ADDENDUM 1 JOB 22
TO: All prospective bidders and suppliers on Project SU-2-990(054)058 scheduled for the November 17,
2017 bid opening.
Revisions for SU-2-990(054)058:
Remove the following sheets:
• Section 4, Sheet 2
• Section 11, Sheets 4-5
Remove & Replace the following sheets:
• Section 1, Sheet 1: Central Avenue has been removed
• Section 2, Sheet 1: Table of Contents has been updated to reflect removed sheets
• Section 4, Sheet 2-3: Section 4, Sheet 2 was removed. Section 4, Sheets 3-4 were re-numbered.
• Section 6, Sheet 1: Notes 100-P02, 430-P01 and 704-P02 have been revised
• Section 8, Sheet 1: The following bid items have been updated:
"CONTRACT BOND", "REMOVAL OF CURB & GUTTER", "AGGREGATE BASE COURSE CL 5", "PATCHING",
"DOWELED CONTRACTION JOINT ASSEMBLY", "DOWEL BARS", "CONC PVMT REPAIR-SPOT FULL DEPTH",
"RANDOM PCC CRACK CLEANING & SEALING", "SPALL REPAIR-PARTIAL DEPTH", "MOBILIZATION",
"TRAFFIC CONTROL SIGNS", "TYPE I BARRICADE", "TYPE III BARRICADE", "DELINEATOR DRUMS",
"STACKABLE VERTICAL PANELS", "OBLITERATION OF PAVEMENT MARKING", "ADJUST MANHOLE", "CURB
& GUTTER-TYPE I", "EPOXY PVMT MK MESSAGE", "EPOXY PVMT MK 4IN LINE", "EPOXY PVMT MK 6IN
LINE", "EPOXY PVMT MK 8IN LINE", and "EPOXY PVMT MK 24IN LINE"
• Section 11, Sheet 4-11: Section 11, Sheets 4-5 were removed. Section 11, Sheets 6-12 were re-
numbered. Section 11, Sheets 13-14 were combined and re-numbered
• Section 30, Sheet 1: Central Avenue has been removed
Sincerely,
KLJ
Chad Petersen
Project Engineer
Enclosure(s): Revised Plan Sheets
Project #: SU-2-990(054)058
SpecNo.
Amount
Description UnitApprox.Quantity
Unit Price
$$$$$ 000 $$$$$ 00
PROPOSAL FORMNorth Dakota Department of Transportation
022Page 5 of 8
10/3/2017
JobNovember 17, 2017BID OPENING:
CodeNo.
Bidder must type or neatly print unit prices in numerals, make extensions for each item, and total. Do not carry unit prices further than three (3) decimal places.
ItemNo.
Project: SU-2-990(054)058 (PCN-21845)
Rev: BID ITEMS
CONTRACT BOND 1.001 103 0100 L SUM
REMOVAL OF CURB & GUTTER 441.002 202 0130 LF
AGGREGATE BASE COURSE CL 5 1,691.003 302 0120 TON
PATCHING 25.004 430 2000 TON
DOWELED CONTRACTION JOINT ASSEMBLY 1,240.005 570 0240 LF
DOWEL BARS 2,480.006 570 0424 EA
CONC PVMT REPAIR-SPOT FULL DEPTH 33,805.007 570 0700 SF
RANDOM PCC CRACK CLEANING & SEALING 1,193.008 570 0966 LF
SPALL REPAIR-PARTIAL DEPTH 2,466.009 570 1512 SF
MOBILIZATION 1.010 702 0100 L SUM
TRAFFIC CONTROL SIGNS 3,874.011 704 1000 UNIT
TYPE I BARRICADE 20.012 704 1050 EA
TYPE III BARRICADE 74.013 704 1052 EA
DELINEATOR DRUMS 94.014 704 1060 EA
STACKABLE VERTICAL PANELS 40.015 704 1080 EA
OBLITERATION OF PAVEMENT MARKING 7,314.016 704 1500 SF
SpecNo.
Amount
Description UnitApprox.Quantity
Unit Price
$$$$$ 000 $$$$$ 00
PROPOSAL FORMNorth Dakota Department of Transportation
022Page 6 of 8
10/3/2017
JobNovember 17, 2017BID OPENING:
CodeNo.
Bidder must type or neatly print unit prices in numerals, make extensions for each item, and total. Do not carry unit prices further than three (3) decimal places.
ItemNo.
Project: SU-2-990(054)058 (PCN-21845)
Rev: BID ITEMS
ADJUST GATE VALVE BOX 3.017 722 6140 EA
ADJUST MANHOLE 15.018 722 6200 EA
CURB & GUTTER-TYPE I 441.019 748 0140 LF
EPOXY PVMT MK MESSAGE 500746.020 762 0112 SF
EPOXY PVMT MK 4IN LINE 6,364.021 762 0113 LF
EPOXY PVMT MK 6IN LINE 4,422.022 762 0114 LF
EPOXY PVMT MK 8IN LINE 527.023 762 0115 LF
EPOXY PVMT MK 24IN LINE 942.024 762 0117 LF
TEMPORARY TRAFFIC SIGNALS 4.025 772 2810 EA
TOTAL SUM BID
PROPOSAL FORMNorth Dakota Department of Transportation
Job 022
10/3/2017Rev:
BID OPENING:November 17, 2017
Project:
Type of Work:
County: BARNES
Length: 3.1200 Miles
CONCRETE PAVEMENT REPAIR, CURB & GUTTER
SU-2-990(054)058 (PCN-21845)
Page 7 of 8
TIME FOR COMPLETION:
The undersigned Bidder agrees, if awarded the contract, to prosecute the work with sufficient
forces and equipment to complete the contract work within the allowable time specified as follows:
WORKING DAY CONTRACT: working days are provided. The Department will begin
charging working days beginning or the date work begins on the project site,
NA
CALENDAR DAY CONTRACT:
begins on the project site, whichever is earlier.
COMPLETION DATE CONTRACT:
provides a minimum of
or the date workwill be determined by adding
whichever is earlier.
NA
calendar days are provided. The completion date
N
NA
NA calendar days to NA
The project completion date is . The Department10/20/2018 *
working days. The Department will begin charging workingNA
or the date work begins on the project site, whichever is earlier.days beginning NA
*THE OCTOBER 20, 2018 COMPLETION DATE IS FOR ALL WORK. LIQUIDATED DAMAGES FOR FAILURE TOCOMPLETE WORK BY THIS DATE WILL BE PURSUANT TO STANDARD SPECIFICATION 108.07.
AN INTERIM COMPLETION DATE OF AUGUST 18, 2018 IS FOR ALL WORK TO COMPLETE THE 8TH AVENUESW CORRIDOR. NO WORK WILL BE ALLOWED ON 8TH AVENUE SW UNTIL MAY 29, 2018. LIQUIDATEDDAMAGES FOR FAILURE TO COMPLETE THIS WORK BY AUGUST 18, 2018 WILL BE CHARGED AT A RATEOF $900.00 PER CALENDAR DAY.
REFER TO NOTE 100-P02 SCHEDULING FOR DETAILS OF ADDITIONAL TIME REQUIREMENTS.
8th Avenue SW
7th Street SE
Winter Show Road
0.713
0.438
0.215
0.713
0.438
0.215
5th Avenue NE
7th Street SE
8th Avenue SW
East Main St
West M
ain St
August 2017
2.254 2.254Total
DESIGNER
DESIGNER
DESIGNER
DESIGNER
DESIGNER
Michael Strom
Jacob Loegering
Sta. 10+00
Begin 5th Ave NE
Sta. 52+66
End 5th Ave NE
Sta. 310+00
Begin Winter Show Road
Sta. 209+21
Begin 8th Ave SW
Sta. 247+30
End 8th Ave SW
Chad A. Petersen /s/
CASS
RIC
HLA
ND
RANSOM
SARGENTDICKEY
BARNES
KIDDER
LOGAN
MC IN
TOSH
BU
RLEIG
H
MORTON
GRANT
SIOUXADAMS
HETTINGER
SLOPE
BOWMAN EM
MO
NS
OLIVER
MERCER
STARKBIL
LIN
GS
DUNN
MC KENZIE
MC LEAN
SHERID
AN
WELLS
EDDY
FOSTER
GRIG
GS
STEELE
TRAILL
DIVIDE
WILLIAMS
BURKE
MO
UNTR
AIL
RE
NVIL
LE
WARD
MC H
EN
RY
BOTTINEAU
ROLLE
TTE
TO
WNER
CAVALIER
RA
MSEY
WALSH
PE
MBIN
A
NELS
ONBENSONP
IER
CE
STUTSMAN
STATE COUNTY MAP
FORKS
GRAND
VA
LLE
Y
GO
LD
EN
LAMOURE
5th Avenue NE 0.888 0.888
July 2017
KLJC 2017
(701) 845-4980, FAX (701) 845-0252VALLEY CITY, ND 58072-0937
P.O. BOX 9371010 4th AVENUE SW
NUMBER SU-2-990(054)058
PLANS FOR FEDERAL AID PROJECT
CITY OF VALLEY CITY, NORTH DAKOTA
________________________Surveyed & Designed Date
________________________PS&E Corrections Made
11
4884
SU-2-990(054)058 21845
Concrete Pavement Repairs, Curb and Gutter, and Incidentals
7th Street SE, and Winter Show Road
KLJ
PE-4884
Chad A. Petersen
10/30/17
10/30/17
Revised 10/30/17STATE PROJECT NO.
ND
PCNNO.
SHEET
NO.
SECTION
CERTIFICATION
LAWS OF THE STATE OF NORTH DAKOTA.
DULY REGISTERED PROFESSIONAL ENGINEER UNDER THE
ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A
I HEREBY CERTIFY THAT THESE PLANS WERE PREPARED BY
REGISTRATION NUMBER ______________DATE ______________
__________________________________________
JOB #22
Project
Miles
Gross
Miles
Net
PROJECT LENGTH
effective on the date the project is advertised.
Department of Transportation and the Supplemental Specifications
2014 Standard Specifications adopted by the North Dakota
GOVERNING SPECIFICATIONS
document is stored at the
on and the original
PE- ,
Registration Number
issued and sealed by
This document was originally
Office of KLJ in
Valley City, ND
5th Avenue NE, 8th Avenue SW,
Winter Show RoadSta. 321+37
End Winter Show Road
Sta. 431+03
End 7th St SE
Sta. 409+43
Begin 7th St SEEXIT 292
STATE PROJECT NO.SECTION
NO.
SHEET
NO.
10/19/2017 1:17:51 PM zachvlaminck
ND 2
SU-2-990(054)058
Revised 10/25/2017
TABLE OF CONTENTS 1
.. .. ....
Section Page(s) Description
PLAN SECTIONS
1 Title Sheet1
2 Table of Contents1
4 Scope of Work1 - 3
6 Plan Notes1
8 Estimate of Quantities1
11 Concrete Pavement Data Sheets1 - 10
11 Striping Data Sheets11
20 Concrete Pavement Repair Detail1 - 5
20 Spall Repair Detail6
20 Pavement Reinforcing Detail at Pipe Locations7
20 Floating Manhole Details8
30 Typical Sections1 - 2
100 Traffic Control Devices List1
100 Traffic Control Layouts2 - 7
Number Description
LIST OF STANDARD DRAWINGS
NDDOT AbbreviationsD-101-1, 2 & 3
NDDOT Utility Company and Organization AbbreviationsD-101-10
Line StylesD-101-20, 21
SymbolsD-101-30, 31 & 32
Breakaway Systems For Construction Zone Signs - Perforated TubeD-704-7
Breakaway Systems For Construction Zone Signs - U-Channel PostD-704-8
Construction Sign Details - Terminal And Guide SignsD-704-9
Construction Sign Details - Warning SignsD-704-11
Barricade And Channelizing Device DetailsD-704-13
Construction Sign Punching And Mounting DetailsD-704-14
Road Closure LayoutsD-704-15
Road Closure And Lane Closure On A Two Way Road LayoutsD-704-19
Terminal And Seal Coat Sign LayoutsD-704-20
Construction Truck And Temporary Detour LayoutsD-704-22
Lane Closures On Urban Streets LayoutsD-704-25
Miscellaneous Sign LayoutsD-704-26
Portable Sign Support AssemblyD-704-50
Pavement Marking Message DetailsD-762-1
Pavement MarkingD-762-4
Number Description
SPECIAL PROVISIONS
SP 5184(14) Permits and Environmental Considerations
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
4884
DRWN. BY CHK’D. BY PROJECT NO.
KLJC 2017
ZV MS 5417110
CITY OF VALLEY CITY, NORTH DAKOTA
SCOPE OF WORK
SU-2-990(054)058
SU-2-990(054)058 4 2
Main St
NW
2nd A
ve S
W
8TH AVE SE &
WINTER SHOW ROAD
3rd A
ve S
W
6th St S
W
5th St S
W
4th St S
W
Interstate 9
4
Exit 2
92
8th
Ave SW
Winter S
ho
w R
oad
Sheyenne River
Rivervie
w Drive
Rivervie
w Driv
e
4th Ave SW
Vikin
g Drive
Vikin
g Drive
9th Ave SW
5th St S
W
3rd A
ve S
W
2nd A
ve S
W
7th Ave SW
8th Ave SW
5th Ave SW
6th St S
W
6th Ave SW
5th St S
W
Vikin
g Drive
College St
Sta. 321+37
End Winter Show Road
Sta. 247+30
End 8th Ave SW
Cenex
Petro ServeWellness Cente
r
Washington School
WheelWagon
InnAmeric
FordStout Ross
210
+00
215
+00
220
+00
225
+00
230
+00
235
+00
240
+00
245
+00
Sta. 310+00
Begin Winter Show Road
Sta. 209+21
Begin 8th Ave SW
310+00
315+0
0
320+0
0
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
10/19/2017 zachvlaminck P:\City\ND\ValleyCity\5417110\CAD\Design\Plans\Addendum #1\004SW_03.dgn1:22:07 PM
Valley City, ND
Office of KLJ in
document is stored at the
on and the original
PE- ,
Registration Number
issued and sealed by
This document was originally
Chad A. Petersen
Concrete Pavement Repair
10/25/17
Revised 10/25/17
DRWN. BY CHK’D. BY PROJECT NO.
KLJC 2017
ZV MS 5417110
CITY OF VALLEY CITY, NORTH DAKOTA
SCOPE OF WORK
SU-2-990(054)058
7TH ST SE
7th St NE
12th A
ve S
E
10th A
ve S
E
9th A
ve S
E
Valley Ave SE
6th St SE
Interstate 9
4
11th A
ve S
E
12th A
ve S
E
10th St SE
Electri
cCass C
ounty
Sta. 409+43
Begin 7th St SE
Sta. 431+03
End 7th St SE
410
+00
415
+00 420
+00
425
+00
430
+00
Concrete Pavement Repair
John D
eere
Malach
4884
SU-2-990(054)058 4 3
Chad A. Petersen
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
10/30/2017 zachvlaminck P:\City\ND\ValleyCity\5417110\CAD\Design\Plans\Addendum #1\004SW_04.dgn8:41:45 AM
Valley City, ND
Office of KLJ in
document is stored at the
on and the original
PE- ,
Registration Number
issued and sealed by
This document was originally
Revised 10/30/17
10/30/17
PLAN NOTES
SU-2-990(054)058
JM JL 5417110
KLJ 2017
DRWN. BY CHKD. BY PROJECT NO.
This document was originally issued and sealed by
Chad A. Petersen Registration Number
PE- 4884, on 10/30/17 and the original
document is stored at the Office of KLJ in Valley City, ND
PLAN NOTES
10/30/2017 2:36:18 PM mike strom P:\City\ND\ValleyCity\5417110\CAD\Design\Plans\Addendum #1\006NT_01.doc
Revised 10/30/17 STATE PROJECT NO.
SECTION NO.
SHEET NO.
ND SU-2-990(054)058 6 1
100-P01 NOISE RESTRICTION: Limit work to Monday through Friday from 7 AM to 10 PM, Saturday from 7 AM to 7 PM and on Sundays by permission only.
The Contractor is allowed to green saw the concrete without written permission from the Engineer if the
following stipulations are met: Prior to the start of construction provide one written notice to all property owners within 500 feet of the project site. The notice shall warn that increased noise levels may be experienced at night. Use best practices to minimize the sawing of concrete pavement between the hours of 10:00 PM to 7:00 AM.
100-P02 SCHEDULING: Work on 5th Avenue NE cannot take place at the same time as the following events are
scheduled along Central Avenue in 2018:
- June 2nd - June 3rd Sheyenne Valley Soap Box Derby - June 15th – June 17th Rally in the Valley - July 25th Crazy Days
Work on Winter Show Road and 8th Avenue SW cannot take place at the same time. The intersection work can take place at the same time as either of the streets. Do not begin work on 8th Avenue SW until May 29th. Complete all work on the 8th Avenue SW corridor by August 18th. Complete all remaining work on the other corridors by October 20, 2018.
100-P03 PROJECT COORDINATION: The Valley City Permanent Flood Protection Phase 2 involves closing Main Street for up to 11 months. The contractor shall adjust and coordinate detours with this project.
107-P01 MAINTAINING ACCESS: The Contractor will be responsible for providing reasonable access to all
residential dwellings and commercial properties adjacent to this project. Any special conditions that arise will be worked out by the Contractor with the Engineer in the field. Some additional traffic control signs have been provided to allow access to these special cases should they arise.
430-P01 PATCHING: Patch asphalt pavement surface adjacent to concrete patches using a commercially produced
Superpave FAA 43. Remove pavement full depth, clean, tack and fill existing irregularities in no larger than 2.5-inch lifts in the roadway with hot mix asphalt and compact in a separate operation. The pavement thickness shall match the existing but must be a minimum of 4 inches thick. All hot mix asphalt required for patching will be measured and paid for by the ton of “PATCHING”. This will be considered full payment for performing this work.
430-P02 COMPACTION: Ordinary compaction, as specified in Section 430.04 I.3, will be utilized. 430-P03 TACK COAT: Supply a tack coat that meets the requirements of Section 401.03 B “Tack Coat”. Apply the
tack coat according to Section 401.04 “Construction Requirements”. Undiluted application rates are shown in the basis of estimate. Tack coat will not be measured for payment and will be included in the unit price bid for “PATCHING”.
570-P01 CONCRETE PAVEMENT REPAIR: An additional 10% has been added to the quantities for "CONC PVMT
REPAIR-SPOT FULL DEPTH", “SPALL REPAIR-PARTIAL DEPTH”, “RANDOM PCC CRACK CLEANING & SEALING” and ”DOWEL BARS” to be used as directed by the Engineer.
570-P02 TRANSVERSE AND LONGITUDINAL JOINTS CLEANING AND SEALING: Existing backer rod or rubber
tuck joint sealant shall be cut off where “CONC PVMT REPAIR-SPOT FULL DEPTH" and “SPALL REPAIR-PARTIAL DEPTH” repairs are adjacent to a joint. The existing joint sealant material shall be cleaned off prior to placement of concrete. All joints adjacent to and within repairs shall be sealed with Type IV Hot applied Joint Sealant as per NDDOT Standard Specifications 826.02 A.2.
570-P03 CONCRETE PAVEMENT REPAIR: During removal of the pavement the aggregate may get disturbed. 1 inch
of “AGGREGATE BASE COURSE CL 5” has been quantified. 570-P04 CONCRETE PAVEMENT REPAIR: The pavement thickness varies per street. All patching shall match
existing pavement depth. Pavement depths are noted in Section 30 Typical Sections. All Dowel Bars and Transvers Bars shall match Section 20 Details.
570-P05 CONCRETE PAVEMENT REPAIR: All full depth concrete pavement repair shall have dowel bars and
baskets placed regardless of the existing pavement’s design.
704-P01 TRAFFIC CONTROL DEVICES: The Contractor shall furnish the necessary signing as shown on Standard Drawings: D-704-15, 19 20, 22, 25 and 26 under Type A, G, K, N, V W, X, EE, and GG as required by construction operations.
Place stackable vertical panels adjacent to open lanes in areas of full-depth removals. Place the panels at 10 foot intervals, with a minimum of 2 panels per full depth removal area. Leave the panels in place until the newly placed concrete is strong enough to be opened to traffic.
Place Type 1 Barricades in front of each open full depth repair or as directed by the Engineer.
Lane closures will only be allowed while work is being performed or until the concrete has cured to the
required design strength. Place tubular markers or permanent pavement markings prior to moving or removing lane closures.
704-P02 TRAFFIC CONTROL: Traffic control signs and delineators have been provided to accommodate a closure of
half of the street for approximately 8 blocks with a temporary traffic signalized begin and end. Traffic shall be routed to half of the street while repairs take place on the other half. A truck detour must be set up for 8th Ave SW and 5th Ave NE. An example detour for 8th Ave has been provided.
All signs and devices will be paid for once. Moving traffic control within the same or to different streets will not be paid for but is included in the items bid for traffic control. Devices will only be paid for if they are used on the project. Alternate traffic control layouts are included in the plans. An option to close 8 blocks at a time is included in the traffic control sheets. Multiple streets will be allowed to be closed at the same time. This option cannot be used at the same time on 8th Ave SW and Winter Show Rd. The Contractor must provide the Engineer with a traffic control phasing plan at the pre-construction meeting. Temporary traffic signals have been included to maintain single file traffic. In section 100 sheet 6, a detail sheet gives an example for the intersection of 8th Ave SW and Winter Show Road. Four (4) temporary traffic signals and their given advanced warning signs have been provided in the plans. The contractor shall determine how and where to use the signals and signs in their traffic control phasing plan. Obtain an electrical source for temporary traffic signals. Solar or generator powered signals may be used. If generators are used, place them as far as possible from the roadway centerline, unless the generator and signal are part of a trailer mounted unit. Include all costs to install, operate and remove a wood pole/span wire signal system or portable signal system in the contract unit price for “TEMPORARY TRAFFIC SIGNAL”.
722-P01 UTILITY ADJUSTMENTS: Adjust the Manholes and Gate Valve Boxes to the proposed finish grades under the appropriate bid items. Manholes and Gate Valve adjustments must be made by methods approved by the City of Valley City. Include all work related to the adjustment of Manholes and Gate Valve Box in the price bid for “ADJUST GATE VALVE BOX” and “ADJUST MANHOLE”.
722-P02 ADJUST MANHOLE: A floating casting shall be used in as many locations as possible as per Section 20
Sheet 8. When there isn’t room to install a floating casting, a new standard casting shall be used. All existing castings shall be cleaned of concrete, salvaged and stockpiled at a site determined by the City Public Works. Call 701-845-4255 to coordinate the site.
748-P01 CURB & GUTTER-TYPE I: The Engineer will determine the location and actual quantity of “CURB & GUTTER-TYPE I” used for patching. Curb areas where concrete fillets are incorporated with the curb, shall be measured and paid for as "CONC PVMT REPAIR-SPOT FULL DEPTH" outside of the typical 18” gutter pan. The concrete depth at the fillets must match the existing depth of the adjacent concrete.
Some curb patches are adjacent to or run through inlets.
In these areas, the inlet castings are to remain in place. If the backing of the inlet hood is encased in concrete, the concrete should be removed and replaced. Payment for all work shall be included in the cost of “CURB & GUTTER-TYPE I” and shall be measured through the inlets.
DRWN. BY CHK’D. BY PROJECT NO.
KLJC 2017
ESTIMATE OF QUANTITIES
SU-2-990(054)058
JN MS
CITY OF VALLEY CITY, NORTH DAKOTA
5417110
SPEC CODE ITEM DESCRIPTION UNIT TOTAL
PARTICIPATING
TOTAL
PARTICIPATING
NON-
TOTAL
103 0100 CONTRACT BOND L SUM 0.5 0.5 1.0
202 0130 REMOVAL OF CURB & GUTTER LF 263 178 441
302 0120 AGGREGATE BASE COURSE CL 5 TON 672 1,019 1,691
430 2000 PATCHING TON 10 15 25
570 0240 DOWELED CONTRACTION JOINT ASSEMBLY LF 244 996 1,240
570 0424 DOWEL BARS EA 1,486 994 2,480
570 0700 CONC PVMT REPAIR-SPOT FULL DEPTH SF 13,433 20,372 33,805
570 0966 RANDOM PCC CRACK CLEANING & SEALING LF 1,176 17 1,193
570 1512 SPALL REPAIR-PARTIAL DEPTH SF 1,668 798 2,466
702 0100 MOBILIZATION L SUM 0.5 0.5 1.0
704 1000 TRAFFIC CONTROL SIGNS UNIT 3,285 589 3,874
704 1050 TYPE I BARRICADE EA 20 0 20
704 1052 TYPE III BARRICADE EA 60 14 74
704 1060 DELINEATOR DRUMS EA 94 0 94
704 1080 STACKABLE VERTICAL PANELS EA 40 0 40
704 1500 OBLITERATION OF PAVEMENT MARKING SF 6,157 1,157 7,314
722 6140 ADJUST GATE VALVE BOX EA 1 2 3
722 6200 ADJUST MANHOLE EA 10 5 15
748 0140 CURB & GUTTER-TYPE I LF 263 178 441
762 0112 EPOXY PVMT MK MESSAGE SF 746.5 0.0 746.5
762 0113 EPOXY PVMT MK 4IN LINE LF 3,132 3,232 6,364
762 0114 EPOXY PVMT MK 6IN LINE LF 4,422 0 4,422
762 0115 EPOXY PVMT MK 8IN LINE LF 527 0 527
762 0117 EPOXY PVMT MK 24IN LINE LF 902 40 942
772 2810 TEMPORARY TRAFFIC SIGNAL EA 4 0 4
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
10/19/2017 zachvlaminck P:\City\ND\ValleyCity\5417110\CAD\Design\Plans\Addendum #1\008QS_01.dgn4:36:11 PM
SU-2-990(054)058 8 1
Revised 10/25/17
DRWN. BY CHK’D. BY PROJECT NO.
KLJC 2017
SU-2-990(054)058
JN MS
CITY OF VALLEY CITY, NORTH DAKOTA
5417110
CONCRETE PAVEMENT
DATA SHEETS
8th Avenue SW (Participating)
Station Side Offset
Start
(Length x Width)
Spall Repair
(Length x Width)
Concrete Pavement Repair
Crack (LF)
Route and Seal
(LF)
Curb & GutterManhole
Adjust
Valve (EA)
Adjust Gate
Panel
Reinforced
209+21 RT 10’ 2’ x 2’
209+23 RT 0’ 20’ x 20.5’
209+34 LT 12’ 2’ x 2’ 15
209+50 LT 3’ 2’ x 2’
209+52 RT 18’ 2’ x 2’
209+58 LT 20’ 3’ x 3’
209+77 RT 18’ 2’ x 2’
209+79 RT 0’ 6’ x 12’
209+81 RT 12’ 26’ x 8.5’
209+81 LT 18’ 5’ x 2’
210+00 Intersection Winter Show Road & 8th Ave SW
210+17 LT 0’ 3’ x 2’
210+18 LT 18’ 2’ x 2’
210+20 RT 18’ 2’ x 2’
210+33 RT 0’ 2’ x 2’
210+44 RT 18’ 2’ x 2’
210+44 RT 13’ 2’ x 2’
210+51 RT 18’ 8’ x 2’
210+57 RT 12’ 2’ x 2’
210+59 RT 18’ 3’ x 2’
210+70 RT 3’ 4’ x 9’
210+83 RT 6’ 2’ x 6’
210+83 RT 12’ 2’ x 2’
210+85 RT 10’ 15’ x 4’
210+96 LT 7’ 2’ x 5’
210+98 RT 10’ 2’ x 2’
212+11 RT 3’ 2’ x 2’
212+23 RT 12’ 2’ x 2’
212+82 RT 3’ 2’ x 3’
212+82 RT 12’ 2’ x 2’
212+84 RT 12’ 2’ x 4’
212+97 RT 0’ 2’ x 12’
212+97 RT 12’ 2’ x 3’
213+08 RT 1’ 2’ x 4’
213+26 RT 3’ 2’ x 4’
213+26 RT 12’ 2’ x 4’
213+36 RT 12’ 2’ x 3’
213+48 RT 12’ 2’ x 2’
213+61 RT 12’ 2’ x 2’
213+74 RT 12’ 2’ x 3’
213+86 LT 0’ 2’ x 3’
213+86 RT 9’ 2’ x 3’
213+88 RT 3’ 2’ x 2’
213+88 RT 7’ 2’ x 2’
214+23 RT 4’ 2’ x 3’
214+25 RT 4’ 3’ x 3’
214+38 LT 0’ 2’ x 3’
214+63 RT 0’ 2’ x 2’
214+63 RT 4’ 2’ x 2’
214+74 RT 2’ 2’ x 2’
214+76 RT 4’ 2’ x 2’
215+11 LT 0’ 2’ x 8’
215+26 RT 12’ 15’ x 8.5’
215+52 RT 18’ 3’ x 2’
215+52 RT 2’ 2’ x 2’
215+62 LT 0’ 20
215+65 RT 10’ 2’ x 2’
4884
SU-2-990(054)058 411
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
10/19/2017 zachvlaminck P:\City\ND\ValleyCity\5417110\CAD\Design\Plans\Addendum #1\011DT_01.dgn1:50:58 PM
Valley City, ND
Office of KLJ in
document is stored at the
on and the original
PE- ,
Registration Number
issued and sealed by
This document was originally
Chad A. Petersen
10/25/17
Revised 10/25/17
DRWN. BY CHK’D. BY PROJECT NO.
KLJC 2017
SU-2-990(054)058
JN MS
CITY OF VALLEY CITY, NORTH DAKOTA
5417110
CONCRETE PAVEMENT
DATA SHEETS
8th Avenue SW (Participating)
Station Side Offset
Start
(Length x Width)
Spall Repair
(Length x Width)
Concrete Pavement Repair
Crack (LF)
Route and Seal
(LF)
Curb & GutterManhole
Adjust
Valve (EA)
Adjust Gate
Panel
Reinforced
215+76 RT 12’ 7’ x 8.5’ Reinforced
215+76 LT 14’ 2’ x 2’
215+96 LT 18’ 2’ x 2’
215+96 RT 4’ 2’ x 2’
215+96 RT 0’ 13’ x 20.5’
215+96 RT 27’ 20
216+09 RT 12’ 2’ x 4’
216+09 RT 0’ 26’ x 12’
216+18 Intersection Riverview Drive & 8th Ave SW
216+48 RT 0’ 3’ x 2’
216+48 RT 14’ 8’ x 2’
216+61 LT 13’ 2’ x 3’
216+61 RT 14’ 36’ x 2’
217+00 RT 8’ 2’ x 4’
217+00 RT 12’ 2’ x 5’
217+12 RT 3’ 2’ x 2’
217+14 RT 9’ 2’ x 3’
217+14 RT 12’ 2’ x 3’
217+17 RT 12’ 3’ x 2’
217+26 RT 10’ 2’ x 2’
217+28 RT 10’ 2’ x 2’
217+28 RT 12’ 2’ x 2’
217+32 RT 12’ 2’ x 2’
217+42 RT 2’ 2’ x 2’
217+42 LT 6’ 2’ x 2’
217+44 LT 2’ 2’ x 7’
217+56 RT 0’ 2’ x 2’
217+78 RT 8’ 2’ x 2’
217+91 RT & LT 0’ 26’ 41’ 52
220+07 LT 10’ 2’ x 2’
220+07 LT 12’ 15’ x 8.5’
220+51 RT 12’ 13’ x 8.5’
221+98 LT 18’ 2’ x 2’
222+00 LT 0’ 14’ x 12’
222+00 RT 0’ 14’ x 20.5’
222+14 RT 12’ 15’ x 8.5’
225+92 RT 18’ 2’ x 2’
225+92 RT 9’ 2’ x 2’
225+92 LT 20’ 10
226+05 LT 6’ 13’ x 14.5’ Reinforced
226+16 Intersection Viking Drive & 8th Ave SW
228+74 LT 23’ 2’ x 2’
228+76 LT 11’ 7’ x 7’ 1 Reinforced
230+57 RT 6’ 2’ x 3’
230+90 LT 4’ 2’ x 8’
231+29 Intersection 6th St SW & 8th Ave SW
231+29 LT 0’ 12
231+35 LT 13’ 15
232+31 RT 7’ 29
234+26 LT 20’ 15
234+94 Intersection 5th St SW & 8th Ave SW
234+94 RT & LT 0’ 10’ x 24’ Reinforced
236+66 LT 0’ 12
236+78 CL 0’ 7’ x 7’ 1
238+27 LT 12’ 15’ x 8.5’ 15 Reinforced
238+27 RT 12’ 41’ x 8.5’ Reinforced
238+57 LT 0’ 21’ x 12’ Reinforced
4884
SU-2-990(054)058 511
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
10/19/2017 zachvlaminck P:\City\ND\ValleyCity\5417110\CAD\Design\Plans\Addendum #1\011DT_01.dgn1:50:03 PM
Valley City, ND
Office of KLJ in
document is stored at the
on and the original
PE- ,
Registration Number
issued and sealed by
This document was originally
Chad A. Petersen
Revised 10/25/17
10/25/17
DRWN. BY CHK’D. BY PROJECT NO.
KLJC 2017
SU-2-990(054)058
JN MS
CITY OF VALLEY CITY, NORTH DAKOTA
5417110
CONCRETE PAVEMENT
DATA SHEETS
8th Avenue SW (Participating)
Station Side Offset
Start
(Length x Width)
Spall Repair
(Length x Width)
Concrete Pavement Repair
Crack (LF)
Route and Seal
(LF)
Curb & GutterManhole
Adjust
Valve (EA)
Adjust Gate
Panel
Reinforced
238+57 RT 20’ 2’ x 3’ Reinforced
238+84 Intersection 4th St SW & 8th Ave SW
239+00 RT & LT 20’ 16
239+93 RT 0’ 2’ x 2’
240+62 LT 0’ 14’ x 12’ 1 Reinforced
240+74 Intersection 3rd St SW & 8th Ave SW
240+74 CL 7’ x 7’ 1 Reinforced
240+76 LT 23’ 18’ x 17’ 1 Reinforced
244+31 RT 20’ 6
244+31 LT 20’ 6
244+44 RT 0’ 14’ x 12’ 1 Reinforced
244+47 CL 12 1
244+54 Intersection 2nd St SW & 8th Ave SW
244+54 LT 20’ 2’ x 2’
245+11 RT 0’ 3
246+67 LT 12’ 14’ x 8.6’ 12
246+73 RT 0’ 1
247+01 LT 20’ 22.5’ x 7’ Reinforced
4884
SU-2-990(054)058 611
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
10/19/2017 zachvlaminck P:\City\ND\ValleyCity\5417110\CAD\Design\Plans\Addendum #1\011DT_01.dgn1:51:21 PM
Valley City, ND
Office of KLJ in
document is stored at the
on and the original
PE- ,
Registration Number
issued and sealed by
This document was originally
Chad A. Petersen
Revised 10/25/17
10/25/17
DRWN. BY CHK’D. BY PROJECT NO.
KLJC 2017
SU-2-990(054)058
JN MS
CITY OF VALLEY CITY, NORTH DAKOTA
5417110
CONCRETE PAVEMENT
DATA SHEETS
Winter Show Road (Participating)
Station Side Offset
Start
(Length x Width)
Spall Repair
(Length x Width)
Concrete Pavement Repair
Crack (LF)
Route and Seal
(LF)
Curb & GutterManhole
Adjust
Valve (EA)
Adjust Gate
Panel
Reinforced
310+00 Intersection 8th Ave SW & Winter Show Road
310+21 RT 20’ x 29’ x 26’
310+21 LT 0’ 5’ x 2’
310+21 LT 56’ 3.5’ x 3’
310+25 RT 20’ 5’ x 2’
310+42 LT 18’ 2’ x 2’
310+44 RT 18’ 3’ x 2’
310+70 LT 35’ 2’ x 2’
310+70 RT 12’ x 13’ x 8.5’ 13
310+73 LT 18’ 4’ x 2’
310+77 LT 20’ x 5
310+80 RT 12’ 3’ x 2’
310+81 RT 10’ 3’ x 2’
310+83 LT 18’ x 2’ x 2’
310+83 RT 12’ x 15’ x 8.5’
310+83 RT 0’ x 15’ x 12’
310+83 LT 0’ x 17’ x 12’
310+98 LT 12’ x 14’ x 8.5’
311+26 RT 12’ x 4
311+36 LT 10’ 3’ x 2’
311+52 RT 12’ 5’ x 2’
311+61 RT 10’ 4’ x 2’
311+63 RT 5’ 2’ x 2’
311+65 RT 5’ 2’ x 2’
311+65 RT 10’ 6’ x 2’
311+65 RT 12’ 6’ x 2’
311+87 RT 12’ 5’ x 2’
311+94 RT 12’ 6’ x 2’
311+98 RT 10’ 2’ x 2’
312+03 RT 12’ x 16’ x 8.5’ 16
312+16 RT 0’ 2’ x 2’
312+20 RT 12’ 4’ x 2’
312+37 RT 12’ 5’ x 2’
312+40 RT 5’ 2’ x 2’
312+46 RT 12’ 2’ x 2’
312+51 RT 10’ 4’ x 2’
312+51 RT 12’ 4’ x 2’
312+55 RT 10’ 2’ x 2’
312+55 RT 12’ 2’ x 2’
312+56 LT 10’ 2’ x 2’
312+61 RT 12’ 2’ x 2’
312+74 LT 20’ x 13
312+91 RT 10’ 2’ x 2’
313+06 LT 20’ x 5
313+32 RT 12’ 9’ x 3’
313+56 RT 0’ 2’ x 2’
313+65 RT 12’ x 8
313+65 RT 18’ 10’ x 2’
313+66 RT 0’ 7’ x 2’
313+71 RT 10’ 2’ x 2’
313+73 RT 20’ x 7
313+73 RT 18’ 7’ x 2’
313+92 RT 18’ 2’ x 2’
313+96 RT 1’ 2’ x 2’
314+11 RT 12’ 7’ x 2’
314+35 RT 1’ 2’ x 2’
314+74 RT 0’ 2’ x 8’
314+82 RT 12’ 3’ x 2’
314+98 RT 4’ 2’ x 2’
4884
SU-2-990(054)058 711
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
10/19/2017 zachvlaminck P:\City\ND\ValleyCity\5417110\CAD\Design\Plans\Addendum #1\011DT_01.dgn1:51:54 PM
Valley City, ND
Office of KLJ in
document is stored at the
on and the original
PE- ,
Registration Number
issued and sealed by
This document was originally
Chad A. Petersen
10/25/17
Revised 10/25/17
DRWN. BY CHK’D. BY PROJECT NO.
KLJC 2017
SU-2-990(054)058
JN MS
CITY OF VALLEY CITY, NORTH DAKOTA
5417110
CONCRETE PAVEMENT
DATA SHEETS
Winter Show Road (Participating)
Station Side Offset
Start
(Length x Width)
Spall Repair
(Length x Width)
Concrete Pavement Repair
Crack (LF)
Route and Seal
(LF)
Curb & GutterManhole
Adjust
Valve (EA)
Adjust Gate
Panel
Reinforced
315+00 RT 4’ 2’ x 5’
315+08 RT 10’ 5’ x 2’
315+11 RT 3’ 2’ x 4’
315+13 RT 5’ 2’ x 2’
315+19 RT 10’ 2’ x 2’
315+24 RT 5’ 2’ x 2’
315+26 RT 5’ 2’ x 2’
315+43 RT 18’ 2’ x 2’
315+47 RT 20’ x 15’ x 4’ 18
315+56 RT 12’ x 7.5’ x 8.5’
315+64 RT 12’ x 12.7’ x 8.5’
315+64 RT 0’ x 12.7’ x 12’
315+64 LT 0’ x 12.7’ x 12’
315+64 LT 12’ x 12.7’ x 8.5’
315+67 RT 23’ x 10’ x 3’
18.4’ 13’
315+72 RT 36’ x 13.5’ x 13’
315+85 RT 23’ x 19.5’ x 13’
316+08 RT 20’ x 15’ x 2.5’ 14
316+49 RT 0’ 2’ x 12’
316+49 RT 12’ 2’ x 6’
316+51 RT 4’ 2’ x 8’
316+51 RT 12’ 2’ x 2’
316+80 LT 4’ 2’ x 2’
316+80 RT 0’ 2’ x 3’
317+16 RT 1’ 2’ x 2’
317+28 RT 10’ 2’ x 2’
317+34 RT 10’ 4’ x 2’
317+44 RT 12’ 2’ x 2’
317+68 RT 0’ 2’ x 2’
317+94 RT 3’ 2’ x 2’
318+20 LT 0’ 2’ x 2’
318+22 RT 18’ 3’ x 2’
318+30 RT 20’ x 1’ x 5’ 7
318+61 RT 0’ 2’ x 2’
319+11 RT 5’ 2’ x 2’
319+32 RT 12’ 2’ x 2’
320+33 RT 0’ 6’ x 2’
320+41 LT & RT 0’ x 40
320+41 LT & RT 0’ x 40
320+53 RT 18’ 2’ x 2’
320+67 RT 0’ x 14’ x 12’
320+85 Intersection 4th Ave SW & Winter Show Road
321+09 RT 0’ x 20
321+24 RT 0’ x 16
321+24 RT 16’ x 2’ x 4’
4884
SU-2-990(054)058 11
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
10/19/2017 zachvlaminck P:\City\ND\ValleyCity\5417110\CAD\Design\Plans\Addendum #1\011DT_01.dgn1:52:28 PM
Valley City, ND
Office of KLJ in
document is stored at the
on and the original
PE- ,
Registration Number
issued and sealed by
This document was originally
Chad A. Petersen
8
10/25/17
Revised 10/25/17
DRWN. BY CHK’D. BY PROJECT NO.
KLJC 2017
SU-2-990(054)058
JN MS
CITY OF VALLEY CITY, NORTH DAKOTA
5417110
CONCRETE PAVEMENT
DATA SHEETS
7th Street SE (Non-Participating)
Station Side Offset
Start
(Length x Width)
Spall Repair
(Length x Width)
Concrete Pavement Repair
Crack (LF)
Route and Seal
(LF)
Curb & GutterManhole
Adjust
Gatevalve
Adjust
Panel
Reinforced
409+43 RT 0’ 13’ x 13’ Reinforced
409+76 RT 0’ 12.5’ x 6’
409+88 RT 0’ 12’ x 12’ 1
410+00 Intersection 12th Ave SE & 7th St SE
410+09 RT 37’ 12’ x 14’ Reinforced
410+09 LT 51’ 12’ x 7’
410+21 RT 37’ 6.5’ x 14’ 14
410+21 RT 51’ 6.5’ x 15’ 15
410+21 LT 51’ 5’ x 7’
410+21 RT 66’ 6.5’ x 8’ 8
410+57 LT 12’ 13’ x 7’ 2 Reinforced
410+84 RT 12’ 15’ x 6’ 15 Reinforced
410+99 RT 26
411+39 LT 12’ 14’ x 6.5’
411+45 LT 6’ 6
411+95 LT 0’ 2’ x 4’
412+38 LT 16’ 2’ x 2’
412+40 LT 0’ 2’ x 7’
412+66 LT 13’ 2’ x 5’
412+68 LT 0’ 2’ x 2’
413+08 LT 0’ 2’ x 3’
413+35 LT 15’ 2’ x 3’
413+47 LT 0’ 2’ x 4’
413+65 LT 14’ 2’ x 2’
413+93 LT 0’ 2’ x 2’
414+07 LT 0’ 13’ x 12’
414+07 RT 0’ 13’ x 12’ 1
414+07 LT 12’ 13’ x 6.5’
414+20 RT 0’ 15’ x 12’
414+83 LT 0’ 6.25’ x 18’
418+17 RT 16’ 2’ x 2’
418+70 RT 0’ 2’ x 2’
418+84 LT & RT 0’ 387’ x 24’ 1
419+58 LT 3
422+71 LT 13’ x 12’
423+21 LT & RT 0’ 12’ x 24’
423+43 LT 0’ 6’ x 18’
423+59 RT 12’ 12’ x 6’
423+59 RT 9’ 3
423+68 RT 12’ 6
423+75 RT 0’ 6’ x 2’
423+79 LT 0’ 12’ x 18’ 18
423+81 RT 0’ 11’ x 18’ 11
423+92 LT 12’ 4’ x 6’
423+92 LT & RT 0’ 60’ x 24’Reinforced
Some
424+22 LT 12’ 14’ x 7.5’ Reinforced
424+52 RT 15’ 2’ x 3’
424+75 RT 0’ 5’ x 2’
424+80 RT 0’ 2’ x 2’
424+92 LT 0’ 2’ x 2’
424+94 LT 12’ 14’ x 7’ Reinforced
425+09 LT 18’ 7
425+20 RT 16’ 2’ x 2’
425+22 RT 0’ 2’ x 2’
425+26 LT 12’ 4’ x 2’
425+29 CL 0’ 6’ x 6’ 1
426+26 LT 0’ 13’ x 12’
4884
SU-2-990(054)058 11
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
10/19/2017 zachvlaminck P:\City\ND\ValleyCity\5417110\CAD\Design\Plans\Addendum #1\011DT_01.dgn1:55:32 PM
Valley City, ND
Office of KLJ in
document is stored at the
on and the original
PE- ,
Registration Number
issued and sealed by
This document was originally
Chad A. Petersen
9
10/25/17
Revised 10/25/17
DRWN. BY CHK’D. BY PROJECT NO.
KLJC 2017
SU-2-990(054)058
JN MS
CITY OF VALLEY CITY, NORTH DAKOTA
5417110
CONCRETE PAVEMENT
DATA SHEETS
7th Street SE (Non-Participating)
Station Side Offset
Start
(Length x Width)
Spall Repair
(Length x Width)
Concrete Pavement Repair
Crack (LF)
Route and Seal
(LF)
Curb & GutterManhole
Adjust
Gatevalve
Adjust
Panel
Reinforced
426+54 RT 0’ 12’ x 12’
426+68 LT 0’ 12’ x 12’
426+68 RT 0’ 12’ x 18’
426+80 LT 0’ 14’ x 12’
426+94 LT & RT 0’ 15’ x 24’ 1
427+45 RT 18’ 40
427+45 LT 0’ 14’ x 12’
427+59 LT 0’ 26’ x 18’
427+85 LT 0’ 76’ x 12’
428+38 RT 0’ 15’ x 12’
428+51 LT 16’ 2’ x 2’
428+93 LT 15’ 2’ x 3’
428+93 RT 0’ 2’ x 2’
429+21 LT 15’ 2’ x 3’
429+37 LT 0’ 15’ x 12’
429+37 RT 0’ 29’ x 18’ 15
429+66 LT & RT 0’ 40’ x 24’
430+06 RT 0’ 13’ x 12’ Reinforced
430+32 LT 12’ 14’ x 7.75’ Reinforced
430+74 RT 0’ 29’ x 12’ 6
4884
SU-2-990(054)058 11 10
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
10/19/2017 zachvlaminck P:\City\ND\ValleyCity\5417110\CAD\Design\Plans\Addendum #1\011DT_01.dgn1:55:53 PM
Valley City, ND
Office of KLJ in
document is stored at the
on and the original
PE- ,
Registration Number
issued and sealed by
This document was originally
Chad A. Petersen
10/25/17
Revised 10/25/17
DRWN. BY CHK’D. BY PROJECT NO.
KLJC 2017
SU-2-990(054)058
JN MS
CITY OF VALLEY CITY, NORTH DAKOTA
5417110
DATA SHEETS
STRIPING
WINTER SHOW ROAD (Participating)
LENGTH QUANTITY UNIT
EPOXY PVMT MK 4IN LINE (10’ SKIP 30’ GAP) 760 190 LF
EPOXY PVMT MK 4IN LINE (DOUBLE LINE) 355 710 LF
EPOXY PVMT MK 6IN LINE (CROSS WALKS) 0 0 LF
EPOXY PVMT MK 8IN LINE (LANE MARKERS) 305 LF
EPOXY PVMT MK 24IN LINE (STOP BARS) 34 LF
EPOXY PVMT MK 24IN LINE (CONTINENTAL CROSSINGS) 0 LF
EPOXY PVMT MK MESSAGE EA
RIGHT ARROW (16 SF) 1 16
LEFT ARROW (16 SF) 0 0
STRAIGHT AND TURN (27 SF) 1 27
SCHOOL CROSSING (80 SF) 0 0
ONLY (22 SF) 0 0
TOTAL 43 SF
8TH AVENUE SW (Participating)
LENGTH QUANTITY UNIT
EPOXY PVMT MK 4IN LINE (10’ SKIP 30’ GAP) 3680 920 LF
EPOXY PVMT MK 4IN LINE (DOUBLE LINE) 0 0 LF
EPOXY PVMT MK 6IN LINE (CROSS WALKS) 771.5 1543 LF
EPOXY PVMT MK 8IN LINE (LANE MARKERS) 102 LF
EPOXY PVMT MK 24IN LINE (STOP BARS) 237 LF
EPOXY PVMT MK 24IN LINE (CONTINENTAL CROSSINGS) 276 LF
EPOXY PVMT MK MESSAGE EA
RIGHT ARROW (16 SF) 2 32
LEFT ARROW (16 SF) 2 32
STRAIGHT AND TURN (27 SF) 0 0
SCHOOL CROSSING (80 SF) 7 560
ONLY (22 SF) 0 0
TOTAL 624 SF
5TH AVENUE NE (Participating)
LENGTH QUANTITY UNIT
EPOXY PVMT MK 4IN LINE (10’ SKIP 30’ GAP) 3320 830 LF
EPOXY PVMT MK 4IN LINE (DOUBLE LINE) 241 482 LF
EPOXY PVMT MK 6IN LINE (CROSS WALKS) 1440 2880 LF
EPOXY PVMT MK 8IN LINE (LANE MARKERS) 120 LF
EPOXY PVMT MK 24IN LINE (STOP BARS) 355 LF
EPOXY PVMT MK 24IN LINE (CONTINENTAL CROSSINGS) 0 LF
EPOXY PVMT MK MESSAGE EA
RIGHT ARROW (16 SF) 1 16
LEFT ARROW (16 SF) 1 16
STRAIGHT AND TURN (27 SF) 0 0
SCHOOL CROSSING (80 SF) 0 0
ONLY (22 SF) 2 44
TOTAL 76 SF
7TH STREET SE (Non-Participating)
LENGTH QUANTITY UNIT
EPOXY PVMT MK 4IN LINE (10’ SKIP 30’ GAP) 0 0 LF
EPOXY PVMT MK 4IN LINE (DOUBLE LINE) 1616 3232 LF
EPOXY PVMT MK 6IN LINE (CROSS WALKS) 0 0 LF
EPOXY PVMT MK 8IN LINE (LANE MARKERS) 0 LF
EPOXY PVMT MK 24IN LINE (STOP BARS) 40 LF
EPOXY PVMT MK 24IN LINE (CONTINENTAL CROSSINGS) 0 LF
EPOXY PVMT MK MESSAGE EA
RIGHT ARROW (16 SF) 0 0
LEFT ARROW (16 SF) 0 0
STRAIGHT AND TURN (27 SF) 0 0
SCHOOL CROSSING (80 SF) 0 0
ONLY (22 SF) 0 0
TOTAL 0 SF
4884
SU-2-990(054)058 11 11
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
10/19/2017 zachvlaminck P:\City\ND\ValleyCity\5417110\CAD\Design\Plans\Addendum #1\011DT_01.dgn1:56:12 PM
Valley City, ND
Office of KLJ in
document is stored at the
on and the original
PE- ,
Registration Number
issued and sealed by
This document was originally
Chad A. Petersen
Revised 10/25/17
10/25/17
DRWN. BY CHK’D. BY PROJECT NO.
KLJC 2017
SU-2-990(054)058CITY OF VALLEY CITY, NORTH DAKOTA
JN MS 5417110
TYPICAL SECTIONS
Existing Curb & GutterExisting Curb & Gutter
8.5’12’12’8.5’
41’
or Valley Gutter
Existing Curb & Gutter/Mountable Curb & Gutteror Mountable Curb & Gutter
Existing Curb & Gutter
Existing 8" Non-Reinf Concrete Pavement CL AE
33’ to 48’
4.5’ to 11’12’12’4.5’ to 13’
Sta. 12+61 to 54+32
Typical Section
5th Avenue NE
Sta. 200+00 to 238+20
Typical Section
8th Avenue SW
8"-9" Non-Reinf PCC Pavement
4884
30
SU-2-990(054)058 1
STATE PROJECT NO.
ND
NO.
SHEET
NO.
SECTION
10/19/2017 zachvlaminck P:\City\ND\ValleyCity\5417110\CAD\Design\Plans\Addendum #1\030TS_001.dgn1:58:47 PM
Valley City, ND
Office of KLJ in
document is stored at the
on and the original
PE- ,
Registration Number
issued and sealed by
This document was originally
Chad A. Petersen
Revised 10/25/17
10/25/17
top related