1/11/33
About Nidec Corporation
• Nidec Corp (NJ, Kyoto, Japan) isone of the world’s leadingmanufacturers of electric motorsand drive solutions.
• Founded in 1973, today Nidec has a workforce of over 100,000, andachieved$17 B in net sales in FY17
• Over the last 10 years Nidec hasacquired more than 40 companies
• Industrial Solutions platform from 2010 have grown from $360 m USDto $750 m USD (FY14) – 3200people
Financially solid and ready forthe next 100 years of growth
9.9 %9,9%
8.3%
$17 B
12,9%
17,5%
19,9%34,9%
4,8%
HDD motors
Small Precision Motors
Auto
Industrial Commercial Appliance
Machinery
FY17 SALES BY PRODUCT GROUPWorkforce: 107,000Market capitalization: $28B USD
Electrical & optical
2/12/33
R&D Global excellencecenters
Production facilities
Service centers
Nidec Global R&D, Global Footprint and Service
NIS Main Locations. EU: Roche La Molière, Genova, Mi lano, Vicenza, Monfalcone, Dusseldorf, MoscowUSA: Cleveland, Houston, St. Louis MIDDLE EAST: Abu Dhabi
NIS Main Customers. High energy consumers, Oil&Gas, He avy IndustryEnergy producers: Utility scaleAutomation: metal plants, rubber plant, ropeways, cr anes, conveyors
3/13/33
Nidec Group business structure
Nidec Corporation
SPMSSmall Precision
Motors & Solutions
ACIMAppliance, Commercial
& Industrial Motors
Clothes Washer, Air Conditioner,
Pumps
EPS, Engine Cooling Fan,ABS, Seat, Window Lift
Japanese Affiliates
AMECAutomotive Motors
& Electronic Controls
Nidec CopalNidec Copal electronicsNidec ElesysNidec Global ServiceNidec MachineryNidec ReadNidec SankyoNidec SeimitsuNidec ServoNidec SimpoNidec Techno MotorNidec Tosok
4/14/33
About Nidec – NIS…
Power QualityPower Supply
Automation Systems & Controls
EncodersLV - InvertersMV & HV - Inverters
Motors & Generators
Energy Storage
5/15/33
Induction machines
� Power rating:− 150 ÷ 25,000 kW− 200 ÷ 33,000 HP
� Voltage:− up to 15 kV
� Mass:− 1,500 ÷ 120,000 kg
� Number of poles:− 2 ÷ 36
� Frame size:− 315 mm through
1120, 10, 11, 12, 13
Synchronous machines
� Power rating:− 150 ÷ 45,000 kW− 200 ÷ 60,000 HP
� Voltage:− up to 15 kV
� Mass:− 1,500 ÷ 160,000 kg
� Number of poles:− 2 ÷ 36
� Frame size:− 450 mm through
1120, 10, 11, 12, 13
Flame-proof motors
� Power rating:− 150 ÷ 4,500 kW− 200 ÷ 6,000 HP
� Voltage:− up to 15 kV
� Mass:− 1,500 ÷ 25,000 kg
� Number of poles:− 2 ÷ 20
� Frame size:− 355 ÷ 800 mm
� Cooling method:− IC 511, IC 411
DC machines
� Power rating:
− 2 ÷ 6000 kW (@ 150 rpm in tandem)
� Voltage:
− up to 1000 V
� Mass:
− 100 ÷ 110,000 kg
� Number of poles:
− 2 ÷ 24
� Frame size:
− 80 mm ÷ 24
NISProduct portfolio: Motors & Generators
6/16/33
NISProduct portfolio: MV Drives
MVA
10
20
30
40
80
2.3 kV3.3 4.16 6.0 6.6 7.2 10 11 13.8
Cascaded H-bridge
Cascaded H-bridge
Silcovert-S [LCI]
SVTNNPC
SVTH Air & Water Cooled
1.7 kV plastic IGBT
SVTN&
SVGN
NPC
21 MVA18.5
MVA13.5 MVA
12 MVA
24 MVA
4 Q4 Q
2 Q2 Q
4 Q4 Q
4 Q4 Q
70 MVA
SVTH+SVTH+
2Q = Two quadrant operation4Q = Four quadrant operation2Q = Two quadrant operation4Q = Four quadrant operation
30 MVA2 Q2 Q
1.7 kVplasti
cIGBT
SVTH-ESVTH-E
21.8 MVA
24 MVA
Only for RFQ 2016Only for RFQ 2016
11 MVA
3.3 kVplasticIGBT
SVTH+ Medium R&D Effort(available at the end of Mar)
SVTH-E Low R&D Effort(available at the end of Dec)
2
Air cooled
Water cooled
7/17/33
SizeVII & VIII
+Parallel units
GT Large
• Method of cooling: forced air, water circulation
• SW suitable for Heavy Industry• Integrated PLC• Control: FOC, Sls, V/Hz, AFE
Volta
ge [V
]
Output (kW)
525 / 690
1,5 6000
AD1000• Method of cooling: forced air • Output: 1,5-450kW (700HP @ 480V)• Power drive similar to existing GT1000/3000• SW suitable for fan and pums• Control: Sls, V/Hz
380 / 480
450
SizeVII & VIII
380 / 480
AD3000 / AD5000• Method of cooling: forced air • Power drive similar to existing GT3000/GT5000• SW suitable for Gen.Industry• Integrated PLC (GT5000)• Control: FOC, Sls, V/Hz , AFE
SizeVII & VIII
+Parallel units
AD3000 / AD5000• Method of cooling: forced air, water circulation• Power drive similar to existing serie GT3000/GT5000• SW suitable for General Industry • integrated PLC (GT5000)• Control: FOC, Sls, V/Hz, AFE
22 1250-1600
AD700• Output: 0.37.-22 kW• pumps, fan ventil.• Control: V/Hz & Sls-VC
380 / 480
SizeVII & VIII
+Parallel units with :
cart & F.O.
3200-4000
15 Sept ‘16 30Nov ‘16
2800
NISProduct portfolio: LV Drives
8/18/33
NISProduct portfolio: New Generation 1500V Inverters
Up to 5 MW - CONVERSION UNIT WITH OUTDOOR INVERTERS
DC Range 900 – 1400Vdc
Max dc input Voltage 1500Vdc
Output Frequency / THDi 50 (60) Hz / ≤ 3% (at P > 25%)
Power Factor Adjustable 0 ÷1 (lagging – leading)
Nominal Ambient Conditions
40°C &50°C - up to 2000m asl
Degree of Protection IP54
Cooling Method Air Cooled/Water cooled
Efficiency MAX (EU)98.9
- Improved 1500Vdc for PV - Next Generation for BESS
9/19/33* Herein referred to in terms of MW (PCS)
NISPV&BESS track record (Roche La Moliére, Vicenza, Mil ano)
More than 500MWh Battery Energy Storage Solutions ( BESS) installed* the SoW was PCS supply
F. Guiana12 MWh
France 54 MWh
UK45 MWh
Chad3 MWh
Germany140 MWh
Norway1,6 MWh
Maldive1.5 MWh
Mayotte2MWh
Japan6 MWh
Italy216 MWh*
Chile752 kWh
La Réunion9 MWh
10/110/33
NISPV&BESS list of References
type of contract System supplied Customer End User Plant Loc. Coupled Plant KW/kWh
Supplier PCS Batscap (BOLLORE ENERGIE) CNR Bollène 84 FR Solar Farm 500/500
Supplier PCS Aerowatt Cremhyg Grenoble 38 FR Water Pumping Station + solar farm 18/20
Supplier PCS Batscap (BOLLORE ENERGIE) Batscap Ergue Gaberic 29 FR Solar Roof (Pilot Unit) 125/125
Supplier PCS INES (CEA) INES (CEA) Le bourget du Lac FR Test bench 63
Supplier PCS SAFT ISSY Grid Issy les Moulineaux FR Frequency and voltage control 30/30
Supplier PCS SUNZIL Ecole Maternelle M'GOMBANI Mayotte FR Solar Farm + Battery storage 30/30
Supplier PCS + ESS SECHE Environnement SRD FR Frequency and voltage control 60/60
EPC PCS + ESS + PMS + Scada EDF EN EDF EN Toucan, Guyane FR Solar Farm + Battery storage 5000/5000
Supplier PCS+PMS BOSCH Braderup Braderup, Germany DE Frequency and voltage control 2000/2000
Supplier PCS + ESS + PMS + Scada AME AME Hopital St François FR Frequency and voltage control 120/120
Supplier PCS + PMS ALBIOMA ALBIOMA Leclerc, St Leu, La Réunion Island FR Solar Far + storage (Energy shifting) 1000/1000
EPC PCS + ESS + SPV + PMS + EMS + Scada AKUO Energy AKUO Energy Olmo , Corsica Island FR Solar Farm + Battery storage, (Energy shifting) 4000/4000
EPC PCS+PMS+ESS+SCADA DREWAG DREWAG Dresden, Germany DE Primary control reserve (PRC) 2000/2700
EPC PCS + ESS + SPV + PMS + EMS + Scada AKUO Energy AKUO Energy Mortella, Corsica Island FR Solar Farm + Battery storage, (Energy shifting) 7000/7000
EPC PCS + ESS + SPV + PMS + EMS + Scada EDF PEI MSS French Guyana FR Solar Farm + Battery storage, (Energy shifting) 4800/4800
EPC PCS + ESS + SPV + PMS + EMS + Scada AKUO Energy AKUO Energy Les Cèdres, La Réunion Island FR Solar Farm + Battery storage, (Energy shifting) 9000/9000
Supplier PCS + ESS + PMS + EMS + Scada AKUO Energy AKUO Energy Marie Galante, Island FR Micro grid 800/500
Supplier PCS + ESS + PMS + EMS + Scada MALDIVE Ressort MALDIVE Ressort Maldive, Island FR Micro grid 800/1500
Supplier PCS + ESS + PMS + EMS + Scada MALDIVE Ressort MALDIVE Ressort Maldive, Island FR Micro grid 800/1500
Supplier PCS + ESS + PMS + EMS + Scada QUADRAN QUADRAN Marie Galante, Island FR Wind Farm + Battery storage 250/520
Supplier PCS + ESS + PMS + Scada ZEM EIDESVIK Norway NOR Micro Grid Storage System onboard vessel Viking Queen for fuel saving 1600
Supplier PCS + ESS + PMS + Scada VALENERGIES VALENERGIES France FR Energy Storage System for building installation 80/80
Supplier ESS + PMS + Scada ZEM ENLINJESKJEMA Norway NOR Micro Grid Storage System onboard tourist vessel SeaSight 1200/1200
EPC PCS + ESS + PMS + EMS + Scada STEAG STEAG Herne, Germany DE Primary control reserve (PRC) 15000/23000
EPC PCS + ESS + PMS + EMS + Scada STEAG STEAG Walsum 9, Germany DE Primary control reserve (PRC) 15000/23000
EPC PCS + ESS + PMS + EMS + Scada STEAG STEAG Lünen, Germany DE Primary control reserve (PRC) 15000/23000
EPC PCS + ESS + PMS + EMS + Scada STEAG STEAG Bexbach, Germany DE Primary control reserve (PRC) 15000/23000
EPC PCS + ESS + PMS + EMS + Scada STEAG STEAG Weiher, Germany DE Primary control reserve (PRC) 15000/23000
EPC PCS + ESS + PMS + EMS + Scada STEAG STEAG Fenne, Germany DE Primary control reserve (PRC) 15000/23000
Supplier PCS + ESS + PMS + Scada ZEM EIDESVIK Norway NOR Micro Grid Storage System onboard vessel Viking Energy for fuel saving 2000/2000
Supplier PCS + ESS + SPV + PMS + EMS + Scada COREX Electricité de Mayotte Mayotte Island FR Solar Farm + Battery storage, (Energy shifting) 2000/2000
Supplier PCS + ESS + PMS + EMS + Scada VERGNET Electricité du Tchad Amdjarass, Tchad Tchad Micro grid 1000/3000
Supplier PCS + ESS + SPV + PMS + EMS + Scada ADVANTEC HOKUDEN OKAIDO, JAPAN JP Solar Farm + Battery storage, (Smoothing of PV Power variations) 6000/6000
Supplier ESS + PMS + Scada ZEM China CH Micro Grid Storage System onboard vessel OCV1 for fuel saving 1200/370
Supplier ESS + PMS + Scada ZEM China CH Micro Grid Storage System onboard vessel OCV2 for fuel saving 1200/370
11/111/33
NISPV&BESS list of References
type of contract System supplied Customer End User Plant Loc. Coupled Plant KW/kWh
Supplier PCS + ESS + PMS + Scada HELEXIA HELEXIA France FR Energy Storage System for building installation 3 x 100/110
EPC PCS + ESS + PMS + EMS + Scada EON EON Blackburn Meadows Sheffield, UK UK Enhanced Frequency Control 10000/7200
EPC PCS + ESS + PMS + EMS + Scada EDF EDF West Burton Retford, UK UK Enhanced Frequency Control 49000/35840
EPC PCS + ESS + PMS + EMS + Scada GRESS GRESS Martinique, French Island FR Wind Farm + Battery storage 14000/5000
Supplier ESS BORALEX BORALEX France FR Primary frequency regulation 2000/1500
EPC PCS + ESS + PMS + EMS + Scada ENERCAL ENERCAL new Caledonia FR Solar Farm + Battery storage, (Smoothing of PV Power variations) 10000/8000
EPC PCS + ESS + PMS + Scada VALOREM VALREA Guadeloupe, French Island FR Wind Farm + Battery storage 16000/5300
Supplier PCS + ESS + PMS + Scada POWIDIAN POWIDIAN France FR Li Storage unit for Test bench with hydrogen storage 100/100
EPC PCS + ESS + SPV + PMS + Scada CORSICA SOLE CORSICA SOLE Guirone, Corsica Island FR Solar Farm + Battery storage, (Energy shifting) 5000/5000
Supplier PCS + ESS + SPV + PMS + EMS + Scada SUNZIL SUNZIL Nukutepipi, French Polynesia FR Micro grid 150/200
EPC PCS + ESS + PMS + Scada QUADRAN QUADRAN Boulouparis, new Caledonia FR Solar Farm + Battery storage, (Smoothing of PV Power variations) 8000/9500
EPC PCS + ESS + PMS + Scada NW Energies NW Energies Jonzac, France FR Primary frequency regulation 1000/900
EPC PCS + ESS + PMS + Scada QUADRAN QUADRAN Fonds Caraïbes, Guadeloupe FR Solar Farm + Battery storage, (Smoothing of PV Power variations) 3000/3500
EPC PCS + ESS + PMS + Scada QUADRAN QUADRAN Terre de Bas, Guadeloupe FR Solar Farm + Battery storage, (Smoothing of PV Power variations) 1500/1500
Supplier ESS + PMS + Scada ZEM Westcon Norway NOR Micro Grid Storage System onboard tourist vessel SeaSight III 3588/1794
Supplier ESS + PMS + Scada ZEM Westcon Norway NOR Micro Grid Storage System onboard 2242/1121
EPC PCS + ESS + PMS + Scada QUADRAN EOLE La Montagne, Guadeloupe FR WindFarm + Battery storage, (Smoothing of PV Power variations) 7300/4000
EPC PCS + ESS + PMS + Scada NEOEN NEON Azur, France FR Primary frequency regulation 6000/6000
PCS PCS : Power conversion system NOTE : In yellow Energy Storage System > 2MW - 2MWh
ESS ESS : Ennergy storage system
SPV SPV : Solar conversion system
PMS PMS : Power management system
EMS EMS : Energy management system
SCADA Scada : Monitoring, report, alarms, fault
12/112/33
PV + Energy Storage SystemOlmo, Corsica - 2013
Project: Olmo
Location: Aghione, Corsica
Client: Akuo Energy
Application: Solar plant with energy storage
Power: 4 MW - Energy: 4 MWh
13/113/33
PV + Energy Storage SystemMortella, Corsica - 2013
Project: Mortella
Location: Corsica, Mediterranean Sea
Client: Akuo Energy
Application: Solar plant with energy storage
Power: 7 MW - Energy: 7 MWh
14/114/33
Project: SANC - LAB
Location: South of Italy ,5 locations
Client: Terna
Application: Grid stabilization
Power: 38,4 MW
Deployments of BESS for Primary ControlTerna, Italy (2013)
15/115/33
Deployments of BESS for Primary ControlDrewag, Germany - 2014
Project: Drewag
Location:Dresden, Germany
Client: Drewag
Application: Primary regulation control
Power: 2 MW - Energy: 2,5 MWh
16/116/33
Project: Les Cèdres
Location: Reunion Island, Indian Ocean
Client: Akuo Energy
Application: Solar plant with energy storage
Power: 9 MW - Energy: 9MWh
PV + Energy Storage SystemLes Cèdres, Reunion Island - 2015
17/117/33
Solar plant with energy storage “LES CEDRES”The purpose of the Project is to generate and sell electricity from a photovoltaic power plant coupled with an electrical storage system. The Project will be connected to the public power distribution grid (EDF SEI).
It will consist of 2 main elements:Scope 1: a solar power plant (SPP) (including solar panel, inverter, and transformer) delivering AC power at a variable output depending on the solar resources and,Scope 2: an Energy Storage System (ESS) consisting of batteries, inverter and transformer capable of both charging from, and delivering, AC power. A programmable logical controller (PLC) will allow for balancing the SPP generation and the PSS load, as well as dispatching the overall system’s generation to the grid so as to match its power demand and power quality requirements. A software layer, namely the Energy Management System (EMS), will link up the production forecasts data, active power instructions requested from the Grid, and the PLC.
Selected reference
Customer: AKUOENERGY
Final customer:
Country: La Réunion – French Island
Indian ocean
Application: Renewable energywith energy
storage
Value: 12 390 k€
EPC contract
PV + Energy Storage SystemLes Cèdres, Reunion Island - 2015
18/118/33
Order value: 6.382 k€Customer: ADVANTEC CO. LTD. - JapanLocation: Hokkaido Island, JapanApplication: Solar + BESSScope of work: 4 PCS and ESS containers for a total capacity of 6MW power and
6MWh energy, with complete Power & Energy managementsystem.
Why we won: Thanks to recent experiences demonstrated and implementedsuccessfully for different projects in French islands (Corsica, LaRéunion) and French Guyana with solar + BESS
Description: Energy conversion and storage solution for a photovoltaic powerplant located in Hokkaido Island, Japan.Designed to fully respect the two rules set by the utility: Rule 1: In case of brutal variations of solar power, the storage
system must be able to deliver power to the grid with a maximum power variation of 1% of the maximum solar power per minute.
Rule 2: The system must be able to decrease the power to the grid from 100% to 0% with a decreasing ramp (and conversely an increasing ramp) of 12% max per minute. The reduction of production and time in that case are transmitted by the grid operator 30 minutes in advance.
PV Farm + BESS Hokkaido Island 6MW -6MWh
20/120/33
In November 2015 Nidec-ASI GmbH has been awarded by STEAG GmbH for the
as well as the participation in taking over and acceptance of 6 Large-Scale Battery Systems for the provision of each +/- 15,0 MW Primary Control Power according to TransmissionCode 2007.
KW Lünen NRW
KW Weiher Saarland
KW Herne NRW
KW Bexbach Saarland
KW Walsum 9 NRW
KW Fenne Saarland
Planning
Construction
Manufacturing
Delivery
Turnkey installation
Commissioning
Trial operation
Installation sites: Steag’s existing power plants
STEAG - GBS Project description
22/122/33
STEAG - GBS Project description
STEAG (Germany) 6 x 15MW Primary frequency regulati on
Site 1
Lünen – Bauarbeiten beendet
Site 2
Herne - Bauarbeiten beendet
In operation In operation
23/123/33
STEAG - GBS Project description
STEAG (Germany) 6 x 15MW Primary frequency regulati on
In operation In operation
Site 3
Quierschied (Weiher) – Bauarbeiten beendet
Site 4
Bexbach
24/124/33
STEAG - GBS Project description
STEAG (Germany) 6 x 15MW Primary frequency regulati on
In operation In operation
Site 5
Duisburg - Walsum
Site 6
Völklingen (Fenne)
26/126/33
Per
form
ance
Automatic and complete activation within 30 sec in case of frequency deviations
Proportional regulation with droop (Statik) as proportional gainTypical value 0,4% with -Pmax @ 200mHz / Pmax @ -200mHz
Frequency band to be covered 49,8 Hz….50,2 Hz Deadband 50 Hz± 10 mHz (49,99 Hz …. 50,01 Hz)
Time period to be covered per single fault at least 15 min
Continuous full call of primary control in prequalified technical units with capacity limitation for at least 30 minutes
The primary control must be provided throughout the entire offer period (one week)
Eco
nom
ics Smallest marketable unit 1 MW
Weekly tender, 52 bidding procedures per year
Primary Control Power
27/127/33
UK’ 1ST EFR NG 2016
The battery systems will provide Enhanced Frequency Response Service 2 (±0.015hz deadband) to National Grid for at least 4 consecutive years complying with or exceeding the requirements set out in the final versionof National Grid's EFR Contract and Tender.
AS AGGREGATE THEY ARE 30% OF NG 2016 EFR ALLOCATION (200MW)
NATIONAL GRID1° ROUND TENDER FOR EFR SERVICES
WEST BURTON EDF PROJECT: 49MW
BLACKBURN MEADOWS EON PROJECT: 10MW
WEST BURTON EDF PROJECT: 49MW
28/128/33
• 10 Step up transformers 450V / 6,6kV• 2 HV distribution containers including
9 switchgears each• 20 PCS & Batteries containers • HVAC Systems• Fire detection & extinguishing system• Electrical & Mechanical erection• Power Management System• Energy Management System• Scada System with National Grid
Interface for performances & billing
• 2 Step up transformers 450V / 33kV• 2x33kV switchgears (extension of the
existing switchboard)• 4 PCS & Batteries containers • HVAC Systems• Fire detection & extinguishing system• Civil work• Electrical & Mechanical erection• Power Management System• Energy Management System• Scada System with National Grid Interface
for performances & billing
Enhanced Frequency Response 49MW in 1 second
20*containers (2*(1.5 MVA Active Front End AC/DC converter) & Battery Bank)10*Transformers of 4 MVA nominal, overload 6 MVA 40 min
(2C)
LG Chem JP3 pouch cells
NG ‘16 EFR EPC project details: 49MW & 10MW
Application
Grid components
Battery type
Enhanced Frequency Response 10 MW in 1 second
4*containers (2* (1.5 MVA Active Front End AC/DC converter) & Battery Bank)2*Transformers of 4MVA nominal, overload 6MVA 40min
(2C)
LG Chem JP3 pouch cells
29/129/33
�Meeting the stringent NG Grid Code and EFR requirements
�Seamless system integration & communications interface
�Complying with Health & Safety regulations
�Minimizing losses to maximize customers profit
�Mitigating civil works risk
�Mitigating 3p suppliers risk
NG ‘16 EFR Project ChallengesThe secret to success is Know-how
ENGINEER
PROCURE
CONSTRUCT
MAINTAIN
We all know how to win the challenges to deliver a project: • On time• On budget• On specs• On guaranteed performance
Tailored design and project specific solution is key to success
30/130/3330
WIND FARM 14MW WITH STORAGE UNITGRESS, Martinique Island (2017)
NW Energy for GRESS project energy storage system o f 5MW/5MWh located in Martinique Island in French Caribbean
Annual production site of approximately 40GWh (equivalent to 10.000households) by coupling an energy storage system with a new windfarm of 14MW.
28000 t of CO2 emissions avoided / year
One Energy Management System (EMS) will allow the networkoperator to precisely estimate and respect the forecast of electricityproduction in order to achieve greater stability and maximize energy input into the grid.
MAIN STEPS:Detailed engineering: 11/2017End of manufacturing: 01/2018Beginning of tests: 12/2017Delivery at site: 03/2018Battery Modules at site: 04/2018Start of commissioning: 07/2018
32/132/3332
Project: Viking Queen
Location: Norway
Client: EIDESVIK
Application: Energy storage system integrated on board
Power: 1,6 MW - Energy: 654 kWh
Project: Seasight
Location: Norway
Client: ZEM / ENLINJESKJEMA
Application: Energy storage system integrated on board
Power: 1 MW - Energy: 577 kWh
Project: Torghatten
Location: Norway
Client: FIKERSTRAND
Application: Energy storage system integrated on board
Power: 270 kW- Energy: 270 kWh