October 2008 Phase IVB Construction. Photographs by Steve Bousquin & Brent Anderson. October 8, 2008. Looking south along the northwest side of the Phase IVB construction area, where the contractors have made substantial progress degrading spoil mounds to backfill the canal. October 8, 2008. - PowerPoint PPT Presentation

TRANSCRIPT

October 2008 Phase IVB Construction

Photographs by Steve Bousquin & Brent Anderson

October 8, 2008

Looking south along the northwest side of the Phase IVB construction area, where the contractors have made substantial progress degrading spoil mounds to backfill the canal.

October 8, 2008

July 31, 2008Scraped spoil at the north end of Phase IVB construction site.

October 7, 2008

Phase IVB Construction

Removing spoil from the spoil mound on the northwest floodplain of Phase IVB.

October 7, 2008

Phase IVB Backfilling

October 7, 2008

Removing spoil from the northwest floodplain of Phase IVB. The dump truck will bring the spoil material directly to C-38 for backfilling.

October 8, 2008

Looking south down the C-38 from the north end of the Phase IVB construction area. This image shows the first plug that is intended to direct water flow around the construction site.October 8, 2008

October 8, 2008

Looking southwest at the first plug from the northeast side of the Phase IVB construction area.

October 8, 2008

Looking south the plug on the north end of the Phase IVB construction area. The plug is diverting the water around the construction site which is intended to create less turbidity downstream of the backfilling.

October 7, 2008

Looking northeast at the plug that extends across the C-38 at the north end of the Phase IVB construction area. The bulldozer is pushing transported spoil material into C-38 downstream of the plug.

July 31, 2008Dumping and bulldozing to backfill C-38 at the north end of Phase IVB.

October 7, 2008

Dumping and bulldozing to backfill C-38 at the north end of Phase IVB.

October 7, 2008