ÖBB - Foundation
Rammfundierung bei nder ÖBB 2
Up to 75 m
Contact WireCatenary Wire
Cantilever orBracket Arm
Rammfundierung bei nder ÖBB 3
Standard Types of MastsRectangular Concrete Mast Rectangular Steel Mast
Rammfundierung bei nder ÖBB 4
Concrete Pad Foundation
• Concrete Quantity: 1,2m³ to 12,8m³
• Quiver for Mast Footing • Fastening of Mast by
compacted split gravel
of Rectangular Concrete Mast
Split Gravel
Rammfundierung bei nder ÖBB 5
Development of Piling Technology
Rammfundierung bei nder ÖBB 6
Austropile
Contact Patch/Area
Cutting
Box-Section Frame consists of 4 steel plates with defined contact areas
Rammfundierung bei nder ÖBB 7
Piling Process
Cavity for mast remains
unfilled
NO EXCAVATION
Rammfundierung bei nder ÖBB 8
Advantages of Austropiles• Set-up of foundation in
one step• No excavation• Immediately loadable• Modular concept allows
delivery and installation on short notice
• Construction of foundation at inadmissible location
• Additional earth connection
Rammfundierung bei nder ÖBB 9
Piling Rig
Firstly operated at Rail Station Wörgl
in 1992
Rammfundierung bei nder ÖBB 10
Hydraulic Hammer
• Weight of hammer 1500kg
• Total Weight 2700kg
• Rate of Fall max 4,7m/s
• Blowenergy 16,5 kNm
• Blowrate 60-100/min.
Rammfundierung bei nder ÖBB 11
Advantages of Piling Rig• Operation underneath
existing lines and networks
• Unconstrained operation of subsidiary track
• Self-propelled (no locomotive)
Rammfundierung bei nder ÖBB 12
Advantages of Piling Rig
• Rail-Road Vehicle(minimized travel time)
• Hydraulic Hammer(simplified handling/ adjustable to ground conditions)
• Average Piling Time approx. 25 Minutes(at hardground conditions up to 1 hour)
Rammfundierung bei nder ÖBB 13
Work Flow
Rammfundierung bei nder ÖBB 14
Functional Range of Astropiles
• Mastfoundation of Catenary Systems
• Foundation of Sound Barrier Supports
• Foundation of Signal Masts
• Foundation of Floodlight Tower
Rammfundierung bei nder ÖBB 15
Mast Mounting Device
• Crane Momentum
75 mtons
• Dead Weight 120 tons
• Unconstrained operation of subsidiary track
• Existing Catenary System does not impede operation
Rammfundierung bei nder ÖBB 17
Client‘s Advantages • Optimized Use of Processing Time
• Execution without Locomotives
• Minimized Documentation of Client required ... hence beginning of construction works at short notice
• Optimized Economical Production Costs of Foundation
Rammfundierung bei nder ÖBB 18
Special Operation
Joint Operation of Foundation and Installation Gangs in the Area of Haag
Mission Possible
by using
EUROPTEN - Technology
Rammfundierung bei nder ÖBB 19
Special OperationRailstation Meidling
Foundation Works closed to Platforms
80 Foundation completed in 13
Workingdays under full Operation of
Railtraffic
Rammfundierung bei nder ÖBB 21
• For the further information please contact:
• Mr. Wolfgang Schlesinger
• wolfgang.schlesinger@europten.at
• Marko Marijanovic
• marko.marijanovic@porr.at
Rammfundierung bei nder ÖBB 22
EUROPTEN
an innovative Company
Your PARTNER for the future !