Shared access

Pedestrian routes

Contractor compound

- 25th September 2015

Teaching: 28th September 2015

IRCEP

BUILDING

Teaching Centre

C

O

LLE

G

E

P

A

R

K

Lanyon South

E

lectric

al

substatio

n

Exams: 11th January 2016

Teaching: 1st February 2016

Teaching: 11th April 2016

Exams: 19th May 2016

Contractor possession of all

areas within site boundary

Contractor access and deliveries from

college park and via QUB car park. Note

QUB access to administration building to

be maintained

Contractors vechicular entry &

exit route along pedestrian

East-West Link

P

edestrian access m

aintained on N

orth S

outh link

E

ast - W

est lin

k

Key:

Contractor Access only

Administration Building

Deliveries to

admin building

Old Physics

Pedestrian East-West Link

Maintain pedestrian access along

East-West link at all times

Main entrance to Old Physics and fire exit

from the Administration Building to be kept

clear at all times.

on access to site.

New Physics

Maintain pedestrian access along

East-West link at all times

East -

W

est lin

k

Maintain escape

routes from

existing building

Contractor compound.

All deliveries to be

between 0700-0800 and

1800-1900.

Bicycle shed to remain in place

throughout works

Drainage works outside the

compound and under the bicycle

shed to be arranged in advance with

QUB Estates

East -

W

est lin

k

Retain bike

stands

New electric vehicle

charging points to be

retained and not to

be interrupted

Hoarding

Welcome Week: 21st September 2015

- 18th December 2015

- 26th January 2016

- 18th March 2016

- 13th May 2016

- 4th June 2016

CONSTRUCTION

EPD CODE: 10 009

REVISIONS DATEBY

SAFETY HEALTH AND ENVIRONMENTAL INFORMATION

For details of site-wide and general risks, to be read in conjunction

with these notes, see Drg No.

In addition to the risks normally associated with the types of work

detailed on this drawing, note the following risks and information:

CONSTRUCTION

DISMANTLING / DEMOLITION (Future)

For information relating to Use, Cleaning and Maintenance see H&S File

It is assumed that all works will be carried out by a competant contractor

working, where appropriate, to an approved method statement.

© Copyright Hamilton Architects

DO NOT SCALE FROM THIS DRAWINGAll dimensions are in millimetres unless otherwise indicated

t: +44 (0) 28 9033 4250

f: +44 (0) 28 9023 3249

e: belfast@hamiltonarchitects.co.uk

Hamilton House

3 Joy Street

Belfast

BT2 8LE

PROJECT:

No:

DRAWING:

No:

ESTATES DEPARTMENT

Administration Building

Belfast BT7 1NN

School of Mathematics and Physics

Reorganisation - Teaching Centre

P/13/802

WD A (00) 05 [002] RevB

Teaching Centre

Site Constraints Drawing

drawn bydatescale checked by

ARCHITECT'S PROJECT INFORMATION

project no: 1366 - School of Maths and Physics

Reorganisation - Teaching Centre

client: Queen's University Belfast

Estates Department

1:250@A1 APRIL'15 DF DD

WORKING DRAWING

CONTRACTORS ARE NOT TO

SCALE FROM THIS DRAWING

DO NOT SCALE THIS DRAWING

Site Constraints Drawing

A Key dates revised AD 21.09.15

B Contractors compound

area revised

AD 16.11.15

top related