To treat contact water that has been polluted by contact with the ore before discharge into the natural environment in order to comply with environmental regulations

A complete mobile installation set up, comprising sand filtration, decarbonation and reverse osmosis, for a flow rate of 300 m3/h. Continued authorisation to operate the mine from the environmental authorities.

Long term rentalMines, Spain

Challenge

Solution

Example

3

Chemical industry, Belgium

To ensure continuity of production in the event of breakdown of an ageing demineralisation facility.

An O'Ready audit carried out, and the system operational just 2 hours after the customer's phone call, following a breakdown on the facility.

Challenge

Solution

Emergency

Example

4

Energy industry, France

To treat water polluted by nitrates in a lagoon threatening to overflow due to heavy rainfall.

Installation of a reverse osmosis unit in a few hours, to treat the water in the lagoon before discharge into the natural environment.

Challenge

Solution

Emergency

Example

5

Petrochemical industry, Belgium

To ensure continuity of production of the petrochemical site despite the sudden failure of the permanent demineralisation facility.

Installation of 3 reverse osmosis units and mixed beds in just 6 hours, for a flow rate of 150 m3/h. No break in production at the petrochemical site.

Challenge

Solution

Emergency

Example

6

Energy industry, Belgium

To protect the equipment in the power station boiler despite degradation of the raw water quality before demineralisation.

Installation of a reverse osmosis unit between the permanent demineralisation facility and the boiler to reduce the TOC. Equipment protected.

Challenge

Solution

Scheduled operations

Example

7

Solution

To reduce the operating costs of a resin demineralisation chain.

Testing of a double-pass reverse osmosis unit at the demineralisation input with 20 to 40-fold reduction in the purchases of chemicals and decreased risk of accidents.

Challenge

Energy industry, FranceScheduled operations

Example

8

Energy industry, EgyptScheduled operations

To provide 30,000 m3 of demineralised water in 4 weeks for the start-up of a new power station.

Installation of a double-pass reverse osmosis unit preceded by a sand filtration system for producing the required quality and quantity of pure water.

Challenge

Solution

Example

9

Chemical industry, ChinaScheduled operations

To supply pure water to an industrial park in China while awaiting delivery of its permanent demineralisation unit.

Installation of a reverse osmosis unit followed by a fractal resin demineralisation unit (90 m3/h, conductivity <0.2 µS/cm) in series. Training local operators and monitoring the units using remote management.

Challenge

Solution

Example

10

Petrochemical industry, BelgiumScheduled operations

To carry out heavy maintenance work on the permanent demineralisation chain without halting production.

Installation of a sand filtration system, then a single-pass reverse osmosis system and mixed beds in series, for a flow rate of 100 m3/h during the 6-week maintenance period. Compliance with the maintenance schedule with no loss of production.

Challenge

Solution

Example