operation log and inspection result for mhp
Post on 06-Apr-2018
225 Views
Preview:
TRANSCRIPT
-
8/3/2019 Operation Log and Inspection Result for MHP
1/7
Fill Numeric Characters Clearly ! Sample of
Operation Log & Inspection Result (1/4)
OPERATION LOG (Hydro Supply) Month: Year:
R-N Y-N B-N R-Y Y-B B-R IR IY IB
[V] [V] [V] [V] [V] [V] [KW] [A] [A] [A] [per min]
7:00
11:00
17:00
7:00
11:00
17:00
7:00
11:00
17:00
7:00
11:00
17:00
7:00
11:00
17:00
7:00
11:00
17:00
7:00
11:00
17:00
7:00
11:00
17:00
7:00
11:00
17:00
7:00
11:00
17:00
7:00
11:00
17:00
REMARKSDate Time
Date Time
" 1
Voltage
Output
Current
Rotation
Comments of Operator
Hydro Supply
-
8/3/2019 Operation Log and Inspection Result for MHP
2/7
Hz [kWh] [Mpa]Frequency
Generated
Energy
PressureGauge on
Turbine
Fill N i Ch Cl l ! S l f i h
-
8/3/2019 Operation Log and Inspection Result for MHP
3/7
Fill Numeric Characters Clearly ! Sample of numeric chara
Operation Log & Inspection Result (2/4)
OPERATION LOG (Village Suppy) Month Year
R-N Y-N B-N R-Y Y-B B-R IR IY IB[V] [V] [V] [V] [V] [V] [A] [A] [A] Hz [kWh]
7:00
11:00
17:00
7:00
11:00
17:00
7:00
11:0017:00
7:00
11:00
17:00
7:00
11:00
17:00
7:00
11:0017:00
7:00
11:00
17:00
7:00
11:00
17:00
7:00
11:0017:00
7:00
11:00
17:00
7:00
11:00
17:00
REMARKSDate Time Comments of Operator
" 1 2 3 4 5 6 7 8
Date Time
Hydro Supply
Voltage Current
Frequency
Village
Supply
Energy
-
8/3/2019 Operation Log and Inspection Result for MHP
4/7
[Houses] [kW]
Village
Supplypower
Number ofConsumers
F aracters ear y n B oc Letters amp e o oc etters
-
8/3/2019 Operation Log and Inspection Result for MHP
5/7
F aracters ear y n B oc Letters amp e o oc etters
Operation Log & Inspection Result (3/4) "ABCDEFGHIJKLMN"
Month: Year:
Inspect according to "List of Inspection Items", and fill the problem of each structure in the following column if an
[m] [m/sec] [C]
REMARKS
Date Time
Fill Characters Clearly in Block Letters !!
River Water Intake Weir Inpspection Result for Civil Structure
TimeDate
Comments of Inspector/Inspection result that is not possible to write in the above column
IntakeHeadrace
Channel
Sand Settling
Basin
Penstock Power Station
RIVER WATER & CIVIL STRUCTURES
Inspec-
tion Class
Water
Height
Water
Discharge
Water
Temp.
-
8/3/2019 Operation Log and Inspection Result for MHP
6/7
Tailrace
F aracters ear y n B oc Letters amp e o oc etters
-
8/3/2019 Operation Log and Inspection Result for MHP
7/7
F aracters ear y n B oc Letters amp e o oc etters
Operation Log & Inspection Result (4/4) "ABCDEFGHIJKLMN"
GENERATING & TRANSMISSION FACILITIES Month: Year:
Inspect according to "List of Inspection Items", and fill the problem of each facilities in the following column if any
Inlet Valve Water Turbine Generator Ballast Load Power Board Transformer Transmission
Line
REMARKS
Date Time
Fill Characters Clearl in Block Letters !!
Comments of Inspector/Inspection result that is not possible to write in the above column
Inspec-
tion Class
Date
Inspection Result for Generating and Transmission Facilities