ora budgeting and more. ora mission & purpose to provide the best service possible to the vcom...
Post on 26-Dec-2015
220 Views
Preview:
TRANSCRIPT
ORA Mission & Purpose
To provide the best service possible to the VCOM faculty and staff in their pursuit and administration of external funding. ORA provides full service throughout the lifecycle of a project, from preliminary review to award closeout.
2
What is a Sponsored Program?• External to VCOM• Funds are awarded for a specific purpose• Restrictions on the use of funds• Specific timeline for completion of project• Deliverable i.e. progress report, services• The entity that is sponsoring the project will be billed
for project costs incurred by VCOM3
General Regulatory FrameworkFederal OMB Circulars
Sponsor’s general guidelines
VCOM’s institutional policies and procedures
Sponsor’s RFP/RFA and award-specific requirements
4
Information Needed for BudgetAlways• The RFP/solicitation/application guidelines• Project Start and End dates (period of performance) • VCOM personnel to be included on budget• Provide guidance regarding costs to be included (by
category, by year).
5
Information Needed for Budget
If Applicable• Target or ceiling value • Supporting data for subcontractors and or consultants• Sponsor documentation for reduced indirect (must have
written policy)• Cost Sharing % and breakdown between cash and in-kind
contributions• Sponsor’s Cost Exclusions
6
Budget – Cautions/Red Flags
• VCOM does not estimate costs, contract for, report progress, or submit invoices based on man-hour rates
• A subcontractor or group of subcontractors should not receive the largest share of funding on a VCOM project – if they do, they should be the prime applicant and VCOM should be the sub
• Subcontractors have to adhere to all RFP requirements including any indirect limitations, costs sharing requirements, and cost exclusions
• Cost sharing should not be “volunteered” above the minimum amount required by RFP
7
Budgeting Basics Always have ORA review your budget
Including informal quotes to your sponsor and pre-proposal budgets
Terms to know: Cost Share:
VCOM’s portion of the project cost = REAL COST
Only used if required by sponsor
Indirect (aka: overhead, facilities & administration) Costs that are not project specific
Examples: administrative salaries, office supplies, postage, lab utilities, memory sticks
Extraordinary costs may be approved as direct costs
Calculated from Federal Rate Agreement
To use a lower rate, documentation of sponsor policy is necessary
8
Why get ORA approval on your budgets? Ensure that auditable pricing data is
submitted to your sponsors
Ensure compliance with regulations
Prevent under funding or over funding issues
ORA has to approve budgets for a sponsored research fund number to be established
Budget variables change frequently
9
Major Categories of Costs
10
Personnel (salaries, wages, & fringe benefits)Percentage of effort or months Typically largest costBased on actual payroll records
Equipment $1,000 or greater and useful life of >1 year Equipment should be 100% allocable to the project they are charged
Travel Differentiate between Domestic & International International travel requires advanced sponsor approval
Major Categories of Costs (cont.)
11
Materials/Supplies Items needed to conduct the research. Lab supplies, field supplies, etc. Office supplies & administrative items are not included, they are covered by
indirect cost. If exceptions are necessary, please let us know Computers – There are some questions to answer before you request a
computer be listed on your budget.
1. How is the computer necessary to fulfill the project’s scope of work?
2. How does the computer go beyond normal use in day-to-day operations of the laboratory?
3. How is the computer different from similar items provided by VCOM that are
treated as F&A (indirect) costs?
4. How will computer time be systematically allocated between multiple projects or split
between a sponsored fund and an unrestricted department fund?
Major Categories of Costs (cont.)
12
Consultants An individual or organization hired to provide services of an advisory nature Can be hired when the necessary expertise is not available within the VCOM
community VCOM employees cannot be paid as consultants on sponsored projects
Subcontractor An individual or organization hired by the University to complete a portion of
the project because the necessary expertise is not available within the VCOM community
Contribute to a deliverable and are vital to the proposed work Funding for a subcontractor is provided by and must be approved by the
sponsor
Salary/Fringe/Overhead RatesSalary* 3% on 7/1
Fringe RatesVCOM charges actual
rates
On-Campus F&A 53.5%
Off Campus F&A 21%
Note that no other costs are automatically escalated
* Salary escalations are only estimates for budget purpose and do not guarantee a salary increase
13
Direct Vs. Indirect Costs
14
DirectCosts that can be specifically identified with a particular project or program.
IndirectReal costs that are incurred… for common or joint objectives and which therefore cannot be identified with a particular project or program.
Direct Costs
15
PrinciplesReasonable and necessaryAllocable and verifiableAllowable under regulations
ExamplesPI salary and fringesTravelEquipment and materials/suppliesContractual services and subcontractors
Cost-Sharing
16
Quantified financial support contributed by College to the Sponsored Project-this is a real cost that must be reported to the sponsor
Cost Sharing Form should always be completed if the proposal involves cost sharing/matching
ORA approval required for all cost share not directly required by sponsor
Budget Narrative
17
Justify each item (or group of items) in each category
Provide justification for initial year budget and escalation/exceptions for additional budget years (including fringe)
Good idea to establish a budget narrative template It is recommended to address each cost category in
the order they are listed in the proposal budget
Your Budget After the Award
1. Budget revision to match the actual funding Will it affect your proposed Effort?2. Your Budget relative to your Research Plan3. Your Budget Justification4. “Burn Rate”5. Re-budgeting 6. Incremental funding and carry-over
18
Award Negotiation• OSP must review for:
• Type of Award (cost reimbursable or fixed price)• Budget Limitations / Restrictions• Invoice Requirements• Technical Reporting Requirements
•Unacceptable Terms that must be negotiated:• Laws of another state or country• Indemnification • Intellectual Property Rights• Publication Rights
19
Types of Agreements• Grant
• Financial assistance• For public good – not to be restricted for commercial or internal use• Federal Grants use standard federal assistance terms
• Contract• Procurement of research services• Specific obligations and detailed terms & conditions• Federal Contracts use Federal Acquisition Regulations (FARs)
• Cooperative Agreement• Sponsor and VCOM cooperate on a specific SOW with both parties
assigned specific responsibilities• Specific obligations and usually detailed terms
20
Post Award Responsibilities:
Review award set up Sponsor Terms and Conditions Process amendments on grants and contracts Review no-cost time extensions Monitor, review, and approve expenditures Prepare internal budget revisions Submit invoices and financial reports timely Accounts Receivable management Issue and monitor subawards
21
PI’s Responsibilities Provide overall project management to ensure
compliance Manage the project budget Request no-cost time extensions through ORA Responsible for all expenditure transactions Certify time & effort Submit technical progress reports timely
22
Budget PitfallsForgetting that salary and fringe typically eat up
60 to 80% of total direct costsUnderestimating support time and effortVague and unjustified costs categories; padding
categoriesInappropriate F&A charges
23
Major Compliance Issues
•Charging administrative costs to federally funded projects•Research involving human subjects requires approval from IRB•Research involving animals requires IACUC approval
24
Proposal AssistanceSearch for FundersFind CollaboratorsProposal
FormattingProposal GuidanceAdministrative
FormsBoiler plate
Information 26
Statistical AssistanceResearch DesignSample Size CalculationOutcome and Predictor VariablesStatistical Analysis PlanReview of Data Collection Forms and Data
Entry KeysSurvey CreationStatistical Analysis and Report Findings
Contact Us
28
• Eryn Perry : eperry@vcom.edu • Dawn Bennett : dbennett@vcom.edu • CK Vanover : cvanover@carolinas.vcom.edu• Greg Reaves : greaves@vcom.edu• Dalia Meisha : dmeisha@vcom.edu• ORA main site : www.vcom.edu/ORA