OBSERVATIONS REPLY
“EUPHORIA-SUB DIVISION OF
SPORTS CITY”
At
SC-01, Sports City, Adjoining Sector, Tech
Zone-IV, Greater Noida Uttar Pradesh
For
M/s Euphoria Sports City Pvt Ltd
Prepared By
GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD. (An ISO 9001:2008 Certified Co.: Accredited by QCI / NABET: Approved by MoEF, GoI)
F-374-375, Sector-63, Noida, U.P.
Ph.: 0120- 4044630, Telefax: 0120- 2406519
Email: eia@grc-india.com, info@ grc-india.com
Website: http://www.grc-india.com
GRC INDIA TRAINING & ANALYTICAL LABORATORY (Accredited by NABL & Recognized by MoEF&CC
A unit of GRC India
“Euphoria – Sub-division of Sports City”
SC-1, Sports City, Adjoining Sector Techzone-IV, 282nd
SEAC, U.P
Greater Noida, Uttar Pradesh Reply
M/s Euphoria Sports City Pvt. Ltd. 1
Point-wise reply to the queries raised during 15th EAC, Delhi, meeting dated 13.04.17 w.r.t.
“Euphoria- Sub division of Sports City” at SC-1, Sports City, Adjoining Sector
Techzone-IV, Greater Noida, Uttar Pradesh by M/s. Euphoria Sports City Pvt. Ltd.
S. No. Queries Reply
1. A copy of the minutes of the SEAC
meeting held on 08.12.2016.
The SEAC Minutes of meeting copy is
enclosed as Annexure I.
2. Give a conformity status to conditions
stipulated in Annexure XIV of the
amended EIA Notification vide S.O.
3999 (E) dated 09.12.2016
As the built-up area is more than
1,50,000sqm therefore the said notification is
not applicable for our project
3. Notarized affidavit of undertaking by
Board of Director(s) that there is no
violation with regards to the provisions
as made in the amended EIA
notification of 14.03.2017.
Notarized affidavit of undertaking by Board
of Director(s) is enclosed as Annexure II.
4. Full ECBC compliance ECBC Compliance is enclosed as
Annexure- III.
5. No cutting of trees shall be undertaken.
Trees shall be suitably transplanted in
consultation with the Forest
Department.
Undertaking for the same is enclosed as
Annexure IV.
6. The Treatment plant should be
developed in phases.
Agreed. We will develop the Treatment Plant
in Phases.
7. All fixtures, appliances and energy
saving devices shall be indigenously
manufactured use of foreign make
goods should only be provided when
indigenous goods are not available and
with the permission of the Board of
Directors.
Undertaking by Board of Directors is
enclosed as Annexure V.
8. CSR spend should be budgeted as per
the provision of the company act.
CSR is enclosed as Annexure VI.
9. Details energy conservation measures
to be taken. All points mentioned in the
proposal such as orientation to support
reduced heat gain, use of ASHRAE
90.1, use of ECBC compliant Envelope
measures to be supported through
drawings and details in the proposal.
Energy Conservation Measures are enclosed
as Annexure-VII & ECBC Compliance is
attached as Annexure –III.
Key Energy Conserving Features:
Architecture:
•The building design has incorporatedshading through massing and verticalprojections as an in-built part offenestration design.
•In addition to the overall facadedesign, local shading devices of 0.6 mhave been incorporate over all thewindows.
•Almost all habitable spaces have anexternal facade thereby providingoptimum daylight. This shall negate theuse of artificial lighting throughout theday.
Climate Zone: Mild and Warm
ECBC Compliance and Energy Conservation
ECBC Compliance and Energy ConservationSection 4 - Building Envelope
Sr. No.
Building Envelope Component
ECBC Prescriptive Compliance
Proposed
1 Top Roof U = 0.261 W/sqm K (max) ;
Initial Solar Reflectance = 0.7 (min) ;
Initial Emittance = 0.75 (min)
Heat Reflective tile/china mosaic + 35 mm screed + geo textile& plastic sheet + 75 mm XPS Board + Waterproofing+ 150 mmRCC (with steel) + putty finish
3 Fenestration U = 3.3 W/sqm K (max) ;SHGC = 0.25 (max) ;VLT = 0.27 (min)
Single Glazing with improved SHGC along with horizontal and vertical shading devices, further reducing the effective SHGC.
4 Air Leakages Control air leakage through entrance doors within 5.0 l/s/sqm and through other windows and doors to 2.0 l/s/sqm
The project is naturally ventilated and it is envisaged that AC's shall be used only is summers for limited time periods. However weather stripping shall be done for windows
* The Residential projects are naturally ventilated with a provision of air conditioning (power point and drainage of condensate), hence the building envelope is not sealed.
2 External Wall U = 0.81 W/sqm K (max) External light coloured paint + 175 mm R.C.C wall + 15 mm plaster
ECBC Compliance and Energy ConservationSection 5 - HVAC
Sr. No.
HVAC Component ECBC Prescriptive Compliance
Proposed
1 Natural Ventilation NBC Part 8 Section1, 5.4.3 and 5.7.1.)
The openings are conducive to the wind availability and the operable area is more than 20 % of the floor area for all habitable spaces.
By virtue of the plot orientation, most of the apertures are within 30 deg from available wind direction.
The vertical elements in the building design act as wind guides on the South and North Side elevations.
The Liv-Kit-Din design facilitates cross-ventilation required for warm and humid climate.
The window positions fulfil the recommended sill levels to ensure air movement at critical height within a space. This shall ensure better perception of thermal comfort and reduce use of fans and AC's
2 Minimum Equipment Efficiency
The cooling equipment must meet minimum efficiency parameters as prescribed by ECBC and ASHRAE 90.1-2010
The Tenant guideline shall specify the use of star rated ceiling fans
Villas & Flats: The developer shall not be providing air conditioning equipment, since the project is primarily designed to be naturally ventilated. However, the tenant and occupant guideline shall be provided by the developer specifying energy efficient minimum 3 star rated AC's
ECBC Compliance and Energy ConservationSection 6 – Service Water Heating
Sr. No.
Service Water
Heating
ECBC Prescriptive Compliance
Proposed
1 6.2.1Solar Water Heating
20 % of total hot water requirement must be catered through Solar Thermal system
2 6.2.2Equipment Efficiency
The Solar Water Heating system must meet the minimum efficiency level as per IS 13129 part (1& 2)
The manufacturer shall be selected based in the compliance with IS 13129 part1& 2
No other electric or gas based heating system is being provided by thedeveloper.
3 6.2.4Piping Insulation
R value of 0.35 for hot water piping and storage
R value of 0.35 for hot water piping and storage shall be provided
No. of Flats = 2200 Nos.
Total No. of Occupants @4.5 people /flat = 9900 nos.
Hot Water Requirement @ 25 lpcd = 247500 liters
Solar Hot water system for 20 % capacity = 49500 liters
ECBC Compliance and Energy ConservationSection 7 – Lighting
Sr. No.
Lighting ECBC Prescriptive Compliance Proposed
1 7.2.1Lighting Controls
24 hour use building are excluded from this requirement
Timer based on/off control shall be provided for commonarea lighting.
2 7.2.3Efficacy
Lighting for exterior building ground luminaries which operate at greater than 100 W shall contain lamps with minimum efficacy of 60 lm/W unless controlled by a motion sensor
Though the luminaries are not more than 100 watts, 100 %external lighting shall meet efficacy value of 60 lm/W
3 7.3.1Interior Lighting Power Density
Plan artificial lighting design lower than the maximum permissible Lighting Power Density recommended by ECBC
Maximum permissible LPD is 7.5 W/sqm as per Building Area Method
The internal lighting inside the flats is not in the developersscope. However, the tenant and occupant guideline shallbe provided by the developer specifying the maximumpermissible LPD of 7.5 W/sqm as per ECBC
4 7.3.5Exterior Lighting Power Density
Plan artificial lighting design lower than the maximum permissible Lighting Power Density recommended by ECBC
LED based energy efficient lighting shall be used and theLPD shall be well within the maximum allowed LPD limits.
Internal Lighting in Developers Scope:LED and T5's energy efficient lighting shall be usedLighting Power Densities shall be in adherence to ECBCStaircase LPD = 1.2 W/sqmLobbies and Entrance Foyers = 2.82 W/sqmCommunity = 4.5 W/sqmIndoor stadium = 6 W/sqmCommercial = 4.5 W/sqmLandscape = 1.5 W/sqm
ECBC Compliance and Energy Conservation
Section 8 – Electrical Power
Sr. No.
Electric Power ECBC Prescriptive Compliance
Proposed
1 8.2.1Transformers
Maximum Allowable losses as per ECBC
2 8.2.2Motors
Minimum Efficiency as per ECBC
The motors used by pumps proposed in the project shall beenergy efficient complying with the ECBC norms.
The losses at 50 % loading shall be limited to 2MW &.3 MW
The total losses at shall be limited to 2.3 MW
2 nos 12.5 MVA ,33/11 kVPower Transformers.
These shallbe low loss and ECBCcompliantTransformers.
ECBC Compliance and Energy Conservation
The project shall be employing the Whole Building Performance Method
The key Energy Conservation Measures (ECM’s) of the project –
•Local Shading Devices and Shading on account of massing
•Day light and Natural Ventilation
•Energy Efficient Lighting using LED;’s in common areas Controls for external lighting
•Energy efficient Building Envelope – SGU with shading and improved SHGC, Roof
Insulation and Light Colored Finishes
ENERGY CONSERVATION PLAN
Effective measures have been incorporated to minimize the energy consumption in the following
manners:
Maximum use of sunlight
The high efficiency CFL lamps shall be used
DG sets are controlled by PLC panel
Illumination level in different area is as per NBC
To economize on the use of energy, following main systems are proposed to be adopted:
Adequate design to limit the losses in transmission and distribution system.
Use of energy efficient devices like light sources such as true-lite fluorescent lamps and
compact fluorescent lamps.
Use of insulation on roof top to reduce air-conditioning load.
Use of capacitors at load centers to improve voltage and power factor to reduce
distributional losses and also to avoid penalty by state electricity authority.
The project, will involve uses of glass with coating of low e-value. These glass will help is
reduction of the heat intake thereby reducing the Air-conditioning load.
Suitable energy optimization is adopted during the calculation of energy load of the project. The
space heating load will be minimized using passive solar structure and suitable buildings envelop
material. Uses of compact fluorescent and fluorescent lamps will be used for all common area
and basement parking.
Roof insulation will be provided using earthen pots or thermocol on the top floor of the Building.
The U-values of the roof, external wall and glazing of the building will meet the requirements as
specified in the Energy Conservation Building Code (ECBC).
S. No. Component Materials Used U-Value (W/m2-C)
Achieved Permissible
1. Roof RCC slab with foam concrete
insulation
0.409 0.409
2. Exposed Wall CLC blocks plastered on both sides
(Block size 500 x 250 x 200 mm)
0.434 0.44
3. Glazing Double clear glass (6 mm clear glass +
12 mm air gap + 6 mm clear glass)
2.839 3.3
The uses of non-conventional source of energy in the construction project are as follows:
a. Solar Water Heater
The project will be installed solar panels for hot water requirements and hence, the
dependency on electricity for hot water generation can be minimized.
b. Solar Street Light
It is also suggested to use solar cell powered street lights within the project site for
conservation of electricity.
c. Use of CFL Lamps
The project proponent will use CFL Lamps which conserve less electricity
d. Natural Ventilation and Lighting
All building blocks of the project are designed with natural ventilation and natural light so
that the use of lights during day time can be minimized. All fenestration with U-factors,
SHGC, or visible light transmittance determined, certified and labeled in accordance ISO 15099
shall be adopted.
ENERGY CONSERVATION MEASURES
• Materials for Doors and window which are poor heat conductor will be used.
• Fly ash made bricks and cement will be used.
• All the roof is proposed to be insulated to minimize heat gain with 50 mm expanded
Polystyrene or equivalent material.
• CFL based lighting will be done in the common areas, landscape areas, signages, entry
gates and boundary walls etc.
• Use of solar water heater systems has been proposed for the project.
• Optimum use of skylights.
• External and basement parking lighting will be time controlled.
• DG sets shall be on auto cut and auto start controlled mechanism.
• Solar lighting is proposed for open spaces and signages.