Bethel Park High SchoolBethel Park, PA

Weekly Progress Slide ShowWeekly Progress Slide ShowMarch 05, 2010

Massaro

From the Old to the New

Massaro

Work Continues in Area F

Massaro

Walls being formed in Area Fg

Massaro

Wall Rebar and Forms continue in Area H

Massaro

Foundation of East Wall in Area H

Massaro

Mud Management in Area Cg

Massaro

Excavations Push Forward

Massaro

Forms are being set and staged across site.

Massaro

Scheduled Work For Next Few Weeks:

• Building foundations and wall formingBuilding foundations and wall forming.• Excavation of areas E,F,D,G, and H.

C ti t k il il t bili ti it• Continue stock pile, soil stabilization items, and back fill operations.

• Temporary Sanitary Tie-in being placed.• Underground building MEP items.g g• Steel Fabrication continues at Sippel Fab.• Plumbing pipes to stage

Massaro• Plumbing pipes to stage.