mid-basin sediment diversion programcoastal.la.gov/wp-content/uploads/2020/05/diversions-101... ·...

Post on 14-Jul-2020

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Mid-Basin Sediment Diversion Program

C O A S TA L P R O T E C T I O N A N D R E S T O R AT I O N A U T H O R I T Y

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 2

Coastal Protection and Restoration AuthoritySingle state entity with authority to articulate a clear statement of priorities to achieve comprehensive coastal protection for Louisiana.

Mandate is to develop, implement, and enforce a comprehensive coastal protection and restoration master plan.

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 3

Louisiana’s Land LossSINCE 1932

square miles2,006

LAND LOST LAND GAINED

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 4

What We Stand To LoseYEAR 50

square miles4,200

LAND LOST LAND GAINED

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 5

What We Stand To LoseSINCE 1932 + YEAR 50

square miles6,206

LAND LOST LAND GAINED

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 6

Why are we in this predicament?THE GREAT FLOOD OF 1927

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 7

total funding$50BCoastal Master Plan

$0

$5

$10

$15

$20

BARRIER ISLANDRESTORATION

HYDROLOGICRESTORATION

MARSH CREATION RIDGERESTORATION

SEDIMENTDIVERSION

SHORELINEPROTECTION

STRUCTURAL NONSTRUCTURAL

BILL

IONS

RISK REDUCTION

$25BRESTORATION

$25B

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 8

Coastal Master Plan

SEDIMENT DELIVERY

$23.8BDREDGING

79%

DIVERSIONS

21%

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 99

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 1010

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 1111

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 1212

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 1313

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 1414

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 1515

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 1616

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 1717

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 18

SEDIMENTWASTED

SEDIMENTWASTED

Reconnecting the River

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 19

ACCESS TO SEDIMENT, NUTRIENTS,

AND FRESHWATER

NO ACCESS TO SEDIMENT, NUTRIENTS,

AND FRESHWATER

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 20

Reconnecting the River

MID-BARATARIA

MID-BRETON

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 21

MAXIMIZEDIVERTED SEDIMENT

MINIMIZEDIVERTED WATER Sediment

DiversionsBuild and sustain land

Increase nutrients and sediment deposition to sustain and maintain wetlands

C P R A M I D - B A S I N S E D I M E N T D I V E R S I O N P R O G R A M

22

Land BuildingCapabilities

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 23

PROVEN SUCCESS

Fort St. Philip

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 24

PROVEN SUCCESS

Davis PondMARCH 2008 APRIL 2016

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 25

PROVEN SUCCESS

Pivach Cut2013 2014 2016

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 26

Land Building• Land Gained and

Sustained

• Year 10

• 1.5 SLR

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 27

Land Building• Land Gained and

Sustained

• Year 20

• 1.5 SLR

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 28

Land Building• Land Gained and

Sustained

• Year 40

• 1.5 SLR

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 29

Marsh Creation Comparison

PROPOSED MID-BARATARIA PROJECT SITE LAND GAINED AND SUSTAINED MARSH CREATION PROJECT

C P R A M I D - B A S I N S E D I M E N T D I V E R S I O N P R O G R A M

30

Permitting & Program Process

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 31

CPRA Submits Joint Permit Application

• Coastal Use Permit (Section 10/404)

• Request to Alter a Federal Project (Section 408)

Public Scoping Meeting

USACE Develops Draft Environmental Impact Statement

(DEIS)

Public Comment Period

EIS revisions based on Public Comment

USACE develops Final Environmental Impact Statement

(FEIS)

Final Public Review

USACE Record of Decision

PROJECT ENGINEERING & DESIGN

FEDERAL PERMITTING PROCESS

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 32

Start PermittingCoastal Use (LDNR), Navigation, and Wetlands

• Section 10 (USACE Navigation)/404 (USACE Wetlands) and Coastal Use Permit (INDR CUP)

• Permit Public Notice and Comment• Coastal Use Permit• Coastal Use Permit Public Act

Notice and Comment• Coastal Use Permit Approval• Section 10/404 Approval• Project Implementation and

Monitoring

Start EISNational Environmental Policy Act

• Solicitation of Views• Notice of Intent for EIS• Start EIS• Public scoping meeting• Draft EIS• USACE (HQ/MVD) Approves Draft

EIS for Release• Public Comment on Draft EIS• Final EIS• Public Review on Final EIS• Complete EIS (Record of

Decision)

408 Approval (USACE)Request To Alter A Federal Project Or Project With Federal Interest No Direct Public Involvement

• 408 Request• 60% Plans and Specifications Review

- District – PDT- Agency Technical Review (ATR)- IEPR-SAR Review

• USACE (HQ/MVD) Preliminary 408 Approval

• Record of Decision (408)• 408 Approval• 408 Construction Oversight

Permitting and Construction Approvals

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 33

• Aesthetic and Visual Resources• Air Quality• Aquatic Resources• Terrestrial Resources• Commercial Fisheries (industry impacts)• Cultural Resources• Environmental Justice (EJ)• Essential Fish Habitat (EFH)• Groundwater• Land Use• Marine Mammals• Navigation (deep draft and tows)

• Noise• Oil and gas resources• Prime Farmland• Public Safety (Flood Risk Reduction)• Recreation (including fishing)• Soils/Sediment (River and Basin)• Socioeconomic (population, tax revenue,

housing, etc.)• Storm Surge/Flooding• Threatened and Endangered Species (T&E)• Water Quality (salinity/nutrients)• Wetlands and Waters of the U.S.

EIS Progress Impact Analyses

C P R A M I D - B A S I N S E D I M E N T D I V E R S I O N P R O G R A M

34

Mid-Barataria Sediment Diversion

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 35

LOCATION

TASKS

PROJECT DETAILS

PROJECT FEATURES

E&D FUNDING

• Funding E&D, Construction• Permitting and Construction Approvals• Environmental (EIS)• Land Rights• Engineering and Design• Operations

• Inlet, Conveyance Structure, Outlet• Interior Drainage Modifications• Highway Modifications• Railroad Modifications

• Inlet: Elev. -40 feet• Width: 1,600 foot Corridor• Length: Approx. 2 miles• Capacity: est. up to 75,000 cfs

Ironton, LA NFWF

MID-BARATARIA SEDIMENT DIVERSION

Project Location

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 36

PROPOSED PUMP STATION

WILKINSON CANALPUMP STATION

PROPOSED DROP STRUCTURE

PROPOSEDR.R.

ALIGNMENT

PROPOSEDLA 23 BRIDGE

MID-BARATARIA SEDIMENT DIVERSION

Project Location

MISSISSIPPIRIVER LEVEE

INTAKE ARMORING

RAILROAD ACCESS BRIDGE

ADMIN & MAINTENANCE BLDGSGATED STRUCTURE

HWY 23 BRIDGE CHANNEL GUIDE LEVEES

OUTFALL TRANSITION

BARATARIA BASIN

MBSD CHANNELFLOW DIRECTION

U-FRAME INTAKE STRUCTUREU-FRAME TRAINING WALLS

MISSISSIPPI RIVER

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 38

DATA COLLECTION

Geotechnical Borings, Pump Tests, and Field Consolidation Tests

PHYSICAL MODELING EFFORTS

ENGINEERING & DESIGN: 30% DESIGN

SITE LAYOUT COORDINATION

OUTREACH & ENGAGEMENT

MID-BARATARIA SEDIMENT DIVERSION

Ongoing Efforts

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 39

Next Steps

EIS• USACE & other federal agencies will analyze

impacts using best available science and data

• Continued coordination with communities and stakeholders

• Refine operational controls, adaptive management plan, and mitigation strategies

• Coordinate with USACE and federal family on the project’s impact analysis avoid, minimize, mitigate any significant impacts

Engineering and DesignProgressing from 30% to 60% design effort

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 40

C P R A M I D - B A S I N S E D I M E N T D I V E R S I O N P R O G R A M

41

Mid-Breton Sediment Diversion

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 42

LOCATION

TASKS

PROJECT DETAILS

PROJECT FEATURES

E&D FUNDING

• Funding E&D, Construction• Permitting and Construction Approvals• Environmental (EIS)• Land Rights• Engineering and Design• Operations

• Inlet, Conveyance Structure, Outlet• Interior Drainage Modifications• Highway Relocation

• Inlet: Elev. -20 to -35 feet• Width: 1,400-foot Corridor• Length: Approx. 0.5 miles• Capacity: est. up to 75,000 cfs

River Mile 68 WILL’S POINT /BERTRANDVILLE, LA NFWF

MID-BRETON SEDIMENT DIVERSION

Project Location

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 43

NON-FEDERAL LEVEE

MISSISSIPPI RIVERAND TRIBUTARIES

LEVEE

MID-BRETON SEDIMENT DIVERSION

Project Location

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 44

MID-BRETON SEDIMENT DIVERSION

Project Features

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 45

RIVER SEDIMENT/BASIN SAMPLING

ENGINEERING & DESIGN – 15 % EFFORT

PHYSICAL MODEL TESTING

OUTREACH & ENGAGEMENT

MID-BRETON SEDIMENT DIVERSION

Ongoing Efforts

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 46

Next Steps

EIS• Scoping meetings scheduled for early 2020

• Continued coordination with communities and stakeholders

• Refine operational controls, adaptive management plan, and mitigation strategies

Engineering and DesignProgressing from 15% to 30% design effort

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 47

C P R A M I D - B A S I N S E D I M E N T D I V E R S I O N P R O G R A M

48

Outreach & Engagement

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 49

Outreach & Engagement

JEAN LAFITTE

VIOLET

PORT SULPHUR

BELLE CHASSE

EMPIRE

IRONTON

PORT FOURCHON

DAVANT

BURAS

SAINT BERNARD

CHALMETTE

AVONDALE

BATON ROUGE

GRAND ISLE

MANDEVILLE

HOUMA

NEW ORLEANS

DULAC

BRAITHWAITE

COAST AL PROT ECT ION AND REST ORAT ION AU T HORIT Y / MID-B ASIN SEDIMENT DIVERSION PROGRAM 50

SEDIMENT DIVERSION PROGRAM

Outreach & Engagement

ELECTED & PARISH OFFICIALS

SEAFOOD INDUSTRY

RECREATION INDUSTRY

COMMUNITIES NEAR PROJECT SITES

NGO, NONPROFIT, AND STAKEHOLDER GROUPS

GENERAL PUBLIC

195 MEETINGS8,000

STAKEHOLDERS REACHED

THANK YOU

top related