– , Piemonte Office Building Ontario CA125,685 SF Class A, 5- story office building, 1/300 Parking ratio, Type II FR B occupancy, Lobby

finishes include stone flooring from slab materials, stone and wood paneling on wall

– , Bayfair Center Regional Mall San Leandro CADemolition, renovation, and seismic retrofit of approx. 115,00 s/f of an existing 850,000 s/f regional mall,

interior finish upgrade of entire public area of mall, parking lot reconfiguration and renovation

– , The Pike at Rainbow Harbor Long Beach CA370,000-square-foot entertainment and retail center that includes waterfront restaurants and a 14-screen theater. The center is divided into distinct zones, each featuring its own architecture to provide a unique entertainment experience and signature elements, such as the pedestrian bridge reminiscent of the wooden roller coaster that

operated in the city’s historic Pike amusement zone from 1930 to 1968

– , Irvine Spectrum Center Irvine CAPhases III & IV of this long term project added approx. 220,000 SF of retail and dining venues, continuing the Moorish village theme comprised of cobblestone walkways, Andalusian districts and plazas. Notable is the 105

foot diameter Giant Wheel, which comes to life at night with over 15.000 solar powered lights.

– , Balboa Bay Club Newport Beach CAPhase I includes a new clubhouse, ladies’ and men’s spas, a state-of-the-art fitness center with racquetball and

basketball courts, child care service, a pro shop, bar/lounge, indoor/outdoor restaurant, a swimming pool, outdoor Jacuzzi and children’s pool, as well as 28 waterfront guest rooms

Lakeshore Towers Phase II – , Irvine CA128,135-SF Class A, 5 story office building constructed at a cost of $10 million, designed with precast concrete

panels, punched windows and glazed ribbon walls.

– , TEAM FORD Las Vegas NV14-acre site featuring an 85,000-square-foot building with 60 service bays and inventory parking that can

accommodate in excess of 900 cars. The 6,000-square-foot showroom features a 20-foot curtain wall glazed with Ford blue glass, extensive detail lighting, specially designed concrete and desert-style landscaping,

including oversized boulders and palm trees.

– , SOLANO MALL Fairfield CA161,000-square-foot retail/entertainment venue replacing a former department store, and the centerpiece to the $15 million project is a new 16-screen Edwards Theater megaplex cinema. The 72,000-square-foot theater

complex features stadium seating as well as state-of-the-art sound and screening technology.

– , Mercedes Benz of Laguna Niguel Laguna Niguel CA85,000-square-foot facility comprised of two buildings on 12 acres. With its 8,000-square-foot, single-level showroom featuring 12 new cars, a 3,000-square-foot, pre-owned vehicle showroom, 62 service bays, three

customer waiting areas and a parking lot offering more than 500 parking stalls, the spacious new Mercedes-Benz dealership is one of the largest and finest facilities of its type in the world.

Bal Seal Engineering – Foothill Ranch, CA125,225 SF concrete tilt up facility on a 7.2 acre site, including corporate office improvements, research and

development departments, onsite manufacturing and distribution facilities for this maker of world class industrial springs and seals.

– , Candlewood Hotels Lake Forest CA$4M design build contract for a 122 all suite hotel building as part of a national rollout program, including

infrastructure development, wood frame construction, full FF&E coordination, tenant improvements, and site amenities including pool.

– , Eisenhower Medical Center Rancho Mirage CAComplete build out of a 23,000-square-foot, 18-bed birthing center that included OB/GYN, E.N.T. trauma and cardiac, nursery space along with 14 LDRP suites. The project also consisted of elaborate site work with a new

pedestrian bridge. The project was reviewed and inspected under OSHPD requirements

– , Mallinckrodt Medical Irvine CAComplete design/build responsibility for a 110,000 SF medical manufacturing facility, warehousing and offices.

Project features Class 100,000 and 10,000 clean rooms with chilled water and condenser water systems for injection molding equipment and a separate chilled water system for the clean area air conditioning system,

three overhead rolling bridge cranes, compressed air, industrial, process and lab vacuum systems.Project also includes research and test laboratories, significant seismic strengthening, and hazardous materials

abatement.

– , Toyota NAPLD Ontario CA760,000-square-foot regional facility, constructed of concrete tilt-up walls with a steel-framed roof, includes

administration offices, a teleconferencing center, a full-service cafeteria, and a distribution area. The surrounding 94-acre site features decorative colored stone, olive trees and traditional Japanese flora