nikhef weekly meeting

Post on 07-Jan-2016

22 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

DESCRIPTION

NIKHEF weekly meeting. 02/Nov/2011. Agustín Sánchez Losa. Analyzed data. Production: Run by Run Default cuts applied: (if not specified) If β and estimated angle errors were available min Λ : -7.0 min β: 0.05 min β: 1.0 Statistics: All runs available from 44000 to 44999 - PowerPoint PPT Presentation

TRANSCRIPT

NIKHEF weekly meeting

02/Nov/2011

Agustín Sánchez Losa

Analyzed data

• Production: Run by Run• Default cuts applied: (if not specified)

– If β and estimated angle errors were available– min Λ: -7.0– min β: 0.05– min β: 1.0

• Statistics:– All runs available from 44000 to 44999– Around 223 runs (223 files for µ and 441 for ν)– A total of 1.078.035 events analyzed:

• 861.458 out of 1.723.459 µ• 216.577 out of 316.366 ν

µ

ν

µ

ν

µ

ν

βmax=1.0

βmax=0.9

βmax=0.8

βmax=0.7

βmax=0.6

βmax=0.5

βmax=0.4

Log10(aµν)

-0.31

-0.32

-0.33

-0.35

-0.37

-0.41

-0.46

βmax=1.0

βmax=0.9βmax=0.8βmax=0.7

βmax=0.6βmax=0.5βmax=0.4

-0.31

-0.32-0.33-0.35

-0.37-0.41-0.46

Other plots

µ

ν

µ

ν

top related