otis acd2 mrl - job1001.comimg105.job1001.com/upload/adminnew/2014-12-27/1419643693-oa… · otis...

Post on 09-May-2020

96 Views

Category:

Documents

3 Downloads

Preview:

Click to see full reader

TRANSCRIPT

OTIS ACD2 MRL

Field Installation Manual

3.2 Check of Run -Direction

ERO

UP

OTIS ACD2 MRL

Field Installation Manual

3.3 Manual Brake Release check See Reference about SPBC and details of MRO.

BRB2 Press BRB1

BRB2 Key-

switched

Press BRB1

BRB2 BRB1 not pressed

/

/

OTIS ACD2 MRL

Field Installation Manual

4 PREPARE FIRST NORMAL RUN Attention: The elevator must be fully completed (wiring and mechanical assembly) before going beyond this point.

4.1 Position DSBD (connect 4T with 5T)

OTIS ACD2 MRL

Field Installation Manual

Unpublished Work Copyright © OTIS Elevator Company

4.2 Check of Hoistway Signals (PRS with RLEV/ADO)

Start

ERO

ACD2 MRL

Field Installation Manual

4.3 Check of Hoistway Signals (PRS without RLEV/ADO)

ERO

Start

OTIS ACD2 MRL

Field Installation Manual

4.4 Start up of the door system

4.4.1 NGSOK startup:

Reference: KAA31328AAA_SUR NGSOK Start up routine

OTIS ACD2 MRL

Field Installation Manual

4.4.2 Start up of DCSS5E

To startup the DCSS5 Operator please refer to the corresponding Field Installation Manual in Appendix.

4.5 Learn run

OTIS ACD2 MRL

Field Installation Manual

Press CHCS

Press DDO

NORM

ERO

NORM

Press “1” for calibration Press “0” for maintain

OTIS ACD2 MRL

Field Installation Manual

top related