Environment ..............................................................................................................................................................................................................9 7.1.5 Inspection and Testing Resources .......................................................................................................................................................................................9 7.1.6 Knowledge Management ................................................................................................................................................................................................. 10 7.2 Competence & Training ....................................................................................................................................................................................................... 10 7.3 Awareness ........................................................................................................................................................................................................................... 10 7.4 Communication ................................................................................................................................................................................................................... 10 7.4.1 Internal Communication ................................................................................................................................................................................................... 10 7.4.2 External Communication .................................................................................................................................................................................................. 11 7.5 Documents and Records ...................................................................................................................................................................................................... 11 7.5.1 Development of Documents and Records ....................................................................................................................................................................... 11 7.5.2 Control of Documents ...................................................................................................................................................................................................... 11 7.5.2 Control of Records ............................................................................................................................................................................................................ 11 7.5.3 Implementation of Documents and Records ................................................................................................................................................................... 12
8.0 Operation .................................................................................................................................................................................................................................. 12 8.1 Operational Planning and Control ....................................................................................................................................................................................... 12 8.1.1 Operational Process Planning........................................................................................................................................................................................... 12 8.1.2 Operational Process Control ............................................................................................................................................................................................ 12 8.2 Capture and Review of Requirements................................................................................................................................................................................. 12 8.2.1 Capture of Requirements ................................................................................................................................................................................................. 12 8.2.2 Review of Requirements .................................................................................................................................................................................................. 13 8.2.3 Changes to Requirements ................................................................................................................................................................................................ 13 8.3 Design and Development .................................................................................................................................................................................................... 13 8.3.1 Design and Development Approach ................................................................................................................................................................................. 13 8.3.2 Design and Development Planning .................................................................................................................................................................................. 13 8.3.3 Design and Development Requirements.......................................................................................................................................................................... 14 8.3.4 Designs .............................................................................................................................................................................................................................. 14 8.3.4 Design and Development Reviews ................................................................................................................................................................................... 15 8.3.5 Design and Development Verification .............................................................................................................................................................................. 15 8.3.6 Design and Development Validation ................................................................................................................................................................................ 15 8.3.7 Design and Development Changes ................................................................................................................................................................................... 15 8.4 Purchasing and Subcontracting ........................................................................................................................................................................................... 15 8.4.1 Initial Evaluation and Approval of Suppliers .................................................................................................................................................................... 15 8.4.2 Purchasing ........................................................................................................................................................................................................................ 16 8.4.3 Subcontracting .................................................................................................................................................................................................................. 16 8.4.4 Ongoing Evaluation of Suppliers ...................................................................................................................................................................................... 16 8.5 Production and Service Provision ........................................................................................................................................................................................ 16 8.5.1 Control of Production and Service Provision.................................................................................................................................................................... 16 8.5.2 Product Identification and Traceability ............................................................................................................................................................................ 17 8.5.3 Property Belonging to Third Parties ................................................................................................................................................................................. 17
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 3 of 25
8.5.4 Preservation...................................................................................................................................................................................................................... 17 8.5.6 Delivery ............................................................................................................................................................................................................................. 18 8.5.7 Post-Delivery Activities ..................................................................................................................................................................................................... 18 8.6 Inspection and Testing......................................................................................................................................................................................................... 18 8.7 Control of Nonconforming Product ..................................................................................................................................................................................... 18 8.7.1 Discovering and Recording Nonconforming Product ....................................................................................................................................................... 18 8.7.2 Dispositioning Nonconforming Product ........................................................................................................................................................................... 19
9.0 Performance Evaluation............................................................................................................................................................................................................ 19 9.1 Monitoring, Measurement, Analysis and Evaluation .......................................................................................................................................................... 19 9.1.1 Overall QMS Evaluation .................................................................................................................................................................................................... 19 9.1.2 Analysis and Evaluation .................................................................................................................................................................................................... 19 9.2 Internal Audits ..................................................................................................................................................................................................................... 19 9.2.1 Purpose of Internal Audits ................................................................................................................................................................................................ 19 9.2.2 Conducting Internal Audits ............................................................................................................................................................................................... 20 9.2.3 Internal Audit Findings ..................................................................................................................................................................................................... 20 9.3 Management Review ........................................................................................................................................................................................................... 20 9.3.1 Management Review Approach ....................................................................................................................................................................................... 20 9.3.2 Management Review Topics ............................................................................................................................................................................................ 20
10.0 Improvement .......................................................................................................................................................................................................................... 21 10.1 General .............................................................................................................................................................................................................................. 21 10.2 Corrective Action ............................................................................................................................................................................................................... 21 10.2.1 Requesting Corrective Action ......................................................................................................................................................................................... 21 10.2.2 Processing Corrective Action Requests .......................................................................................................................................................................... 21 10.3 Preventive Action .............................................................................................................................................................................................................. 22 10.2.1 Requesting Preventive Action ........................................................................................................................................................................................ 22 10.2.2 Processing Preventive Action Requests ......................................................................................................................................................................... 22
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 4 of 25
1.0 Scope
The Oxebridge Q001 (pronounced “Q thousand and one”) standard is intended to be used by organizations
seeking to implement a formal, documented quality management system that complies with ISO 9001 Quality
Management Systems – Requirements. Each organization will have its own rationale for doing so, including to
meet customer requirements or to develop a quality system that allows for continual improvement; this standard
is agnostic on such reasons, and attempts to satisfy all users, regardless of their rationale.
The Oxebridge Q001 standard was developed to provide an entirely alternate wording of the ISO 9001 standard
to:
a) improve comprehension of the requirements;
b) reduce repetition of requirements;
c) clarify commonly misunderstood requirements;
d) add key requirements into the standard, such as risk management, opportunity management, and
preventive action management;
e) improve sub-clause numbering and structure;
f) improve – somewhat – the ability of service providers to utilize the standard;
g) simplify internal and external auditing against the standard.
The Oxebridge Q001 standard adopts the majority of ISO 9001’s clause number structure, with minor changes. It
utilizes none of the original ISO 9001 language, and is therefore clear of any copyright or trademark infringement
claims.
Compliance to Oxebridge Q001 should result in near-total compliance to ISO 9001:2015. Appendix A provides a
crosswalk table which identifies potential gaps which will need to be closed to ensure the resulting system fully
complies with ISO 9001. Readers will have to purchase a licensed copy of ISO 9001:2015 in order to ensure
compliance; go to www.iso.ch to buy the official standard.
Where “Notes” are indicated, these do not include requirements, but instead provide clarifying language
intended to help the reader. These have been kept to a minimum.
The Oxebridge Q001 standard is ©2020 Oxebridge Quality Resources International LLC, all rights reserved. Visit
www.oxebridge.com for more information.
2.0 Normative References
None.
3.0 Terms and Definitions
3.1 Uncertainty: a deficiency of information related to the understanding or knowledge of an event, its
consequence, or likelihood.
3.2 Risk: a negative effect of uncertainty.
3.3 Opportunity: a positive effect of uncertainty.
For other definitions, refer to ISO 9000:2015 Quality Management Systems – Fundamentals and Vocabulary
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 5 of 25
4.0 Context of the Organization
4.1 Identifying Stakeholders
The organization shall identify internal and external stakeholders who are affected by, or have an effect on, the
organization’s products, services and/or quality management system. The list of stakeholders shall be maintained
as a record.
External stakeholders shall include customers and suppliers at a minimum.
Internal stakeholders shall include to include employees and top management at a minimum.
NOTE: Additional stakeholders may include regulatory bodies, product end-users, distributors, subcontractors,
partners, owners, dealers, sales representatives, competitors, etc.
NOTE: “Top management” is typically a subset of “employees,” since top management will have additional
concerns and requirements under 4.2.
4.2 Identifying Stakeholders’ Concerns and Requirements
The organization shall identify the concerns and requirements of the stakeholders identified in 4.1.
The list of these concerns and requirements shall be maintained as a record.
NOTE: “Concerns” would be issues not deemed mandatory by the stakeholder, but nevertheless important;
“requirements” would be issues deemed mandatory by the stakeholder.
4.3 Quality Management System Scope
The organization shall document a scope statement that defines the locations, products, services and processes
to be included in the quality management system. This definition shall consider the stakeholders identified in 4.1
and their issues and requirements identified in 4.2.
The organization’s scope statement shall indicate a justification as to why any clause of this standard is to be
excluded or deemed not applicable. Clauses shall only be excluded or deemed not applicable when the
organization’s activities within the scope do not include any activities covered by the cited clause.
4.4 Quality Management System Processes
The organization shall implement a process approach to management of the quality system by:
a) identifying the processes within the scope of the quality management system;
b) determining necessary documentation to support the definition and operation of each process;
c) defining the owner(s) of the process, who will be responsible for the overall management and
subsequent performance reporting of the process;
d) establishing documented process objectives which will define the intended purpose and expectations of
the process;
e) establishing measurable metrics which, when measured, will determine the effectiveness of the process
in meeting the process objectives;
f) measuring the process through the gathering of data related to the process objectives and metrics;
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 6 of 25
g) establishing or adjusting goals for each process metric; and
h) taking action when a process does not meet its goal.
NOTE: Actions for processes that do not meet their goals could include corrective action (see 10.2) or adjustment
of the goal.
Outsourced processes shall be performed by approved suppliers per the requirements of 8.4. In addition, the
organization shall implement controls for each outsourced process which shall ensure requirements are fully met;
these controls shall be defined in a documented procedure.
5.0 Leadership
5.1 Management Commitment
Top management shall demonstrate its commitment to implementing and improving the quality management
system by:
a) documenting how it takes accountability for the effectiveness of the quality management system;
b) providing evidence of participation in quality system planning activities;
c) signing the quality policy;
d) providing evidence of participation in management reviews (see 9.3);
e) reviewing and analyzing cost of quality data (see 9.1.2); and
f) managing, leading and supporting subordinate staff.
5.1.2 Quality Culture & Customer Focus
Top management shall adopt and implement a culture of quality that focuses on satisfying the customer’s
requirements. The definition of this culture and the plan its implementation shall be documented.
5.2 Policy
Top management shall develop, document and publish a quality policy that:
a) summarizes the company’s culture of quality;
b) is easily understood; and
c) is relevant to the organization and its products or services.
5.3 Organizational Roles Responsibilities and Authorities
The organization shall define and document who shall be considered “top management” and thus subject to the
requirements of this standard that call out this role. The individuals assigned as “top management” shall include
the senior-most manager(s) responsible for the organization, giving consideration of the scope limitations
defined per 4.3.
Top management shall ensure that key responsibilities and authorities relative to the quality management system
are defined and documented. At a minimum, such key responsibilities and authorities will include:
a) who are the owners of each quality management system process;
b) who is responsible for collecting performance data and reporting it to top management; and
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 7 of 25
c) who will act as point of contact or liaison for third parties when representing the quality management
system.
NOTE: Responsibilities and authorities may be documented within procedures.
6.0 Quality Management System Planning
6.1 Risk and Opportunity Management
6.1.1 Approach to Risk and Opportunity Management
The organization will determine its approach to managing risks and opportunities, and define this in a
documented procedure.
The organization shall use the issues identified in 4.2 and determine which of these issues presents a risk, which
of these issues presents an opportunity, or which of these issues presents both a risk and opportunity.
6.1.2 Risk Management
The organization shall identify risks including:
a) issues identified in 4.2 as being risks;
b) additional risks identified by management or staff at any time; and
c) risks that arise from discussions, data analysis or any other reason during operation of the quality
management system.
The organization shall develop a documented procedure defining how it manages risks. This procedure shall
define how risks are to be assessed, ranked, and mitigated when the risk is deemed beyond an acceptable
threshold. Risk mitigation shall aim to reduce the likelihood and/or severity of identified risks. Risk mitigation
plans shall be documented, implemented, and verified after completion.
NOTE 1: The procedure required by 6.1.1 may be used to document this requirement.
NOTE 2: The corrective action system defined in 10.2 may be used to manage risk mitigation plans.
6.1.3 Opportunity Management
The organization shall identify opportunities including:
a) issues identified in 4.2 as being opportunities;
b) additional opportunities identified by management or staff at any time; and
c) opportunities that arise from discussions, data analysis or any other reason during operation of the
quality management system.
The organization shall develop a documented procedure defining how it manages opportunities. This shall define
how opportunities are to be assessed, ranked, and pursued when the opportunity is deemed to reach an
acceptable threshold. The pursuit of opportunities shall aim to increase the likelihood and/or benefit of identified
opportunities. Opportunity pursuit plans shall be documented, implemented, and verified after completion.
NOTE 1: The procedure required by 6.1.1 may be used to document this requirement.
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 8 of 25
NOTE 2: The preventive action system defined in 10.3 may be used to manage opportunity pursuit plans.
6.2 Change Management
When the organization determines the need for changes to the quality management system, the changes shall be
carried out in accordance with a documented change management procedure. This procedure shall ensure that:
a) changes are formally requested;
b) changes undergo review and approval by appropriate management;
c) change plans are defined and implemented;
d) change plans include intended dates of execution or implementation, if appropriate;
e) once implemented, the change is evaluated to ensure it was effective and did not cause unexpected
nonconformities; and
f) any necessary documents or records are updated.
NOTE 1: Changes to the quality management system may include changes to processes, the scope of the quality
management system, products or services offered, or other major company changes.
NOTE 2: Changes to documents are covered by the document control requirements defined in 7.5.
NOTE 3: Change plans may be processed through a corrective action request (see 10.2) or preventive action
request (see 10.3.)
7.0 Support
7.1 Resources
7.1.1 Resource Provision
Top management shall promote a culture that allows the organization’s staff to feel free to request resources
related to the quality management system when they are needed. Top management shall give proper
consideration to such requests.
7.1.2 People
The organization shall determine and provide the persons necessary for the effective implementation of the
quality management system processes, and to ensure quality of products and services.
NOTE: “Persons” may include employees, contractors, staff, temporary help, etc.
7.1.3 Infrastructure
The organization shall determine, provide and maintain the infrastructure necessary for the quality management
system processes, and/or to ensure quality of products and services.
Infrastructure shall include, at a minimum:
a) buildings and facilities;
b) utilities;
c) equipment;
d) transportation resources; and
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 9 of 25
e) information technology (IT) resources.
For facilities and equipment, a preventive maintenance program shall be developed and defined in a documented
procedure. This program shall attempt to ensure equipment and facilities do not experience unplanned defects
or downtime. Records of preventive maintenance shall be maintained.
Equipment directly impacting on product quality shall be validated prior to use in accordance with a documented
procedure.
Tooling, jigs, fixtures and other support equipment shall be identified to distinguish them from product, where
such confusion is likely. Such items shall be identified as to the product their use is intended for, unless they are
intended for generic use.
7.1.4 Work Environment
The organization shall determine, provide and maintain the work environment necessary for the quality
management system processes, and/or ensure quality of products and services.
Controls for the work environment shall include controlling conditions that could cause process, product or
service nonconformities if not properly managed (i.e., temperature, heat, humidity, light, airflow, hygiene, noise).
7.1.5 Inspection and Testing Resources
Resources needed for the inspection or testing of products or services shall be determined and provided.
The organization shall ensure that these resources are suitable for the specific type of inspection and testing to
be performed (e.g., of sufficient accuracy, suitable tolerances).
Inspection and testing resources shall be calibrated or verified in accordance with a documented procedure. This
procedure shall include:
a) a definition of the calibration or verification frequency for each resource;
b) a definition of the calibration or verification method for each resource;
c) indication of who will perform the calibration or verification (e.g., the organization or an approved
supplier);
d) the records to be kept which provide evidence of the calibration or verification;
e) how such resources will be uniquely identified to trace back to calibration and verification records;
f) how such resources will be identified as to their current calibration or verification status, so that users
clearly understand when they are overdue;
g) how such resources are maintained to ensure ongoing proper functioning and capability; and
h) how such resources are safeguarded from adjustments, damage or deterioration that would invalidate
the calibration or verification.
Where the organization performs calibration of verification, the instructions for carrying out each type of
calibration or verification method shall be defined in documented procedures.
NOTE: procedures for individual calibration methods are not required if the organization outsources calibration
services.
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 10 of 25
Calibration shall be performed against traceable standards, so that there remains an unbroken chain of
calibrations through to international standards.
The organization shall record an impact study when a resource is reported as being defective, nonconforming or
otherwise out of tolerance. This study shall analyze the impact of the resources’ defect, whether or not any
product or services were negatively affected, and what actions are to be taken on delivered products or services,
up to and including a recall.
7.1.6 Knowledge Management
The organization shall determine the knowledge necessary for the quality management system processes, and/or
ensure the quality of products and services. This shall include information known by members of the
organization’s staff, which may not be documented. The organization shall implement methods to reduce the loss
of such knowledge when changes to staff occur.
NOTE: The set of quality management system documents and records may be used as the main source of
organizational knowledge.
7.2 Competence & Training
The organization shall have a documented procedure defining its training program. The training program shall
ensure the organization:
a) determines the necessary competence of staff in terms of minimum education, training, and experience;
b) ensures that persons assigned to positions and roles are competent on the basis of the defined minimum
requirements from (a) above; and
c) takes actions to train or otherwise increase competence when gaps are found.
Where a person is assigned a position and management elects to waive a specific competence requirement, the
justification to do so shall be recorded and maintained.
Training shall include any applicable quality management system documentation applicable to each position.
Records of training shall be maintained. Such records shall include training for initial orientation, subsequent on-
the-job training, and any other training performed by the organization.
7.3 Awareness
Training shall also include initial orientation and periodic re-training on:
a) the quality policy;
b) each person’s relative process quality objectives;
c) each person’s contribution to the effectiveness of the quality management system; and
d) how to report quality management system problems and nonconformities.
7.4 Communication
7.4.1 Internal Communication
The organization shall ensure that methods are made available to all staff allowing for communication in all
directions (i.e. management to staff, staff to management, staff to staff, between processes, etc.) Top
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 11 of 25
management shall ensure that no retaliation is taken against staff who report valid problems or nonconformities
related to the organization’s quality management system, products or services. Top management shall
periodically communicate the status and health of the quality management to staff, and invite suggestions or
opportunities for improvement.
7.4.2 External Communication
The organization shall ensure that external communication is effective. The organization shall ensure that
incoming communication from customers and suppliers is properly routed, responded to, and any issues
addressed as needed. This communication shall ensure that customer complaints are captured and processed per
the requirements of 10.2.
7.5 Documents and Records
7.5.1 Development of Documents and Records
The organization shall develop documents and records to support and the quality management system processes.
This shall include documented procedures and records required by this Standard, as well as any required by the
organization itself.
7.5.2 Control of Documents
The organization shall develop a documented procedure which defines how documents are:
a) drafted;
b) reviewed;
c) approved;
d) published; and
e) revised.
All quality system documents which instruct shall be subject to this procedure.
Such quality system documents shall be subject to revision control. Where feasible, revised documents shall have
a means of identifying the changes made to the document.
Obsolete documents retained for historical purposes shall be identified as such to ensure they are not used for
any other reason.
Documents of external origin shall be controlled to ensure the proper revision is obtained and used.
All documents shall be readily available where they are needed by staff.
7.5.2 Control of Records
The organization shall develop a documented procedure which defines how records are:
a) created;
b) filed;
c) preserved;
d) retained; and
e) disposed of.
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 12 of 25
The procedure shall define the minimum retention time for each record. Record retention shall comply with
quality system regulations, if applicable.
The procedure shall define methods of backup and data protection for electronic records, as well as preservation
methods for physical records.
The organization shall flow down to its suppliers any requirements for the storage of quality system records
retained by such suppliers; see 8.4.
7.5.3 Implementation of Documents and Records
The organization shall ensure that its employees and staff comply with the requirements of its quality
management system procedures and complete necessary quality system records as directed.
The organization’s employees and staff shall work to the latest revision of quality management system
procedures unless otherwise directed by specific work requirements.
8.0 Operation
8.1 Operational Planning and Control
8.1.1 Operational Process Planning
Before work commences, the organization shall review current activities and methods to ensure work can be
performed that meets all requirements. This review shall ensure that:
a) operational processes are included in the defined quality management system processes (see 4.4); and
b) operational process control is implemented (see 8.1.2).
NOTE: “Operational processes” are those processes directly responsible for the activities defined in Clause 8 of this
standard.
8.1.2 Operational Process Control
The organization shall control the operational processes by ensuring:
a) process owners determine necessary documents and records required to ensure process control, and
develop and implement them accordingly (see 7.5);
b) criteria for operational processes is tied to both process performance and product or service quality; and
c) when process measurement data shows the process is likely to deviate from goals or expectations, or has
already deviated, corrective action is taken (see 10.2).
8.2 Capture and Review of Requirements
8.2.1 Capture of Requirements
The organization shall ensure all applicable requirements are captured before a decision to accept work is
finalized. The capture of requirements shall be performed in accordance with a documented procedure.
The capture of customer requirements shall include:
a) requirements provided by the customer directly;
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 13 of 25
b) requirements not provided by the customer, but known to the organization as being applicable;
c) related statutory and regulatory requirements related to the product or service; and
d) information from any applicable prior work.
All such requirements shall be recorded prior to review.
8.2.2 Review of Requirements
The organization shall ensure all applicable requirements are reviewed before a decision to accept work is
finalized. The review of requirements shall be performed in accordance with a documented procedure.
The review of customer requirements shall ensure:
a) the company has the capability and capacity to perform the work;
b) the company can meet required quality levels or expectations; and
c) the company can satisfy any applicable statutory and regulatory requirements related to the product or
service.
If the organization cannot meet all requirements, it shall then either negotiate with the customer to develop a set
of requirements that the organization can meet, or decline the work altogether.
A record of the review of requirements shall be maintained, along with the final decision to accept or decline the
work.
If the organization provides a proposal or quotation for the work, it shall review any subsequent orders received
from the customer against the original proposal or quotation. If any deviations or differences are noted, the
organization shall resolve these with the customer before beginning work.
8.2.3 Changes to Requirements
The organization shall have a documented procedure that defines how it shall address changes to requirements
once work has begun. This shall address changes prompted by the customer as well as changes prompted by the
organization itself.
Records of changes to requirements shall be maintained.
8.3 Design and Development
8.3.1 Design and Development Approach
The organization shall define its approach to design activities in a documented procedure. This procedure shall
include a description of how the organization meets all the other requirements of clause 8.3. This shall address
the design and development of products at a minimum, but may be applied to the design of services as deemed
appropriate by the organization.
NOTE: “Design approaches” may include a particular design model, such as waterfall or agile.
8.3.2 Design and Development Planning
The organization shall develop and document one or more design plans.
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 14 of 25
NOTE: In some cases, the procedure required by 8.3.1 above constitute the design plan, and no further document
is required; in other cases, the organization may choose to develop separate design plans for different products or
customers.
The design plan shall define:
a) the design approach, if not already defined from the documentation in 8.3.1;
b) the required design and development verification and validation activities;
c) the responsibilities and authorities for the design activities;
d) the internal and external resources needed for the design activities;
e) any intended customer or third-party interactions for the design activities;
f) the requirements for subsequent manufacturing of the designed product or provision of the designed
services;
g) any procedures and records needed to demonstrate that the design work has been reviewed, verified,
validated and completed.
8.3.3 Design and Development Requirements
The organization shall determine the requirements for the intended product or service being designed. The
organization shall consider:
a) functional and performance requirements;
b) information derived from previous or similar designs;
c) applicable statutory and regulatory requirements; and
d) standards or codes of practice relevant to the design.
The requirements shall be clear, complete and unambiguous. Conflicting design requirements shall be resolved.
The design requirements shall be recorded.
8.3.4 Designs
The output of the design and development activity shall be formal, documented and approved designs. The
designs shall include, as appropriate:
a) adequate definition of the product or service with the intent of ensuring it can be manufactured or
delivered at a later date;
b) applicable acceptance criteria, including acceptable tolerances, to allow for subsequent inspection and
testing during production or service provision;
c) raw materials to be used, including any certification requirements for such materials;
d) identification of materials or services will be performed by outsourced process providers, along with the
intended suppliers if applicable; and
Designs shall be subject to revision control, and have evidence of review and approval.
NOTE 1: “designs” may include drawings, models, schematics, procedures, specifications, lists, software code, etc.,
as applicable to the product or service under design.
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 15 of 25
NOTE 2: for electronic design outputs, such as 3D models, the model itself is understood as sufficient
“documentation” provided all other requirements of clause 8.3.4 are met.
8.3.4 Design and Development Reviews
In addition to the review of designs discussed in 8.3.4, the organization shall arrange other design reviews as
appropriate for the chosen design approach (8.3.1) and design plan(s) (8.3.2).
When such additional reviews are performed records shall be maintained of the results of the review and any
actions to be taken, including design improvements or revisions. Design revision records shall include a brief
description of the nature of the changes made.
NOTE: such design reviews may include preliminary design reviews or critical design reviews, and may include
third parties such as the customer or regulatory bodies, as appropriate.
8.3.5 Design and Development Verification
Design verification shall be performed to ensure the design satisfactorily addresses all design requirements
before design validation (8.3.6) is conducted. Records of design verification shall be maintained.
NOTE: Design verification is typically a comparison of the design requirements against the resulting design itself; it
is therefore typically a review of documents, records or software code.
8.3.6 Design and Development Validation
Design validation shall be performed to ensure a product or service resulting from the design meets the design
requirements. Records of design validation shall be maintained.
NOTE: Design validation may be performed through measurement of a design prototype against the design
criteria, first piece or first article inspections of designed product, witnessing of the designed service through trial
runs, simulations, test runs, etc.
8.3.7 Design and Development Changes
Changes to designs shall be recorded, reviewed and approved prior to implementation. Designs shall have their
revision advanced to indicate the design change. Records of the nature of the changes and approvals shall be
maintained.
8.4 Purchasing and Subcontracting
8.4.1 Initial Evaluation and Approval of Suppliers
The organization shall evaluate and approve suppliers of materials, products and support services in accordance
with a documented procedure. This shall include any subcontractors used to support quality management system
activities. Records shall be maintained of approved suppliers and their scope of approval.
NOTE: “Scope of approval” should include what items, materials or services each supplier is approved to provide.
The level of detail for this can be determined by the organization. This can be satisfied by either maintaining a list
of suppliers and their approvals, or a list of items or services to be purchased and the applicable approved
suppliers for those items or services.
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 16 of 25
In all cases, the organization shall retain final responsibility for products or services provided by suppliers or
subcontractors.
8.4.2 Purchasing
The organization shall conduct purchasing of items and services in accordance with a documented procedure.
The organization shall only purchase items and services from suppliers who have been evaluated and approved.
Where the organization purchases test items or services in order to evaluate them, this temporary condition shall
be recorded.
The organization shall provide the supplier with a documented purchase request for the items or services to be
purchased. Such purchase requests shall include, at a minimum:
a) the items or services to be purchased;
b) any required delivery dates requested by the organization;
c) any applicable organizational requirements related to the item or service; and
d) any applicable statutory or regulatory requirements related to the item or service.
Records of purchases, including the purchase requests, shall be retained.
NOTE: The “purchase request” may take the form of a purchase order, contract, online order or other documented
request.
8.4.3 Subcontracting
The organization shall subcontract activities or services in accordance with a documented procedure.
The organization shall use contracts or other documents to define the required services to be provided by
subcontractors and outsourced process providers. Such contracts or documents shall clearly define any
applicable requirements, limitations, and scope of work.
8.4.4 Ongoing Evaluation of Suppliers
The organization shall perform ongoing evaluation of suppliers and subcontractors to monitor their performance,
in accordance with a documented procedure. The level of evaluation and control over each supplier shall be
determined by the organization based on the criticality of the supplier and/or the products or services provided
by that supplier. The organization shall advise the supplier when performance is found to be unacceptable, and
work to resolve the issue with the supplier or disqualify them from future purchasing consideration.
Records of supplier evaluation and actions taken shall be maintained.
8.5 Production and Service Provision
8.5.1 Control of Production and Service Provision
The organization shall provide production and service personnel with the appropriate controls to ensure work is
performed which meets requirements. Such controls shall include, as appropriate:
a) documentation which defines the work to be performed, product or service requirements, and inspection
and test criteria;
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 17 of 25
b) equipment required for the work, including inspection and testing devices;
c) suitable equipment and facilities;
d) description of copies of the records to be completed during work;
e) any specific training for the work;
f) tooling, devices or special methods to reduce human error.
Changes or revisions to work-specific instructions or documentation shall only be made by authorized personnel,
and subject to formal document change rules, per 7.5.2.
Where any special process work or activity cannot be verified by the organization through normal inspection or
testing, the organization shall implement additional controls, including as applicable:
a) additional training of personnel responsible;
b) validation of the equipment used;
c) additional inspection or testing methods; and
d) use of and reference to applicable industry standards or specifications.
8.5.2 Product Identification and Traceability
The organization shall identify product at all times to ensure it is not misplaced, commingled, or misidentified.
This shall include the status of inspection and testing, as appropriate. Product shall be identified so that it cannot
be mistaken for raw materials, tooling or equipment.
NOTE: Nonconforming product must be identified per the requirements of 8.7.
If individual product serialization, product traceability and/or batch identification is required by the nature of the
product or the customer, then the organization shall implement appropriate methods to ensure this. Where
serial or batch numbers are used, the organization shall ensure these are not duplicated. Records related to the
product shall include references to the individual product serial numbers or batch number for which they refer.
Product identification and traceability methods shall be performed in accordance with a documented procedure.
8.5.3 Property Belonging to Third Parties
The organization shall exercise care with property belonging to third parties, including customers or suppliers.
This shall include proper handling, identification, protection, and preservation at all times when the organization
has control over the property. This shall include both physical property and intellectual property, including third-
party data.
When third party property is lost, damaged, or compromised, the organization shall report this to the property’s
owner and retain records of the issue.
8.5.4 Preservation
The organization shall preserve product during production and service provision, to the extent necessary to
ensure quality. Preservation activities shall include handling, internal packaging, contamination control,
commingling control, internal storage, transmission or transportation, and protection.
Preservation activities shall be defined in a documented procedure.
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 18 of 25
8.5.6 Delivery
The organization shall deliver completed products or services in accordance with applicable requirements. These
requirements shall include:
a) customer’s preferred or required delivery method
b) required packaging
c) required documentation and/or records to accompany the product or service
8.5.7 Post-Delivery Activities
The organization shall define what post-delivery activities it is responsible for in related procedures or job
records, as appropriate. This shall include the controls for such post-delivery activities to ensure that the activities
are performed in accordance with all applicable requirements.
NOTE: Post-delivery activities can include warranty repair or reword, technical support services, maintenance
services, and supplementary services such as recycling or final disposal.
8.6 Inspection and Testing
The organization shall perform inspection and/or testing on products and services to ensure all requirements
have been met before final delivery or service conclusion. This shall include in-process inspections and/or tests
and final inspections and/or tests, as appropriate.
Work may not proceed until requires inspections and tests are completed, and the results show that the
requirements have been met. Where requirements have not been met, the controls for nonconforming product
defined in 8.7 shall be invoked.
Records of inspections and tests shall be maintained, and shall include at a minimum:
a) the results of the inspections or tests; and
b) the person or persons conducting the inspections or tests.
Where sampling plans are used for inspection or testing, these shall be statistically valid and/or based on
published and industry-accepted standards.
The organization shall ensure that product that is not inspected or tested is not delivered unless under waiver by
the customer or other relevant authority; such waivers shall be recorded.
8.7 Control of Nonconforming Product
8.7.1 Discovering and Recording Nonconforming Product
The organization shall ensure that nonconforming product is not used or delivered. The organization shall
maintain a documented procedure on the controls for nonconforming product.
The organization shall segregate nonconforming product, and subject it to review. The review of nonconforming
product shall include:
a) identification of the nonconforming product;
b) review of the nature of the nonconformity;
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 19 of 25
c) initial correction of the nonconforming product;
d) cause of the nonconformity;
e) disposition of the nonfonconforming product.
Records of the nonconforming product shall be maintained.
8.7.2 Dispositioning Nonconforming Product
Possible dispositions of nonconforming product shall include:
a) scrap / discard;
b) rework to bring the nonconforming product into conformity without altering the design;
c) repair, to bring the nonconforming product into conformity by altering the design;
d) return to supplier;
e) use-as-is; or
f) regrade.
Dispositions of repair or use-as-is shall be supported by recorded approval of the customer and/or design
authority holder.
Product subjected to rework or repair shall be re-inspected, with records of the reinspection maintained.
9.0 Performance Evaluation
9.1 Monitoring, Measurement, Analysis and Evaluation
9.1.1 Overall QMS Evaluation
The organization shall evaluate the performance and effectiveness of the quality management system in
accordance with a documented procedure.
9.1.2 Analysis and Evaluation
The organization shall analyze and evaluate quality system data related to the following, at a minimum:
a) product / service quality;
b) cost of quality (see note);
c) customer satisfaction;
d) quality system process performance against the defined process quality objectives; and
e) the performance of suppliers and subcontractors.
NOTE: Alternative methods of calculating cost of quality, such as cost of poor quality, P-A-F models, ABC models,
Crosby’s model, etc., are all acceptable means of satisfying this requirement.
9.2 Internal Audits
9.2.1 Purpose of Internal Audits
The organization shall conduct internal quality system audits at planned intervals in accordance with a
documented procedure. Such internal audits shall be performed to ensure the quality management system
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 20 of 25
a) conforms to the organization’s own requirements;
b) conforms to the requirements of this Standard;
c) is effectively implemented and maintained.
The company shall maintain a schedule of internal audits as a formal record.
9.2.2 Conducting Internal Audits
The documented procedure shall define:
a) the frequency of audits;
b) the internal audit method;
c) records to be completed;
d) the methods of selecting and training internal auditors.
NOTE: “internal audit methods” may include process-based auditing, requirements-based auditing, departmental
auditing, or any other method that can be shown to satisfy the requirements of this clause.
The organization shall schedule audits according to the results of prior audits, process performance issues, or
other concerns, but shall be at least performed annually.
Internal auditors shall be selected to ensure objectivity and the impartiality of the audits.
Records of completed internal audits shall be maintained.
9.2.3 Internal Audit Findings
The findings of internal audits shall include:
a) actual nonconformities requiring corrective action per clause 10.2 below;
b) potential nonconformities requiring preventive action per clause 10.3 below; and/or
c) opportunities for improvement or suggestions made by the internal auditors.
9.3 Management Review
9.3.1 Management Review Approach
The organization’s top management, as defined in 5.3, shall review the quality management system’s
performance in accordance with a documented procedure. This procedure shall define:
a) the methods for management review;
b) the minimum frequency for management review;
c) the minimum personnel required to attend the management review; and
d) the topics to be reviewed at management review (see 9.3.2).
The management review shall be conducted at a minimum annually.
9.3.2 Management Review Topics
At a minimum, the management review shall include a review of:
a) the status of actions from previous management reviews;
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 21 of 25
b) necessary changes and updates to the stakeholder and issues determined from 4.1 and 4.2;
c) risks and related mitigation plans (per 6.1.2);
d) opportunities and related pursuit plans (per 6.1.3);
e) process performance metrics (per 4.4);
f) customer satisfaction (per 9.1.2);
g) cost of quality (per 9.1.2);
h) performance of suppliers and subcontractors (per 8.4.1);
i) training effectiveness and related needs (per 7.2);
j) trends related to corrective and preventive actions (per 10.2);
k) internal and external audit results (per 9.2);
l) the adequacy of resources (per7.1);
m) changes to the organization or the quality management system;
n) opportunities for improvement for the quality management system; and
o) scheduling the next management review.
The organization shall maintain records of management review.
10.0 Improvement
10.1 General
The organization shall pursue continual improvement of its products, services, and quality management system
processes by:
a) following up and updating the opportunities pursued as defined in 6.1.3; and
b) implement additional opportunities based on the analysis of data in 9.12 and management review results
of 9.3.
10.2 Corrective Action
10.2.1 Requesting Corrective Action
The organization shall empower employees and staff to request corrective action on existing nonconformities
related to:
a) poor quality management system process performance and/or failure of a process to meet a goal;
b) trends in product or service nonconformity;
c) internal or external audit findings of nonconformity;
d) customer complaints;
e) reductions in levels of customer satisfaction; and
f) any other reason determined appropriate by management.
10.2.2 Processing Corrective Action Requests
The method for processing corrective actions shall be defined in a documented procedure.
Each corrective action request shall:
a) be recorded;
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 22 of 25
b) be assigned to a subject matter expert or responsible team for resolution;
c) have documented correction taken to resolve the immediate nonconformity, if applicable to the issue;
d) have a root cause analysis conducted and documented by the subject matter expert or the team;
e) have a corrective action plan documented and implemented which seeks to resolve the root cause and
prevent the nonconformity from recurring;
f) be reviewed for effectiveness upon completion of the corrective action plan;
g) be re-issued or some other action taken when the corrective action plan is found deficient;
h) be closed when the corrective action plan is found sufficient.
Records of corrective actions shall include the corrective action request itself, along with evidence of the
completion of (a) through (h) above, and a log of corrective actions which allows for trend analysis.
10.3 Preventive Action
10.2.1 Requesting Preventive Action
The organization shall empower employees and staff to request preventive action on potential nonconformities
related to the organization’s products, services or quality management system processes.
10.2.2 Processing Preventive Action Requests
The method for processing preventive actions shall be defined in a documented procedure.
NOTE: This may be a shared procedure with that required by 10.2 for corrective action.
Each preventive action request shall:
a) be recorded;
b) be assigned to a subject matter expert or responsible team for resolution;
c) have a root cause analysis conducted and documented by the subject matter expert or the team, if
deemed appropriate based on the nature of the request;
d) have a preventive action plan documented and implemented which seeks to prevent the nonconformity
from occurring;
e) be reviewed for effectiveness upon completion of the preventive action plan;
f) be re-issued or some other action taken when the preventive action plan is found deficient;
g) be closed when the preventive action plan is found sufficient.
Records of preventive actions shall include the preventive action request itself, along with evidence of the
completion of (a) through (g) above, and a log of preventive actions which allows for trend analysis.
NOTE: The preventive action log may be a shared log with that required by 10.2. for corrective action.
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 23 of 25
Appendix A: Oxebridge Q001 – ISO 9001 Crosswalk
The following table provides an assessment of how each Oxebridge Q001 clause complies with ISO 9001, and
identifies any gaps which must be closed if certification to ISO 9001 is sought after using Oxebridge Q001.
Oxebridge Q001 Clause ISO 9001:2015 Analog ISO 9001 Gap Actions
4.0 Context of the Organization 4.0 Context of the Organization
4.1 Identifying Stakeholders 4.2 Understanding the needs and expectations of interested parties
Order reversed between 4.1 and 4.2; no other
actions needed.
4.2 Identifying Stakeholders’ Concerns and Requirements
4.1 Understanding the Organization and Its Context
Order reversed between 4.1 and 4.2; no other
actions needed.
4.3 Quality Management System Scope 4.3 Determining the scope of the quality management system
No actions needed.
4.4 Quality Management System Processes
4.4 Quality management system and its processes 6.2 Quality objectives and planning to achieve them
Combines ISO 9001’s concepts of “process
measurements” and “quality objectives” into
a single concept “process quality objectives.”
Otherwise, no actions needed.
5.0 Leadership 5.0 Leadership
5.1 Management Commitment 5.1 Leadership & Commitment No actions needed.
5.1.2 Quality Culture & Customer Focus 5.1.2 Customer focus No actions needed.
5.2 Policy 5.2 Policy
ISO 9001 requires additional language in the
QP, including a statement of continual
improvement and a statement to comply with
applicable requirements.
5.3 Organizational Roles Responsibilities and Authorities
5.3 Organizational Roles Responsibilities and Authorities
ISO 9001 words this differently, verify
compliance against exact ISO 9001 text.
6.0 Quality Management System Planning 6.0 Planning
6.1 Risk and Opportunity Management 6.1 Actions to address risks and opportunities
6.1.1 Approach to Risk and Opportunity Management
6.1 Actions to address risks and opportunities No actions needed.
6.1.2 Risk Management 6.1 Actions to address risks and opportunities No actions needed.
6.1.3 Opportunity Management 6.1 Actions to address risks and opportunities No actions needed.
6.2 Change Management 6.3 Planning of changes 8.5.6 Control of changes
Combines two ISO 9001 clauses, but
otherwise, no actions needed.
7.0 Support 7.0 Support
7.1 Resources 7.1 Resources
7.1.1 Resource Provision 7.1.1 General No actions needed.
7.1.2 People 7.1.2 People No actions needed.
7.1.3 Infrastructure 7.1.3 Infrastructure No actions needed.
7.1.4 Work Environment 7.1.4 Environment for the operation of processes
No actions needed.
7.1.5 Inspection and Testing Resources 7.1.5 Monitoring and measuring resources No actions needed.
7.1.6 Knowledge Management 7.1.6 Organizational knowledge No actions needed.
7.2 Competence & Training 7.2 Competence No actions needed.
7.3 Awareness 7.3 Awareness No actions needed.
7.4 Communication 7.4 Communication 8.2.1 Customer communication
7.4.1 Internal Communication 7.4 Communication No actions needed.
7.4.2 External Communication 8.2.1 Customer communication No actions needed.
7.5 Documents and Records 7.5 Documented information
7.5.1 Development of Documents and Records
7.5 Documented information No actions needed.
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 24 of 25
Oxebridge Q001 Clause ISO 9001:2015 Analog ISO 9001 Gap Actions
7.5.2 Control of Documents 7.5 Documented information No actions needed.
7.5.2 Control of Records 7.5 Documented information No actions needed.
7.5.3 Implementation of Documents and Records
No analog. N/A
8.0 Operation 8.0 Operation
8.1 Operational Planning and Control 8.1 Operational planning and control
8.1.1 Operational Process Planning 8.1 Operational planning and control ISO 9001 words these differently. In some cases, the ISO 9001 requirements were moved elsewhere in the Oxebridge Q001 standard. Verify compliance against exact ISO 9001 text.
8.1.2 Operational Process Control 8.1 Operational planning and control
8.2 Capture and Review of Requirements 8.2 Requirements for products and services
8.2.1 Capture of Requirements 8.2.2 Determining the requirements related to products and services
No actions needed.
8.2.2 Review of Requirements 8.2.3 Review of requirements related to products and services
No actions needed.
8.2.3 Changes to Requirements 8.2.4 Changes to requirements for products and services
No actions needed.
8.3 Design and Development 8.3 Design and development of products and services
8.3.1 Design and Development Approach 8.3.1 General No actions needed.
8.3.2 Design and Development Planning 8.3.2 Design and development planning No actions needed.
8.3.3 Design and Development Requirements 8.3.3 Design and development inputs No actions needed.
8.3.4 Designs 8.3.5 Design and development outputs No actions needed.
8.3.4 Design and Development Reviews 8.3.4 Design and development controls No actions needed.
8.3.5 Design and Development Verification 8.3.4 Design and development controls No actions needed.
8.3.6 Design and Development Validation 8.3.4 Design and development controls No actions needed.
8.3.7 Design and Development Changes 8.3.6 Design and development changes No actions needed.
8.4 Purchasing and Subcontracting 8.4 Control of externally provided processes, products and services
8.4.1 Initial Evaluation and Approval of Suppliers
8.4.1 General 8.4.2 Type and extent of control
No actions needed.
8.4.2 Purchasing 8.4.3 Information for external providers No actions needed.
8.4.3 Subcontracting No analog N/A
8.4.4 Ongoing Evaluation of Suppliers 8.4.2 Type and extent of control No actions needed.
8.5 Production and Service Provision 8.5 Production and service provision
8.5.1 Control of Production and Service Provision
8.5.1 Control of production and service provision
8.5.2 Product Identification and Traceability 8.5.2 Identification and traceability No actions needed.
8.5.3 Property Belonging to Third Parties 8.5.3 Property belonging to customers or external providers
No actions needed.
8.5.4 Preservation 8.5.4 Preservation No actions needed.
8.5.6 Delivery No analog N/A
8.5.7 Post-Delivery Activities 8.5.5 Post-delivery activities ISO 9001 words this differently, verify
compliance against exact ISO 9001 text.
8.6 Inspection and Testing 8.6 Release of products and services No actions needed.
8.7 Control of Nonconforming Product 8.7 Control of nonconforming outputs
8.7.1 Discovering and Recording Nonconforming Product
8.7 Control of nonconforming outputs No actions needed.
8.7.2 Dispositioning Nonconforming Product 8.7 Control of nonconforming outputs No actions needed.
9.0 Performance Evaluation 9.0 Performance evaluation
9.1 Monitoring, Measurement, Analysis and Evaluation
9.1 Monitoring, measurement, analysis and evaluation
Oxebridge Q001 Ver. 0.3– DRAFT
A user-friendly remix of ISO 9001:2015
Page 25 of 25
Oxebridge Q001 Clause ISO 9001:2015 Analog ISO 9001 Gap Actions
9.1.1 Overall QMS Evaluation 9.1.1 General No actions needed.
9.1.2 Analysis and Evaluation 9.1.2 Customer satisfaction 9.1.3 Analysis and evaluation
No actions needed.
9.2 Internal Audits 9.2 Internal audit
9.2.1 Purpose of Internal Audits 9.2 Internal audit No actions needed.
9.2.2 Conducting Internal Audits 9.2 Internal audit No actions needed.
9.2.3 Internal Audit Findings 9.2 Internal audit No actions needed.
9.3 Management Review 9.3 Management review
9.3.1 Management Review Approach 9.3.1 General No actions needed.
9.3.2 Management Review Topics 9.3.2 Management review inputs 9.3.3 Management review outputs
No actions needed.
10.0 Improvement 10.0 Improvement
10.1 General 10.1 General 10.3 Continual Improvement
No actions needed.
10.2 Corrective Action 10.2 Nonconformity and corrective action
10.2.1 Requesting Corrective Action 10.2 Nonconformity and corrective action No actions needed.
10.2.2 Processing Corrective Action Requests 10.2 Nonconformity and corrective action No actions needed.
10.3 Preventive Action No analog
10.2.1 Requesting Preventive Action No analog N/A
10.2.2 Processing Preventive Action Requests No analog N/A
top related