olympic delivery authority biodiversity action plan
Post on 09-Feb-2016
36 Views
Preview:
DESCRIPTION
TRANSCRIPT
Olympic Delivery AuthorityBiodiversity Action Plan
Introduction
Biodiversity
• Minimise effects of construction on the environment
• Provide suitable habitat mitigation
• Deliver new habitat and species enhancements
• Management and maintenance of habitat
Managing ecology in construction
Detailed site surveys
Removal of invasive species
Translocation of species
Creation of off site habitats
Survey results 2010
Highlights
• Black redstart in the vicinity of the Main Press Centre (MPC)
• Other sightings include a rare species of pipistrelle bat (Nathusius pipistrelle) at East Marsh.
• Rare Biodiversity Action Plan invertebrate species using the newly created habitat (i.e. the grassland around the Main Stadium and the log wall in Old Ford).
• Significant progress with planting of BAP habitat areas
Results
Bird species recorded
-First sightings include:
Black redstart (MPC)Short eared owl (Basketball) Kestrel (IBC)
Species recorded
ReptileGrass snake
Bat survey results4 species of bat, key foraging route East Marsh
Invertebrate results 2 BAP species fungus beetle and a flower beetle
top related