offshore & onshore liquefied natural gas projects
Post on 18-Dec-2021
11 Views
Preview:
TRANSCRIPT
1 / 22
OFFSHORE & ONSHORELIQUEFIED NATURAL GAS PROJECTS
2 / 22
INTRODUCTIONMajor offshore projects: Kashagan Oil Field Development Project – Offshore Civil Works and FGP-CaTRo Channel Works in Kazakshtan
Major onshore projects:
• Kashagan Oil Field Development Project – Onshore Civil Works in Kazakshtan
• Sakhalin I Chayvo Onshore Oil Processing Facility and Sakhalin II Onshore Processing Facility in Russia
Offshore management capacity: ENKA has been operating as independent ISM registered Marine organization since 2010. Most of the ENKA Marine fleet are registered to the Offshore Vessel Inspection Database (OVID) and are operated in compliance with international oil & gas industry standards.
Liquefied Natural Gas (LNG) projects: Since 2004, ENKA Group company named Cimtas Pipe has successfully been delivering over 110,000 tons of prefabricated pipe spools to several LNG projects globally. Cimtas Pipe has been providing Integrated Piping Solutions with an extensive range of LSAW pipes, fittings, and pipe spools to its top-tier customers, from a single location.
2 / 22
3 / 22
Oil Field Development of Caspian Sea
PROJECT LOCATION
Kashagan - Kazakhstan
CLIENTAgip KCO
ER SAI Caspian Contractor LLP
North Caspian Operating Company N.V.
CONSTRUCTION PERIOD1998 - Current
PROJECT VALUEUS$ 2 Billion
1998 EPC construction of Bautino supply base
1998-1999 Supply of graded rock for appraisal berms
1999-2000 Expansion of OKIOC Bautino supply base
2001-2004 Infrastructure upgrade works in Bautino
2005 Construction of Cuttings Pits in Koshken
2006 Supply of High Density Rock (HDR), EPC loading & berthing facility in Saritash
2008 Supply of sheet pile materials
2015-2017 Logistic Support activities for offshore
2015-2017 Pre fabrication works for offshore installations
2017-Current Logistic Support activities for offshore
ONSHORE WORKS
2001-2004 OKIOC Contract 2000-278: Offshore Civil Works 2005-2012 Contract 2004-1372 Offshore Civil Works
D Complex ConstructionA Island Construction3 ea. EPC Islands6 ea. Berms10 ea. IPS (Ice Protection Structures)4 ea. IRG (Ice Rubble Generators)3 ea. DC Islands for Full Field Development
2015-2016 D Complex Civil Modification WorksA Island Civil Modification WorksOnshore & Trench Dredging activities
2016-2017
2017-Current
EPC-3 Topside WorksEarly Works, Site Preparation, Load-in, Installation, Hook-up, Mechanical Completion, Pre-commissioning and CommissioningCurrently, ENKA is providing Marine Operations Services and Vessel/Equipment Rental
OFFSHORE WORKS
4 / 22
KASHAGANOil Field
Development
5 / 22
D COMPLEX
A ISLAND
DC-01 ISLAND
DC-05 ISLAND
DC-04 ISLAND
EPC-3 ISLAND
EPC-4 ISLAND EPC-2 ISLAND
6 / 22
A-island And D-island ConstructıonProjects (2015-2016)
7 / 22
EPC-3 TOPSIDE WORKS (2016-2017)
8 / 22
ENKA Marine Base (Bautino)ENKA Marine Base is located in Bautino Bay:
• Available 350 m Jetty
• 56,000 m2 storage area
• Weighbridge and Loading Bridge
• Passenger Transfer Office (Custom)
• Workshop for Precast Fabrication
• Marine Mechanical Workshop
• Welding Workshop
9 / 22
FGP-CaTRo Channel Works of Caspian Sea
PROJECT LOCATIONProrva - Kazakhstan
CLIENTVan Oord
TenizService LLP /Chevron
CONSTRUCTION PERIODOctober 2014 – October 2018
PROJECT VALUEUS$ 103.4 Million
ONSHORE WORKS2014 - 2017 Van Oord Contract - Marine Fleet and Logistic Services
2017 - 2018 Marine Installation Works (Mooring Piles, Fenders, CommunicationPlatforms) Preparation works - onshore
OFFSHORE WORKS
2014 - 2017 Van Oord Contract - Marine Fleet and Logistic Services
2017 - 2018 Marine Installation Works (Mooring Piles, Fenders, Communication Platforms)
10 / 22OFFSHORE MANAGEMENT CAPACITY
11 / 22
Accommodation Vessels
F/H “NAVRUZ”Non-self propelled Accommodation Vessel
Dimensions : 112 x 13.8 m
Max. draft : 3.10 m
POB : 300 person
SPV “SAKARYA”Special Purpose Vessel
Dimensions : 49.9 x 9.56 m
Max. draft : 3.20 m
POB : 74 person
12 / 22
Supply Vessel “YAGUAR”Dimensions : 54.86 x 12.19 m
Max. draft : 3.20 m
POB : 42 person
Fuel: 173 m3
Fresh Water: 169 m3
Sewage: 141 m3
Supply Vessel “FIRAT”
Dimensions : 52.65 x 11.58 m
Max. draft : 3.30 m
POB : 42 person
Fuel: 460 m3
Fresh Water: 131 m3
Sewage : 141 m3
Ballast Water: 200 m3
Oily bilge water: 8.1 m3
Dirty Oil tank: 1.3 m3
Clear deck Space: 276 m2
Deck Crane: 1 pcs IRON FIST, BLUE STEEL S.R.L. (PAGO VEIANO-BN-- ITA ) -SWL 2.2 Tons- 17.5mtr, 5.75 Tons- 7.2 mtr
Ballast Water: 320 m3
Oily bilge water: 20.9 m3
Dirty Oil tank: 4.35 m3
Clear deck Space: 335 m2
Deck Crane : 1 pcs, IRON FIST, BLUE STEEL S.R.L. (PAGO VEIANO-BN– ITA) - SWL 2.2 Tons- 17.5 mtr, 5.75 Tons- 7.2 mtr
Supply Vessels
13 / 22
m/v "ASI"Dimensions : 18.77 x 8.0 m
Max. draft : 2.20 m
Main Engine : 2 X 447 KW
BP: 10 Ton
Deck Crane : 1 pcs, “EFFER” Hydraulic Knuckle Crane. Model:65000-35-L (SWL 8 Ton / 7,3 m )
m/v "SURVEYOR"Dimensions : 23.5 x 10.0 m
Max. draft : 1.60 m
Main Engine : 3 X 164 KW
BP : 10.7 ton
Deck Crane : 2 pcs,
Heila 140-3S (Forward, 10 Ton / 12,17 m), Heila 3500-3S (Aft 2,8 Ton / 11,3 m)
m/v "GOKSU"Dimensions : 20.1 x 8.0 m
Max. draft : 2.40 m
Main Engine : 2 X 441 KW
BP : 14.7 ton
Deck Crane : 1 pcs, “EFFER” Knuckle Boom ship deck crane, Model:80000SL 3S (SWL 7.5 Ton / 11 m)
Multicats
14 / 22
Dimensions: 18.49 x 6.0 m
Draft : 1.20 m
Equipment :
GPS Receiver & Antenna
Motion Sensor
Gyro Compass
Multibeam Head
Multibeam Sonar Processor
Radio Telemetry
Bathymetric Survey Vessel “Coastal Assistant”
15 / 22
M/S "ATASH"Special service / Personnel carrier
Dimensions : 31.4 x 7.3 m
Max. draft : 1.65 m
Main Engine : 3 X 559 KW
Clear deck Space : 54.6 m2
POB : 70 (Day Pax)
M/S "NURIA"Dimensions : 14.74 x 13.0 m
Main Engine : 2 X 320 KW
Number of crew for safe operation / passengers 3 at twelve hours shift / 20
M/S "MEMO"Dimensions : 24.70 x 5.6 m
Max. draft : 1.50 m
Main Engine : 2 X 655 KW
Number of crew for safe operation / passengers 4 at twelve hours shift / 66
Crew Boats
16 / 22
Spud Barge “CORUH”
Dimensions : 54.0 x 11.0 m
Max. draft : 2.20 m
4 leg, 16 m long, Dia.609 mm
Spud Barge “EB-105“
Dimensions : 85.2 x 16.60 m
Max. draft: 2.60 m
4 leg, Length 16.9 m, Dia.610 mm
Spud Barge “CEYHAN“
Dimensions : 54.0 x 11.0 m
Max. draft : 2.20 m
4 leg, Length 16 m, Dia.609 mm
Spud / Spreader Barge “EB-106“
Dimensions : 85.2 x 16.60 m
Max. draft: 2.60 m
2 leg, Length 16.9 m, Dia.610 mm
4 Point mooring anchor system, rated pull: 55 Ton, 10 m/min. (each, 4
Ton Delta Flipper anchors, 44 mm wires, Length 500 m)
Spud and Spreader Barges
17 / 22
Cargo Barge “EB 103“
Dimensions : 85.60 m x 16.6 m
Draft (max): 2.60 m
Deadweight: 2500 t
Deck Capacity: 14 t/m2
Concrete Plant Barge“EB-102“
Dimensions : 85.60 x 16.6 m
Draft (max): 2.60 m
Deadweight: 2500 t
Deck Capacity: 14 t/m2
Concrete Plant;
Capacity : 30 m3/h, Cement Silo Capacity : 50 tones, Water tank at deck 50 m2
Cargo Barge “CEVIK -1”
Dimensions : 63.20 m x 16.40 m
Max. draft : 2.93 m
Deadweight: 2271 t
Deck Capacity : 10 t/m2
Cargo Barge “EB-104“
Dimensions : 85.60 m x 16.6 m
Draft (max): 2.60 m
Deadweight: 2500 t
Deck Capacity: 14 t/m2
Cargo and Concrete Plant Barges
18 / 22
Dimensions : 28.16 x 9.5 m
Draft : 2.60 m
Main Engine : 2 X 1014 KW
Bow Thruster : 160 KW
BP : 27.8 ton
Deck Crane : 1 pcs, HEILA / HLRM 140-3S -SWL 10 Ton / 12.25 m
Multi Purpose Tugboat “Meric”
19 / 22
Sakhalin II Onshore Processing Facility (OPF)
PROJECT LOCATION
Sakhalin - Russia
CLIENTSakhalin Energy Investment Co.
CONSTRUCTION PERIODMay 2003 - July 2009
PROJECT VALUEUS$ 1.1 Billion
PROJECT DESCRIPTIONThe Sakhalin II Onshore Processing Facility, located in the Nogliki district, 7 km inland in the north-east of Sakhalin Island, is the first combined oil & gas processing facility built in Russia and the largest of its kind globally. It is the key element of the Sakhalin II integrated oil and gas field development project, producing oil and gas from two major offshore fields located on the northeastern shelf of Sakhalin Island in the Okhotsk Sea.
The scope of work included the design and construction of buildings, multi-discipline fabrication, construction and erection works and provision of commissioning and start-up assistance for the whole facility; and also procurement of bulk materials; material management; transportation and logistics of all process equipment and materials sourced worldwide and free-issued by the client.
20 / 22
PROJECT LOCATION
Sakhalin Island - Russia
CLIENTExxon Neftegas Ltd.
CONSTRUCTION PERIODJune 2005 - October 2006
PROJECT VALUEUS$ 94 Million
PROJECT DESCRIPTIONIn May 2005, ENKA was awarded the contract for the installation of the mechanical and piping systems for the Onshore Processing Facility by Fluor Daniel Eurasia Inc. the EPCM Contractor, on behalf of Exxon Neftegas Limited.
ENKA scope comprised the erection and installation of various static and rotating process equipment including compressors, generators, heat exchangers, boilers and pumps; field erection of 40,000 tons of prefabricated modules weighing between 900 and 2,500 tons and field erection of 4,100 tons of steel as well as 40,000 m of field piping, including fitting, welding, pressure tests, painting and insulation. ENKA also performed all scaffolding and winterization works for all disciplines at the Onshore Processing Facility Site & Orlan Platform during the project and provided commissioning and start-up support to the client.
ENKA not only performed the hook up of these prefabricated modules, but also a substantial amount of stick built site erection work during very harsh two winters, including required field modifications to prefabricated modules and erection of their loose delivered parts, erection of freestanding equipment, various stick built pipe racks and all interconnecting piping works. ENKA also provided plant commissioning and startup assistance to the client.
Sakhalin I Chayvo Onshore Oil Processing Facility
21 / 22
EgeGaz Aliaga LNG Terminal
PROJECT LOCATION
İzmir – Turkey
CLIENTEgeGaz Inc.
CONSTRUCTION PERIODMarch 2000 – September 2001
PROJECT DESCRIPTION
Mechanical Erection (Steel Works) of tanks was performed by CİMTAŞ (a subsidiary of ENKA). The very unique feature of the project is the lifting operation of the tank roofs. Following the ground assembly, the tank roof with a single piece weight of 800 tons and a diameter of 80 m has been lifted to its final position at +35 m by means of compressed air blowing.
• Capacity: 2 x 140,000 m³
• Height: 31 meters
• Diameter: 82 meters
• Materials: A553 Type 1 (9% Ni)
• Concrete, carbon-steel-lined outer wall and dome roof, an ASTM A 553 type 1 9%Ni steel tank, a suspended aluminium deck type ASTM B 209 5083 and stainless steel piping and stairs
• Designed by: CB&I as per API 620 and have a total steel weight of 7,000 tons
• Inner tank steel material being ASTM A553 Type 1 requiring advanced welding technology
22 / 22
Project Location Client Tonnage PlantCapacity Business Lines Year
Sabine Pass LNG Terminal (Stage 6) U.S.A. Bechtel OG&C Houston 7,537 4.5 mtpa Engineering, LSAW Pipe, Fitting, Pipe Spool 2020
Croatian LNG Terminal Croatia OMV INDOIL 186 1.9 mtpa LSAW Pipe 2020
Croatian LNG Terminal Croatia TPK Armatura 71 1.9 mtpa LSAW Pipe 2020
Corpus Christi Liquefaction Project (Stage 3) U.S.A Bechtel OG&C Houston 7,567 4.5 mtpa LSAW Pipe, Fitting, Pipe Spool 2019
Kitimat LNG Project Canada Erciyas Boru 270 10 mtpa LSAW Pipe 2019
Marmara Ereglisi LNG Terminal Project Turkey GEN Group 10 5.9 mtpa Fitting 2017
Sabine Pass LNG Terminal (Stage 5) U.S.A Bechtel OG&C Houston 6,809 4.5 mtpa Fitting, Pipe Spool 2017
Corpus Christi Liquefaction Project (Stage 1&2) U.S.A Bechtel OG&C Houston 13,823 9 mtpa Fitting, Pipe Spool 2017
Marmara Ereglisi LNG Terminal Project Turkey GEN Group 80 5.9 mtpa LSAW Pipe 2017
Sabine Pass LNG Terminal (Stage 3&4) U.S.A Bechtel OG&C Houston 13,670 9 mtpa Pipe Spool 2015
Angola LNG Project / Additional Scope Angola Bechtel OG&C Houston 1,300 5.2 mtpa Pipe Spool 2015
Sabine Pass LNG Terminal (Stage 1&2) U.S.A Bechtel OG&C Houston 14,269 Pipe Spool 2014
Australia Pacific LNG Project Australia Bechtel OG&C Houston 6,800 9 mtpa Pipe Spool 2014
Santos GLNG Australia Bechtel OG&C Houston 13,200 7.8 mtpa Pipe Spool 2014
BG Queensland LNG Project Australia Bechtel OG&C Houston 9,800 8.5 mtpa Pipe Spool 2013
Angola LNG Project Angola Bechtel OG&C Houston 7,200 5.2 mtpa Pipe Spool 2011
Equatorial Guinea LNG Project EquatorialGuinea Bechtel OG&C Houston 2,500 3.7 mtpa Pipe Spool 2006
Egyptian LNG Project Egypt Bechtel OG&C Houston 5,500 7.2 mtpa Pipe Spool 2004
CIMTAS PIPE FEATURED LIQUEFIED NATURAL GAS (LNG) PROJECTS