Ongoing Development Projects - Baluchistan

SrNo

Road/ Bridge Project/ Section Km ContractorPSDP

2015-16Progress Exp Comp Map

1 M-8Gwadar -Turbat-Hoshab (3 Packs)

193 FWO

2800

84.76% Jun-16 Map View

2 M-8Khuzdar-Ratodero (3 Packs)

143AM– NAZIR (JV)

SMADBFWO

85.81% Jun-16 Map View

3 N-85 Hoshab- Basima - Sorab 454 FWO 2500 51% Dec-16 Map View

4 N-70Waigum Rud-Khajuri –Bewata

132FWONLC

- Subst. Completed Map View

5 N-65 Kolpur Bypass 5.7Sapna Const & MAJB

(JV)- 89.01% Jun-16 Map View

To KarachiKarachi

TO PESHAWARTO QUETTA

IR

AN

ORMARAPASNI

GAWADAR

GABD

LIARI

TURBAT

MAND

BUZI PASS

AGHORMALAN

JIWANI

Bela

AFGHANISTAN

UthalSUNSTAR

M- 8

GAWADAR LINKAGES

Kararo

Wad

Khuzdar

Rato

dero

Khori

Wangu

Q.S.K

SK70 km

85 km

50 km

55 km

35 km 50 km

40 km 56 km

20 km

45 km

Pleri

HOSHAB

N-10: MCHP

Completed Sections of M-8

94 km

2

DASHT

Khuzdar – Shahdadkot (M-8)

Khuzdar

Quba Saeed Khan

ShahdadkotM-8

Surab – Hoshab (N-85)

Surab

Hoshab

N-85

N-25

N-30 M-8

Nag

Wadh

Basima

Panjgur

WAIGUM RUD - KHAJURI - BEWATA

Package III B (68 KM)

(NLC)

Package III A (64 KM)

(FWO)

CONSTRUCTION OF KOLPUR BYPASS ON N-65