Massachusetts Port Authority Capital Programs Department Logan Office Center One Harborside Drive Suite 209S East Boston, MA 02128-2090
Request for Proposal for System Integration Services Master Building Control System for HVAC MPA No. L1227-S1 Master Building Control System Provision and Implementation & Maintenance December 5, 2013
RFP Response Due: 12:00 P.M. Tuesday, January 28, 2014
RFP TABLE OF CONTENTS
Section Page I. INTRODUCTION
A. Background 1 B. Project Goal 2 Exhibit
Exhibit I-A – Building List – Logan International Airport 4 II. SYSTEM INTEGRATION CONTRACT OBJECTIVES AND SCOPE OF WORK
A. Overview of the System Integration Scope of Work 6 B. Data Points to be Integrated 7 C. Requirements of Proposal 7 D. Massport Project Management 8 Exhibits
Exhibit II-A - Phase I Building List with Plant Types Exhibit II-B - Plant Type Components Exhibit II-C - Points List AHU Type A Exhibit II-D - Points List AHU Type B Exhibit II-E - Points List AHU Type C Exhibit II-F - Points List Fans Exhibit II-G - Points List Terminal Units Exhibit II-H - Points List Hot Water Heating Exhibit II-I - Points List Heating HW Station Exhibit II-J - Points List Chilled Water Exhibit II-K - Points List Chilled Water Station Exhibit II-L - Points List Monitoring
III. PROPOSAL AND SELECTION PROCESS
A. Proposal Process 26 B. Written Questions 27 C. Pre-Proposal Conference 27 D. Answers to Questions Regarding RFP 27 E. Proposal Submission 27 F. Proposal Guarantee 28 G. Evaluation 28 H. Facility Tour and Oral Presentation 31 I. Notification, Negotiation and Award 31
IV. PROPOSAL ORGANIZATION
A. General Instructions 32 B. Proposal Format and Content 32
Exhibits
Exhibit IV A - Pricing Schedule* 38 Exhibit IV B – Summary Pricing Matrix* 39
V. GENERAL PROPOSAL SUBMITTAL CONDITIONS
A. Acceptance of the Proposal 40 B. Conflict of Interest 40 C. Proprietary Information, Non-Disclosure 41 D. Representations Made by Proposer 41 E. Insurance 42
Attachment A: Technical Specifications
MBCS Technical Specification Massport Information Technology Standard Specifications Massport IT System Standards Part A: HP Server Hardware Standard Part B: Enterasys Networking Hardware Part C: Microsoft Windows Server Operating System Standards Part D: Microsoft SQL Server Database Software Standard Part E: EMC/HP Storage Standards Part F: VMware ESX Virtualization Software Standard Part G: Desktop & Mobile Device Standards Appendix G: IT Technical Environment Matrix * Appendix K: Information System Security General Standards
Attachment B: Draft Contract Provisions
Draft Contract Provisions Exhibit A: Scope of Work Exhibit B: Compensation Schedule Exhibit C: Non-Discrimination and Affirmative Action Exhibit D: Certificate of Compliance with Laws *
* RFP Requires that the MBCS Integrator fill out the exhibit and submit with Proposal.
Master Building Control System - RFP
MPA L1227 Page 1 December 2013
I. INTRODUCTION The Massachusetts Port Authority (Authority or Massport) is seeking a qualified vendor to provide and implement a Master Building Control System at Logan International Airport. The vendor must have proven experience in the provision and installation of an enterprise building control management system, and integration of that system with legacy building controls. The vendor must be able to work closely with the Authority and existing Building Management Systems in order to provide such services in a timely and effective manner. The Authority maintains a large campus of buildings at Logan International Airport, East Boston, MA. The Airport is currently equipped with a myriad of legacy building control systems and devices that have been installed over time without a program for central monitoring and control. Centralized monitoring and control is essential to the ability of the Airport Facilities - HVAC Department (Facilities) to effectively manage this large complex facility, respond to alarms, and operate with maximum energy efficiency. Realizing the need to modernize, improve energy efficiency, and increase effectiveness in monitoring and controlling HVAC devices, Massport has undertaken a program to integrate all existing building HVAC management systems into a campus wide Master Building Control System (MBCS), and to standardize Massport’s hardware and controls management system software onto a modern technology platform. It is intended that the MBCS will provide a migration path for Massport to procure standard BACnet control products on future projects. The move to a comprehensive MBCS will be a multi-phased effort. This Request for Proposal (RFP) is for provision of the MBCS and shall include:
• Supporting hardware and software • Installation and implementation of the system • Integration of the “Phase I Buildings” of this multi-phased program • 3-year maintenance and support following the Phase I system implementation • Integration of new facilities brought on line for 3-year period following Final Acceptance of
the MBCS A. Background
The Logan International Airport site currently encompasses 90-plus buildings. These include terminals, Central Heating Plant (CHP), Airport Operations facilities, parking structures, cargo buildings, hangars, substations, pump stations, storage facilities, maintenance facilities, and office buildings. These buildings are controlled by a variety of stand-alone microprocessor based building management systems. Some microprocessor based control systems include pneumatically actuated end devices (i.e. automated control dampers, heating and cooling control valves). The existing control systems range from older legacy Carrier Comfort Network (CCN) control systems, to industrial PLC based controls systems such as those at the CHP, to newer state-of-the-art BACnet and web based control systems. These systems are supplied by a number of vendors which include: • Carrier CCN • Carrier i-Vu • Automated logic WebCTRL • Schneider Electric TAC Modicon Quantum • Schneider Electric StruxureWare • Siemens
Master Building Control System - RFP
MPA L1227 Page 2 December 2013
Refer to Exhibit I-A – Building List – Logan International Airport for a full list of buildings and their associated control system manufacturers. Existing building control systems include a mix of different hardware, building control sequence strategies, point naming conventions, alarm management, password protection, etc., that make it difficult for Facilities to standardize on spare parts, operations and maintenance, programming, reporting, service and response.
B. Project Goal
This Project will provide a BACnet management system which will integrate seamlessly to existing legacy Building Automation Systems (BAS) and new BAS in the future. The system will provide appropriate levels of information for the different user groups of the system. The primary users of the MBCS will be:
• Building Control for the monitoring of systems and alarms, and • Airport Facilities - HVAC Department for operations, maintenance, and M&V
Graphic symbols, plant templates and point naming conventions will be standardized to make operation simpler. The MBCS will provide monitoring, adjustment, trending, logging, reporting and alarm management.
The intent for legacy systems is that the integration will be sufficiently rich to allow normal day to day management of each plant from the MBCS, while for more detailed adjustment will be implemented using the legacy system software. The intent for future systems is that the integration will allow for a higher level of management and adjustment of each plant from the MBCS, and a more limited reliance on the host system software. The MBCS shall be capable of interfacing to Enterprise Management Systems to facilitate Airport operations. The Project will be implemented in phases. Integration of Phase I buildings is to be executed within the scope of work of this RFP. The enterprise system provided under the RFP must be robust enough to support future integration of all Airport buildings. It is intended that Phase II work will be performed under a future contract. The scope of this RFP includes MBCS integration to monitor and control HVAC plant in the following Phase I buildings:
BUILDING NUMBER BUILDING NAME
PHASE IA
8 Hanger (jetBlue)
9 Hanger (American)
11 State Police and TSA Bldg.
20 Terminal C, Main Pier A
20 Terminal C, Pier A CBIS
22 Terminal C, Main (included with Main Pier A)
Master Building Control System - RFP
MPA L1227 Page 3 December 2013
BUILDING NUMBER BUILDING NAME
PHASE IA
24 Terminal C, Pier D (included with Main Pier A)
26 Air Traffic Control Tower
27 Terminal B, Pier A (American)
27 Terminal B, Various Fan Rooms
53 Green Bus Depot (bus maintenance)
56 South Cargo Bldg. (Delta)
60 RCC Customer Service Center
80 State Police K-9 Facility
0 Product Display Center (located off Airport)
PHASE IB
31 Terminal A, Main
31 Terminal A, Satellite
31 Terminal A, Satellite (CBIS)
PHASE II buildings to be integrated through a future contract include: • Monitor and control HVAC plant on the existing terminal control systems in Terminals B, C
and E. • Monitor only HVAC plant in MPA Facilities and CHP • Monitor and control HVAC plant in all other facilities.
Refer to Exhibit I-A - Building List – Logan International Airport for a list BAS legacy system types. The full functional requirements of the MBCS are detailed in the MBCS Technical Specifications in Attachment A. All future new or renovated work will be BACnet based and be competitively bid. It is the intent that the DDC programming will be undertaken by the BAS contractor while the graphical interface will be undertaken by the MBCS Integrator in order to maintain standardization. Rates for performing this role on a $/point basis shall be provided as part of Proposal in the response to this RFP. Refer to Pricing Matrix in Section IV.
EXHIBIT I-A BUILDING LIST - LOGAN INTERNATIONAL AIRPORT Master Building Control System - RFP
No. Name Car
rier
CC
N
Car
rier
i-V
u
ALC
Web
CTR
L
Schn
eide
r/
TAC
Schn
eide
r/
Stru
xure
War
e
Siem
ens
Oth
er
To b
e de
term
ined
(I
n D
esig
n)
1 Gate Gourmet
2 MPA Wood Island Substation
3 MPA Facilities 2
4 MPA Facilities 3
5 Hanger (US Airways)
6 MPA Pump Station (old)
6A New MPA Pump Station (new)
6B New Electrical/Telecom Bldg.
7 Unassigned
8 Hanger (jetBlue)
9 Hanger (American)
10 Economy Parking Garage
11 State Police and TSA Bldg.
12 Salt/Sand Shed (landside)
13 Cargo Bldg.
14 General Aviation
15 Large Vehicle Storage Bldg.
16 Hanger
17 Salt/Sand Shed (airside)
18 Facilities 1 - Central Heating Plant
19 Terminal E
20 Terminal C, Pier A & CBIS
20 Terminal C, Depart
21 Terminal C, Pier B
22 Terminal C, Main (Ticketing Hall MPA & Bag Claim)
23 Terminal C, Pier C
24 Terminal C, Pier D
25 MPA Administration Bldg. (Old Tower)
26 Air Traffic Control Tower
27 Terminal B, Pier A (American)
28 Terminal B, Parking Garage
29 Terminal B, Pier B (US Airways)
30 Central Parking Garage
31 Terminal A, Main
32 Terminal A, Satellite
33 Unassigned
34 Hilton Hotel
35 Hilton Hotel walkway
36 Terminal C walkway
37 MBTA Airport Station
37A Substation/Lift station
38 Unassigned
39 Unassigned
40 Trailer Complex
41 Porter Street Substation
42 QTA 2 (Hertz)
43 Boston EMS A7
44 North Gate
45 RCC - Garage
46 BOS fuel farm
47 MTA/CAT response station/electrical substation
48A Toll Plaza at Ted Williams tunnel
48B Toll Plaza at Ted Williams tunnel
49 QTA 4 (Enterprise/Alamo/National)
BAS LEGACY SYSTEM TYPE BUILDING
MPA L1227 Page 4 December 2013
EXHIBIT I-A BUILDING LIST - LOGAN INTERNATIONAL AIRPORT Master Building Control System - RFP
No. Name Car
rier
CC
N
Car
rier
i-V
u
ALC
Web
CTR
L
Schn
eide
r/
TAC
Schn
eide
r/
Stru
xure
War
e
Siem
ens
Oth
er
To b
e de
term
ined
(I
n D
esig
n)
BAS LEGACY SYSTEM TYPE BUILDING
50 Unassigned
51 B.U. Office Bldg.
52 South Gate
53 Green Bus Depot (bus maintenance)
54 Amelia Earhart Bldg.
55 Amelia Earhart Hanger
56 South Cargo Bldg.
57 South Cargo Bldg. (FedEx)
58 South Cargo Bldg.
59 Unassigned
60 RCC Customer Service Center
61 Taxi Pool
62 South Cargo Bldg.
62 South Cargo Bldg.
64 Unassigned
65 Logan Office Center
66 Field Lighting Vault
67 Bird Island Flats Substation
68 Sky Chef
69 QTA 1 (Avis/Budget)
70 Harborside Hyatt Hotel
71 CNG Fuel station
72 Taxi-pool
73 Terminal E West Bag Room
74 Water shuttle pier
75 Park Pavilion Bldg. (Bremen St.)
76 Limo Pool
77 P.O.F. Communications
78 Massport Air Rescue Fire Fighting Station 1 (HQ)
79 Massport Air Rescue Fire Fighting Station 2 (Satellite)
80 State Police K-9 Facility
81 West Parking Garage
82 Vent Bldg. 7
83 QTA 3 (Dollar/Thrifty)
84 Bird Island Flats Parking Garage
85 Massport Air Rescue Fire Fighting Station 3 (Marine)
86 Gas Station (NA)
87 Terminal E Walkway
88 Terminal A Walkway
89 Terminal A South Walkway
90 Terminal B East Walkway
91 Central Stockroom
92 Hanger Bldg.
93 Equipment and Facility Maintenance Bldg.
94 Aircraft Maintenance Facility
95 Terminal B West Walkway
0 Product Display Center
MPA L1227 Page 5 December 2013
Master Building Control System - RFP
MPA L1227 Page 6 December 2013
II. SYSTEM INTEGRATION CONTRACT OBJECTIVES AND SCOPE OF WORK It is Massport’s intent to select the MBCS Integrator through this RFP process. The MBCS Integrator’s system integration services are to include provision and installation of the required hardware and software, system configuration, programming, and integration of existing controls, programming of reports and graphics, and three-year maintenance and support. A. Overview of the System Integration Scope of Work
The MBCS Integrator is to:
• Provide software related to the new MBCS on hardware servers provided by Massport’s Information Technology Department (IT).
• Provide information, support and access as required for the proposed MBCS to allow evaluation by Massport’s third party representative for security flaws. Respond to conflicts identified and make modifications as required.
• Install and configure the core MBCS in Massport’s Logan Office Center (LOC) data center. This will require working with Massport IT staff. Massport IT plans to virtualize the servers for this system, and will advise the MBCS Integrator on this configuration for the MBCS installation. Massport IT staff will conduct the actual work to install the server blades and chassis, and configure and build the virtual Windows servers. The MBCS Integrator will install and configure the MBCS in a virtualized environment. The core system configuration and buildout will be a team effort subject to Massport’s final decisions on the system structure.
• Once the core system is ready, the MBCS Integrator shall work in various HVAC control and telecommunication rooms throughout the Airport to access BAS system control points and attach these to Massport’s IT office network switches.
• Identify need and location for additional local power and IT connections which will be provided by Massport.
• Acquire the data from the legacy systems in BACnet format.
• Where the legacy systems do not provide data in BACnet format provide protocol converter/driver to convert this data into BACnet.
• Transport data collected via TCP/IP to a central system server using the IT office network infrastructure.
• Provide graphics, software and functionality for the integrated points.
• Complete the integration without disrupting the day to day operation of the Central Heating Plant and Airport services.
• Provide documentation and training.
• Provide three-year maintenance and support
• Integration of new facilities and renovated systems as they come on line in the three (3) year period following Final Acceptance of the MBCS.
Master Building Control System - RFP
MPA L1227 Page 7 December 2013
B. Data Points to be Integrated
Selected legacy buildings are to be integrated under Phase I. Refer to Exhibit II-A – Phase I Buildings List with Plant Types for buildings, type of BAS, plant types and quantities in each. The manufacturers and BAS types include the following: • Carrier i-Vu • Automated Logic WebCTRL • Schneider Electric Continuum and StruxureWare • Carrier CCN • Siemens
In principle, all hardware points, setpoints, alarms and time schedules for the selected buildings’ BAS are to be integrated to the MBCS. Typical samples of which points shall be integrated are provided in the attached Exhibits: • Exhibit II-A - Phase I Buildings List with Plant Types • Exhibit II-B - Plant Type Components • Exhibit II-C – Points List AHU Type A • Exhibit II-D – Points List AHU Type B • Exhibit II-E – Points List AHU Type C • Exhibit II-F – Points List Fans • Exhibit II-G – Points List Terminal Units • Exhibit II-H – Points List Hot Water Heating • Exhibit II-I – Points List Heating HW Station • Exhibit II-J – Points List Chilled Water • Exhibit II-K – Points List Chilled Water Station • Exhibit II-L – Points List Monitoring
The MBCS Integrator shall allow for the integration of the total quantity of points and functionality as detailed in the Exhibits. The MBCS Integrator shall work with Massport during the Contract to confirm which particular legacy plant to integrate within the total quantity provided for. Any additional points will be costed on a $/point rate basis for each manufacturer type. Rates shall be declared in Exhibits IV-A and IV-B as part of the Proposal in response to this RFP.
C. Requirements of Proposal:
The organization of the Proposal shall be in accordance with Section IV and shall include the following: The responding MBCS Integrator shall provide an Implementation Plan to explain how the proposed MBCS will be implemented in phases, i.e. platform infrastructure followed by migration of legacy BAS product types and buildings. Include all off site engineering and demonstration stages, Integrated System installation and commissioning, plantroom installation and commissioning, training and production of Operation & Maintenance manuals.
The responding MBCS Integrator shall provide a Technical Proposal to explain how each legacy BAS type will be integrated into the proposed MBCS, and identify where technical input will be provided from third party(ies) to complete the interface. Include communications network diagram for the devices included in the Proposal, complete with engineering specifications for all the different items of intelligent equipment. Identify network installation and small power requirements.
Master Building Control System - RFP
MPA L1227 Page 8 December 2013
Describe any discrepancies between the proposing MBCS Integrator’s solution and the requirements of this RFP. If the MBCS Integrator does not highlight these discrepancies in its Proposal, then it shall be deemed that the responding Integrator complies fully with the Specifications. Unless the MBCS Integrator specifically states to the contrary in the Proposal, it shall be deemed MBCS Integrator has given the following undertakings:
• Ownership of application software shall be retained by Massport. Massport shall require
unrestricted access to carry out modifications and adjustment to programs as necessary. • The Proposal price is deemed to include all royalties and other ownership fees payable for
software. • There shall be no agreements of any kind preventing Massport’s staff from modifying
programs themselves after Substantial Completion.
Conditions within a Software License Agreement which limit the present or future client’s usage of the MBCS may cause the Proposal to be rejected. Clearly describe any work necessary for the proposed completion of the MBCS Integrator’s works not included for in this Proposal and which he may require to be executed and paid for by others. Any such work not specifically stated and described shall be deemed to have been included in this Proposal. Demonstrate capability of integrating legacy BAS products on projects of similar scale and complexity in a “live” environment. Provide a clear product roadmap for the solution going forward and detail additional functionality which can be added at a future date if required or desired. Emphasis is made for the MBCS Integrator to make it clear in the Proposal the basis on which the engineering solution is based and priced.
D. Massport Project Management
Massport will assign a Project Manager within its Capital Program’s Department, to serve as Project Manager on behalf of Massport for this effort. Additional key staff responsible for IT Network and Airport HVAC systems will serve as Massport Project Team members. It is expected that, upon Contract execution, the MBCS Integrator will submit a finalized Work Plan and Schedule for the Project. Bi-weekly project progress meetings will be held with the Massport Project Team and Integrator’s project representatives. It will be the responsibility of the MBCS Integrator to keep and provide minutes of these meetings, documenting any project issues arising and their expected and actual resolution, with adjustment to the Work Plan and Schedule as mutually agreed upon.
EXHIBIT II-A PHASE I BUILDINGS - PLANT TYPES Master Building Control System - RFP
No. Name BAS LEGAC
Y SYSTEM
TYP
E
AHU Typ
e A
AHU Typ
e B
AHU Typ
e C
Exha
ust F
an Typ
e 1
Exha
ust F
an Typ
e 2
Stair P
ressurization
Destratificatio
n Fan
VAV Type
1
VAV Type
2
VAV Type
3
Fan Po
wered
VAV
Box
Fan Co
il Unit
Duct H
eatin
g Co
il
HW Unit H
eater
Doo
r Air Cu
rtain
Infrared
Heater
Finn
ed Tub
e Heatin
g
Gas Fire
d Unit H
eater
Air C
ooled C o
nden
ser U
nit
Hot W
ater Heatin
g
Dom
estic
Hot W
ater
High temp HW Statio
n
Chilled
Water
Chilled
Water Statio
n
Mon
itorin
g
PHASE IA
8 Hanger (jetBlue) StruxureWare 4 4 36 5 1 1
9 Hanger (American) StruxureWare 4 4 36 5 1 1
11 State Police and TSA Bldg. ALC WebCTRL 3 6 10 4 1 66 2 9 1 9 5 1 1 1 19
20 Terminal C, Main Pier A Carrier I-Vu 6 24 65 5 20 7 1
20 Terminal C, Pier A CBIS ALC WebCTRL 3 3
22 Terminal C, Main (included with Main Pier A) Carrier i-Vu
24 Terminal C, Pier D (included with Main Pier A) Carrier i-Vu
26 Air Traffic Control Tower ALC WebCTRL 2 5
27 Terminal B, Pier A (American) ALC WebCTRL 2 3 3 1 2 1
27 Terminal B, Various Fan Rooms ALC WebCTRL 4 16 11 7 111 31 12 1 14 3 44
53 Green Bus Depot (bus maintenance) ALC WebCTRL 2 19 2 2 1 8 11 4 3 1 1 108
56 South Cargo Bldg. (Delta) Siemens 2 14 3 30 15 3 1
60 RCC Customer Service Center ALC WebCTRL 4 8 46 33 5 11 1 1 16
80 State Police K-9 Facility ALC WebCTRL 1 1 1 2
0 Product Display Center ALC WebCTRL 1 2 1 1 1
PHASE IB
31 Terminal A, Main Carrier CCN 1 1 32 185 2 24 1 1 70
31 Terminal A, Satellite Carrier CCN 3 6 272 1 19 1 1 40
31 Terminal A, Satellite (CBIS) ALC WebCTRL 3 3
BUILDING PLANT TYPE and QUANTITY
MPA L1227 Page 9 December 2013
EXHIBIT II-B PLANT TYPE COMPONENTS Master Building Control System - RFP
Plant Type Components
AHU Type A Supply fan
Return fan
Filters
Outdoor air damper
Economiser damper
Exhaust air damper
Hot water coil
HC Face and bypass damper
Elec heater battery 2 stage
VAV boxes
AHU Type B Supply fan
Min A outdoor air damper
Min B outdoor air damper
Economiser damper
Filters
DX coil
Hot water coil
AHU Type C Supply fan
Return fan
Filters
Outdoor air damper
Economiser damper
Exhaust air damper
Hot water coil
Chilled water coil
Hot water reheat coil
VAV boxes
VAV Type 1 Volume control damper
VAV Type 2 Volume control damper
Hot water reheat
VAV Type 3 Volume control damper
Hot water reheat
Electric reheat
Fan Powered Box Type 1 Fan
Hot water reheat
Fan Coil Unit withelectric heat Fan
CHW coil
Electric heater (thyristor )
Duct Heating Coil HW reheat
HW Convective Unit Heater Fan
HW valve
HW Unit Heater
Finned Tube Radiator
Infrared Heater
Gas Fired Unit Heater
Door Air Curtain Fan
HW heating coil
Air CooledCondenser UnitStaircasePressurisation Supply fan
Discharge damper
Exhaust Fan Type 1 Exhaust fan (starter)
Exhaust Fan Type 2 Exhaust fan (VFD)
MPA L1227 Page 10 December 2013
EXHIBIT II-B PLANT TYPE COMPONENTS Master Building Control System - RFP
Plant Type ComponentsDestratification Fan Fan
Chilled Water System Chiller
Pump 1
Pump 2
Chilled Water Station Pump 1
Pump 2
Secondary bypass valve
Primary deny valve
Hot Water Heating System Boilers
Pump 1
Pump 2g pHot Water Station Pump 1
Pump 2
Pump 3
Glycol secondary bypass valve
HW secondary bypass valve
HT HW valve 1
HT HW valve 2
Domestic Hot Water System
Mechanical Plant Monitored Points
Electrical Plant Monitored Points
Plumbing Plant Monitored Points
Space Temperatures
MPA L1227 Page 11 December 2013
EXHIBIT II-C AHU TYPE A Master Buiding Control System - RFP
MAPPED POINTS TO MBCS TYPESHAREDPOINTS LOGGING
TYPICAL PLANT POINT TAG POINT DECSRIPTION
BIBOAIAOAVBVMS RE
AD/W
RITE
TREN
D LOG
HOURS
RUN
SCHED
ULED SETPO
INT
SETP
OINT
ENGINEERING UNITS
STAT
E TEXT
AHU Type AFor Airport Facilities HVAC Dept.
Supply Fan
Supply fan enable/disable BV R/W
0=Off
1=Enabled
Supply fan status BV R 0=Off
1=Running
Supply fan speed control AV R/W %
Supply fan feedback AV R Hz
Supply air volume AV R/W cfm
Return Fan
Return fan enable/disable BV R/W
0=Off
1=Enabled
Return fan status BV R 0=Off
1=Running
Return fan speed control AV R/W Return fan feedback AV R Hz
Return air volume AV R/W cfm
Electric Heater Battery
Heater stage 1 command BV R/W 0=Off
1=Enabled
Heater stage 2 command BV R/W
0=Off
1=Enabled
InstrumentsOutdoor air damper control AV R/W %
Economiser air damper control AV R/W %
Exhaust air damper control AV R/W %
Face and bypass damper control AV R/W %
Heating coil valve control AV R/W %
Supply static pressure AV R/W " WC
Return static pressure AV R/W " WC
Pre filter differential pressure AV R/W " WC
Outdoor Air flow AV R cfm
Mixed air temperature AV R °F
Hot water coil temperature AV R °F
Supply air temperature AV R °F
Frost thermostat BV R
0=Normal
1=Alarm
SetpointsSupply static pressure AV R/W " WC
Supply air temperature AV R/W °F
Pre‐filter differential pressure AV R/W " WC
Alarms
Supply fan fail BV R 0=Normal
1=Alarm
Return fan fail BV R 0=Normal
1=Alarm
High temperature trip BV R 0=Normal
1=Alarm
Low/high pressure trip BV R 0=Normal
1=Alarm
Frost trip BV R 0=Normal
1=Alarm
AHU shutdown alarm BV R 0=Normal
1=Alarm
AHU reset
SchedulesTime schedule BV R/W
Manual override MS R/W
0=Off
1=Auto
2=On
For Building Control
Supply and return fan status BV R
0=Off
1=Running
Alarms
AHU shutdown alarm BV R 0=Normal
1=Alarm
Total 38
Notes1 Time schedule includes Schedule and Calender functions
2 BI=Binary Input
BO=Binary Output
AI=Analog Input
AO=Analog Output
AV= Analog Value
BV=Binary Value
MS=Multi‐State (Input or Output)
MPA L1227 Page 12 December 2013
EXHIBIT II-D AHU TYPE B Master Building Control System - RFP
MAPPED POINTS TO MBCS TYPESHAREDPOINTS LOGGING
TYPICAL PLANT POINT TAG POINT DECSRIPTION
BIBOAIAOAVBVMS RE
AD/W
RITE
TREN
D LOG
HOURS
RUN
SCHED
ULED SETPO
INT
SETP
OINT
ENGINEERING UNITS
STAT
E TEXT
AHU Type BFor Airport Facilities HVAC Dept.
Supply Fan
Supply fan enable/disable BV R/W
0=Off
1=Enabled
Supply fan status BV R 0=Off
1=Running
Supply fan speed control AV R/W %
Supply fan feedback AV R Hz
Supply air volume AV R/W cfm
DX Cooler
Enable/disable BV R/W 0=Off
1=Enabled
Status BV R/W
0=Off
1=Enabled
InstrumentsOutdoor air damper control 1 AV R/W %
Outdoor air damper control 2 AV R/W %
Economiser air damper control AV R/W %
Heating coil valve control AV R/W %
Pre filter differential pressure AV R/W " WC
Outdoor air flow AV R cfm
Supply air flow AV R cfm
Outdoor air temperature AV R °F
Return air temperature AV R °F
Supply air temperature AV R °F
Space temperature AV R °F
Outdoor air CO2 AV R ppm
Return air CO2 AV R ppm
Space CO2 AV R ppm
Outdoor air relative humiidty AV R %rH
Return air relative humiidty AV R %rH
Frost thermostat BV R
0=Normal
1=Alarm
SetpointsSupply air temperature AV R/W °F
Space temperature AV R/W °F
Pre‐filter differential pressure AV R/W " WC
Alarms
Supply fan fail BV R 0=Normal
1=Alarm
Low/high pressure trip BV R 0=Normal
1=Alarm
Frost trip BV R 0=Normal
1=Alarm
AHU shutdown alarm BV R 0=Normal
1=Alarm
AHU reset
SchedulesTime schedule BV R/W
Manual override MS R/W
0=Off
1=Auto
2=On
For Building Control
Supply fan status BV R
0=Off
1=Running
Alarms
AHU shutdown alarm BV R
0=Normal
1=Alarm
Total 35
Notes1 Time schedule includes Schedule and Calender functions
2 BI=Binary Input
BO=Binary Output
AI=Analog Input
AO=Analog Output
AV= Analog Value
BV=Binary Value
MS=Multi‐State (Input or Output)
MPA L1227 Page 13 December 2013
EXHIBIT II-E AHU TYPE C Master Building Control System - RFP
MAPPED POINTS TO MBCS TYPESHAREDPOINTS LOGGING
TYPICAL PLANT POINT TAG POINT DECSRIPTION
BIBOAIAOAVBVMS RE
AD/W
RITE
TREN
D LOG
HOURS
RUN
SCHED
ULED SETPO
INT
SETP
OINT
ENGINEERING UNITS
STAT
E TEXT
AHU Type CFor Airport Facilities HVAC Dept.
Supply Fan
Supply fan enable/disable BV R/W
0=Off
1=Enabled
Supply fan status BV R 0=Off
1=Running
Supply fan speed control AV R/W Hz
Supply fan feedback AV R Hz
Supply air volume AV R/W cfm
Return Fan
Return fan enable/disable BV R/W
0=Off
1=Enabled
Return fan status BV R 0=Off
1=Running
Return fan speed control AV R/W Hz
Return fan feedback AV R Hz
Return air volume AV R/W cfm
InstrumentsEconomiser air damper control AV R/W PSI
Relief air damper control AV R/W PSI
Cooling coil valve control AV R/W PSI
Heating coil valve control AV R/W PSI
Supply static pressure AV R/W " WC
Panel filter differential pressure BV R Carbon filter differential pressure BV R Outdoor air flow AV R/W cfm
Mixed air temperature AV R °F
Pre‐cooling coil temperature AV R °F
Supply air temperature AV R °F
Return air temperature AV R °F
Return air relative humidity AV R %rH
Frost thermostat BV R
0=Normal
1=Alarm
SetpointsSupply static pressure AV R/W " WC
Supply air temperature AV R/W °F
Alarms
Supply fan fail BV R 0=Normal
1=Alarm
Return fan fail BV R 0=Normal
1=Alarm
Frost trip BV R 0=Normal
1=Alarm
AHU shutdown alarm BV R 0=Normal
1=Alarm
AHU reset
SchedulesTime schedule BV R/W
Manual override MS R/W
0=Off
1=Auto
2=On
For Building Control
Supply and return fan status BI R
0=Off
1=Running
Alarms
AHU shutdown alarm BV R
0=Normal
1=Alarm
Total 34
Notes1 Time schedule includes Schedule and Calender functions
2 BI=Binary Input
BO=Binary Output
AI=Analog Input
AO=Analog Output
AV= Analog Value
BV=Binary Value
MS=Multi‐State (Input or Output)
MPA L1227 Page 14 December 2013
EXHIBIT II-F Fans Master Building Control System - RFP
MAPPED POINTS TO MBCS TYPESHAREDPOINTS LOGGING
TYPICAL PLANT POINT TAG POINT DECSRIPTION
BIBOAIAOAVBVMS RE
AD/W
RITE
TREN
D LO
G
HOURS
RUN
SCHED
ULED SETPO
INT
SETP
OINT
ENGINEERING UNITS
STAT
E TEXT
Exhaust Fan Type 1For Airport Facilities HVAC Dept. Exhaust Fan
Exhaust fan enable/disable BV R/W
0=Off
1=Enabled
Exhaust fan status BV R
0=Off
1=Running
Alarms
Exhaust fan shutdown alarm BV R
0=Normal
1=Alarm
Exhaust fan reset
SchedulesTime schedule
Manual Override MS R/W
0=Off
1=Auto
2=On
For Building Control Exhaust fan status BV R
0=Off
1=Running
Alarms
Exhaust fan shutdown alarm BV R
0=Normal
1=Alarm
Total 6
Exhaust Fan Type 2
For Airport Facilities HVAC Dept. Exhaust Fan
Exhaust fan enable/disable BV R/W
0=Off
1=Enabled
Exhaust fan status BV R
0=Off
1=Running
Exhaust fan speed control AV R/W %
Exhaust fan feedback AV R Hz
Alarms
Exhaust fan shutdown alarm BV R
0=Normal
1=Alarm
Exhaust fan reset
SchedulesTime schedule
Manual Override MS R/W
0=Off
1=Auto
2=On
For Building Control Exhaust fan status BV R
0=Off
1=Running
Alarms
Exhaust fan shutdown alarm BV R
0=Normal
1=Alarm
Total 8
Stair PressurisationFor Airport Facilities HVAC Dept. Supply Fan
Supply fan enable/disable BV R/W
0=Off
1=Enabled
Supply fan status BV R
0=Off
1=Running
Supply fan speed control AV R/W %
Supply fan feedback AV R Hz
Static pressure AV R "WC
SetpointsStatic pressure AV R/W " WC
Alarms
Supply fan shutdown alarm BV R
0=Normal
1=Alarm
Supply fan reset
For Building Control Supply fan status BV R
0 Off
1=Running
Total 8
MPA L1227 Page 15 December 2013
EXHIBIT II-F Fans Master Building Control System - RFP
MAPPED POINTS TO MBCS TYPESHAREDPOINTS LOGGING
TYPICAL PLANT POINT TAG POINT DECSRIPTION
BIBOAIAOAVBVMS RE
AD/W
RITE
TREN
D LO
G
HOURS
RUN
SCHED
ULED SETPO
INT
SETP
OINT
ENGINEERING UNITS
STAT
E TEXT
Destratification Fan
For Airport Facilities HVAC Dept. Fan
Fan enable/disable BV R/W
0=Off
1=Enabled
Fan status BV R
0=Off
1=Running
Fan speed control AV R/W %
Fan feedback AV R Hz
Temperature ceiling AV R °F
Temperature floor AV R °F
SetpointsCooling minimum AV R/W °F
Cooling maximum AV R/W °F
AlarmsFan fail BV R Fan reset
SchedulesTime schedule
Manual Override MS R/W
0=Off
1=Auto
2=On
For Building Control Fan status BV R
0=Off
1=Running
Total 11
Notes1 Time schedule includes Schedule and Calender functions
2 BI=Binary Input
BO=Binary Output
AI=Analog Input
AO=Analog Output
AV= Analog Value
BV=Binary Value
MS=Multi‐State (Input or Output)
MPA L1227 Page 16 December 2013
EXHIBIT II-G TERMINAL UNITS Master Building Control System - RFP
MAPPED POINTS TO MBCS TYPESHAREDPOINTS LOGGING
TYPICAL PLANT POINT TAG POINT DECSRIPTION
BIBOAIAOAVBVMS RE
AD/W
RITE
TREN
D LOG
HOURS
RUN
SCHED
ULED SETPO
INT
SETP
OINT
ENGINEERING UNITS
STAT
E TEXT
VAV Type 1 Supply VAV box
For Airport Facilities HVAC Dept. Damper position AV R/W %
0=Off
1=Enabled
Supply air flow AV R cfm
Zone temperature AV R °FURL Link to AHU BV R
SetpointsZone temperature AV R/W °F
AlarmsZone temperature low BV R Zone temperature high BV R
SchedulesTime Schedule
For Building Control Zone temperature AV R °F
Total 8
VAV Type 2 Supply VAV box + HW Heater
For Airport Facilities HVAC Dept. Damper position AV R/W %
0=Off
1=Enabled
Supply air flow AV R cfm
Heating coil valve control AV R/W %
Supply air temperature AV R °F
Zone temperature AV R °F
URL Link to AHU BV R
SetpointsZone temperature setpoint AV R/W °F
AlarmsZone temperature low BV R Zone temperature high BV R
SchedulesTime Schedule
For Building Control Zone temperature AV R °F
Total 10
VAV Type 3 Supply VAV box + radiator
For Airport Facilities HVAC Dept. Fan enable/disable BV R/W
0=Off
1=Enabled
Fan status BV R
0=Off
1=Running
Damper position BV R/W %
0=Off
1=Enabled
Supply air flow AV R cfm
Heating coil valve control AV R/W %
Supply air temperature AV R °F
Radiator valve control AV R/W %
Zone temperature AV R °F
URL Link to AHU BV R
SetpointsZone temperature setpoint AV R/W °F
AlarmsZone temperature low BV R Zone temperature high BV R
SchedulesTime Schedule
For Building Control Zone temperature AV R °F
Total 13
Fan Powered VAV Box
For Airport Facilities HVAC Dept. Damper position BV R/W %
0=Off
1=Enabled
Supply air flow AV R cfm
Heating coil valve control AV R/W %
Supply air temperature AV R °F
AHU supply air temperature AV R °F
Zone temperature AV R °F
URL Link to AHU BV R
SetpointsZone temperature AV R/W °F
MPA L1227 Page 17 December 2013
EXHIBIT II-G TERMINAL UNITS Master Building Control System - RFP
MAPPED POINTS TO MBCS TYPESHAREDPOINTS LOGGING
TYPICAL PLANT POINT TAG POINT DECSRIPTION
BIBOAIAOAVBVMS RE
AD/W
RITE
TREN
D LOG
HOURS
RUN
SCHED
ULED SETPO
INT
SETP
OINT
ENGINEERING UNITS
STAT
E TEXT
AlarmsZone temperature low BV R Zone temperature high BV R Fan fail BV R
SchedulesTime Schedule
For Building Control Zone temperature AV R °F
Total 12
Fan Coil Unit
For Airport Facilities HVAC Dept. Fan enable/disable BV R/W
0=Off
1=Enabled
Fan status BV R
0=Off
1=Running
Cooling coil valve control AV R/W %
Supply air temperature AV R °F
Return air temperature AV R °F
Zone temperature AV R °F
SetpointsZone temperature AV R/W °F
AlarmsZone temperature low BV R Zone temperature high BV R Fan fail BV R Fan reset
SchedulesTime Schedule
For Building Control Zone temperature AV R °F
Total 11
Duct Heating Coil
For Airport Facilities HVAC Dept. Heating coil valve control AV R/W %
Supply air temperature AV R °F
Zone temperature AV R °F
URL Link to AHU BV R
SetpointsZone temperature setpoint AV R/W °F
AlarmsZone temperature low BV R Zone temperature high BV R
Time Schedule
For Building Control Zone temperature AV R °F
Total 8
HW Unit Heater
For Airport Facilities HVAC Dept. Heater enable/disable BV R/W
0=Off
1=Enabled
Heating coil valve control BV R/W
0=Closed
1=Open
Zone temperature AV R °F
SetpointsZone temperature setpoint AV R/W °F
AlarmsZone temperature low BV R Zone temperature high BV R
SchedulesTime Schedule
Manual Override MS R/W
0=Off
1=Auto
2=On
For Building Control Zone temperature AV R °F
Total 8
MPA L1227 Page 18 December 2013
EXHIBIT II-G TERMINAL UNITS Master Building Control System - RFP
MAPPED POINTS TO MBCS TYPESHAREDPOINTS LOGGING
TYPICAL PLANT POINT TAG POINT DECSRIPTION
BIBOAIAOAVBVMS RE
AD/W
RITE
TREN
D LOG
HOURS
RUN
SCHED
ULED SETPO
INT
SETP
OINT
ENGINEERING UNITS
STAT
E TEXT
Door Air Curtain
For Airport Facilities HVAC Dept. Curtain enable/disable BV R/W
0=Off
1=Enabled
Fan status BV R
0=Off
1=Running
Heating coil valve control AV R/W %
Supply air temperature AV R °F
Return air temperature AV R °F
Door status BV R
0=Closed
1=Open
SetpointsSupply air temperature setpoint AV R/W °F
AlarmsReturn air temperature low BV R Return air temperature high BV R
SchedulesTime Schedule
Manual Override MS R/W
0=Off
1=Auto
2=On
For Building Control Return air temperature AV R °F
Total 11
Infrared Heater
For Airport Facilities HVAC Dept. Heater enable/disable BV R/W
0=Off
1=Enabled
Blower status BV R
0=Off
1=Running
Vacuum pump status BV R
0=Off
1=Running
Temperature Zone 1 AV R °F
Temperature Zone 2 AV R °F
SetpointsZone 1 occupied AV R/W °F
Zone 1 unoccupied AV R/W °F
Zone 2 occupied AV R/W °F
Zone 2 unoccupied AV R/W °F
AlarmsBlower alarm BV R Vacuum pump alarm BV R Heater reset
SchedulesTime schedule
Manual Override MS R/W
0=Off
1=Auto
2=On
For Building Control Blower status BV R
0=Off
1=Running
Total 12
Fined Tube Heating
For Airport Facilities HVAC Dept. Heating coil valve control AV R/W %
Space temperature AV R °F
SetpointsSpace temperature AV R/W °F
AlarmsZone temperature low BV R Zone temperature high BV R
SchedulesTime schedule
Manual override MS R/W
0=Off
1=Auto
2=On
For Building Control Space temperature AV R/W °F
Total 7
Gas Fired Unit Heater
MPA L1227 Page 19 December 2013
EXHIBIT II-G TERMINAL UNITS Master Building Control System - RFP
MAPPED POINTS TO MBCS TYPESHAREDPOINTS LOGGING
TYPICAL PLANT POINT TAG POINT DECSRIPTION
BIBOAIAOAVBVMS RE
AD/W
RITE
TREN
D LOG
HOURS
RUN
SCHED
ULED SETPO
INT
SETP
OINT
ENGINEERING UNITS
STAT
E TEXT
For Airport Facilities HVAC Dept. Heater enable/disable BV R/W
0=Off
1=Enabled
Heater status BV R
0=Off
1=Running
Room temperature AV R °F
SetpointsRoom temperature AV R/W °F
AlarmsSafety circuit open BV R Heater reset
SchedulesTime schedule
Manual Override MS R/W
0=Off
1=Auto
2=On
For Building Control Heater status BV R
0=Off
1=Running
Total 7
Air Cooled Condenser Unit
For Airport Facilities HVAC Dept. Unit enable/disable BV R/W
0=Off
1=Enabled
Unit status BV R
0=Off
1=Running
Room temperature AV R °F
Supply air temperature AV R °F
SetpointsRoom temperature AV R/W °F
Time schedule
Manual Override MS R/W
0=Off
1=Auto
2=On
AlarmsUnit failed BV R Unit reset
SchedulesTime schedule
Manual Override MS R/W
0=Off
1=Auto
2=On
For Building Control Heater status BV R
0=Off
1=Running
Total 9
Notes1 Time schedule includes Schedule and Calendar functions
2 BI=Binary Input
BO=Binary Output
AI=Analog Input
AO=Analog Output
AV= Analog Value
BV=Binary Value
MS=Multi‐State (Input or Output)
MPA L1227 Page 20 December 2013
EXHIBIT II-H HOT WATER HEATING Master Building Control System - RFP
TYPICAL I/OEngineering MAPPED POINTS TO MBCS TYPE
SHAREDPOINTS LOGGING
TYPICAL PLANT POINT TAG POINT DECSRIPTION
BIBOAIAOAVBVMS RE
AD/W
RITE
TREN
D LO
G
HOURS
RUN
SCHE
DULED SETP
OINT
SETP
OINT
ENGINEERING UNITS
STAT
E TEXT
Hot Water Heating
For Airport Facilities HVAC Dept. Boilers
Boilers enable/disable BV R/W
0=Off
1=Enabled
Boiler 1 status BV R 0=Off
1=Running
Boiler 2 status BV R 0=Off
1=Running
Boiler firing rate AV R %
Boiler header temperature AV R °F
Pump 1
Pump enable/disable BV R/W
0=Off
1=Enabled
Pump status BV R 0=Off
1=Running
Pump speed control AV R/W %
Pump feedback AV R Hz
Pump 2
Pump enable/disable BV R/W
0=Off
1=Enabled
Pump status BV R 0=Off
1=Running
Pump speed control AV R/W %
Pump feedback AV R Hz
ComponentsBypass valve AV R/W %
InstrumentsDifferential pressure AV R/W psi
Return water flow AV R gpm
SetpointsSupply differential pressure setpoint AV R/W psi
Boiler header temperature AV R/W °F
Alarms
Boiler 1 fail BV R 0=Normal
1=Alarm
Boiler 2 fail BV R 0=Normal
1=Alarm
Pump 1 fail BV R 0=Normal
1=Alarm
Pump 2 fail BV R 0=Normal
1=Alarm
Boiler reset
Pump reset
SchedulesTime schedule
Manual Override MS R/W
0=Off
1=Auto
2=On
For Building Control Any boiler status BV R
0=Off
1=Running
Any pump status BV R
0=Off
1=Running
Alarms
Hot water heating shutdown alarm BV R
0=Normal
1=Alarm
Total 26
Domestic Hot Water
For Airport Facilities HVAC Dept. Heaters enable/disable BV R/W
0=Off
1=Enabled
Storage temperature AV R °F
SetpointsStorage temperature AV R/W °F
Alarms
Low storage temperature BV R 0=Normal
1=Alarm
High storage temperature BV R 0=Normal
1=Alarm
DHW leak alarm BV R 0=Normal
1=Alarm
System reset
SchedulesTime schedule
Manual override MS R/W
0=Off
1=Auto
2=On
For Building Control Storage temperature AV R °F
Alarms
Any alarm BV R
0=Normal
1=Alarm
Total 9
Notes1 Time schedule includes Schedule and Calender functions
2 BI=Binary Input
BO=Binary Output
AI=Analog Input
AO=Analog Output
AV= Analog Value
BV=Binary Value
MS=Multi‐State (Input or Output)
MPA L1227 Page 21 December 2013
EXHIBIT II-I HT HW STATION Master Building Control System - RFP
TYPICAL I/OEngineering MAPPED POINTS TO MBCS TYPE
SHAREDPOINTS LOGGING
TYPICAL PLANT POINT TAG POINT DECSRIPTION
BIBOAIAOAVBVMS RE
AD/W
RITE
TREN
D LOG
HOURS
RUN
SCHED
ULED SETPO
INT
SETP
OINT
ENGINEERING UNITS
STAT
E TEXT
High Temp HW Station
For Airport Facilities HVAC Dept. Pump 1
Pump enable/disable BV R/W
0=Off
1=Enabled
Pump status BV R 0=Off
1=Running
Pump speed control AV R/W %
Pump feedback AV R Hz
Pump 2
Pump enable/disable BV R/W
0=Off
1=Enabled
Pump status BV R 0=Off
1=Running
Pump speed control AV R/W %
Pump feedback AV R Hz
Pump 3
Pump enable/disable BV R/W
0=Off
1=Enabled
Pump status BV R 0=Off
1=Running
Pump speed control AV R/W %
Pump feedback AV R Hz
ComponentsGlycol hot water bypass valve AV R/W %
Reheat hot water bypass valve AV R/W %
Steam valve 1 AV R/W %
Steam valve 2 AV R/W %
InstrumentsFlow temperature ‐ primary HTHW AV R °F
Return temperature ‐ primary HTHW AV R °F
Flow temperature ‐ sec HW reheat AV R °F
Return temperature ‐ sec HW reheat AV R °F
Flow temperature ‐ secondary glycol AV R °F
Return temperature ‐ secondary glycol AV R °F
SetpointsHeat exchanger temperature 1 AV R/W °F
Heat exchanger temperature 2 AV R/W °F
Differential pressure ‐secondary AV R/W psi
Differential pressure ‐secondary AV R/W psi
Differential pressure ‐secondary AV R/W psi
Return temperature ‐ primary AV R/W °F
Alarms
Pump 1 fail BV R 0=Normal
1=Alarm
Pump 2 fail BV R 0=Normal
1=Alarm
Pump 3 fail BV R 0=Normal
1=Alarm
Pump reset
SchedulesTime schedule
Manual override MS R/W
0=Off
1=Auto
2=On
For Building Control Pump 1
Pump enable/disable BV R/W
0=Off
1=Enabled
Pump status BV R
0=Off
1=Running
Pump 2
Pump enable/disable BV R/W
0=Off
1=Enabled
Pump status BV R
0=Off
1=Running
Pump 3
Pump enable/disable BV R/W
0=Off
1=Enabled
Pump status BV R 0=Off
1=Running
Flow temperature ‐ primary HTHW AV R °F
Return temperature ‐ primary HTHW AV R °F
Flow temperature ‐ sec HW reheat AV R °F
Return temperature ‐ sec HW reheat AV R °F
Flow temperature ‐ secondary glycol AV R °F
Return temperature ‐ secondary glycol AV R °F
Alarms
All pumps fail BV R
0=Normal
1=Alarm
Total 45
Notes1 Time schedule includes Schedule and Calender functions
2 BI=Binary Input
BO=Binary Output
AI=Analog Input
AO=Analog Output
AV= Analog Value
BV=Binary Value
MS=Multi‐State (Input or Output)
MPA L1227 Page 22 December 2013
EXHIBIT II-J CHILLED WATER Master Building Control System - RFP
TYPICAL I/OEngineering MAPPED POINTS TO MBCS TYPE
SHAREDPOINTS LOGGING
TYPICAL PLANT POINT TAG POINT DECSRIPTION
BIBOAIAOAVBVMS RE
AD/W
RITE
TREN
D LO
G
HOURS
RUN
SCHED
ULED SETP
OINT
SETP
OINT
ENGINEERING UNITS
STAT
E TEXT
Chilled Water
For Airport Facilities HVAC Dept. Chiller
Chiller enable/disable BV R/W
0=Off
1=Enabled
Pump 1
Pump enable/disable BV R/W
0=Off
1=Enabled
Pump status BV R
0=Off
1=Running
Pump 2
Pump enable/disable BV R/W
0=Off
1=Enabled
Pump status BV R
0=Off
1=Running
InstrumentsFlow meter AV R/W gpm
Return temperature AV R/W °F
Flow temperature AV R/W °F
Alarms
Chiller fail BV R
0=Normal
1=Alarm
Pump 1 fail BV R
0=Normal
1=Alarm
Pump 2 fail BV R
0=Normal
1=Alarm
Chiller reset BO R/W
Pump reset BO R/W
Manual Override MS R/W
0=Off
1=Auto
2=On
For Building Control Chiller enable/disable BV R/W
0=Off
1=Enabled
Any pump status BV R
0=Off
1=Running
Alarms
Any alarm BV R
0=Normal
1=Alarm
Total 17
Notes1 Time schedule includes Schedule and Calendar functions
2 BI=Binary Input
BO=Binary Output
AI=Analog Input
AO=Analog Output
AV= Analog Value
BV=Binary Value
MS=Multi‐State (Input or Output)
MPA L1227 Page 23 December 2013
EXHIBIT II-K CHILLED WATER STATION Master Building Control System - RFP
TYPICAL I/OEngineering MAPPED POINTS TO MBCS TYPE
SHAREDPOINTS LOGGING
TYPICAL PLANT POINT TAG POINT DECSRIPTION
BIBOAIAOAVBVMS RE
AD/W
RITE
TREN
D LOG
HOURS
RUN
SCHED
ULED SETPO
INT
SETP
OINT
ENGINEERING UNITS
STAT
E TEXT
Chilled Water Station
For Airport Facilities HVAC Dept. Pump P1
Pump enable/disable BV R/W
0=Off
1=Enabled
Pump status BV R 0=Off
1=Running
Pump speed control AV R/W %
Pump feedback AV R Hz
Pump 2
Pump enable/disable BV R/W
0=Off
1=Enabled
Pump status BV R 0=Off
1=Running
Pump speed control AV R/W %
Pump feedback AV R Hz
ComponentsBypass valve AV R/W %
Deny valve AV R/W %
InstrumentsFlow ‐primary AV R gpm
Differential pressure ‐secondary AV R/W psi
Differential pressure ‐secondary AV R/W psi
Differential pressure ‐secondary AV R/W psi
Flow temperature ‐ primary AV R °F
Return temperature ‐ primary AV R °F
Flow temperature ‐ secondary AV R °F
Return temperature ‐ secondary AV R °F
SetpointsDifferential pressure ‐secondary AV R/W psi
Differential pressure ‐secondary AV R/W psi
Differential pressure ‐secondary AV R/W psi
Return temperature ‐ primary AV R/W °F
Alarms
Pump 1 fail BV R 0=Normal
1=Alarm
Pump 2 fail BV R 0=Normal
1=Alarm
Pump reset
SchedulesTime schedule
Manual override MS R/W
0=Off
1=Auto
2=On
For Building Control Pump P1
Pump enable/disable BV R/W
0=Off
1=Enabled
Pump status BV R 0=Off
1=Running
Pump speed control AV R/W %
Pump feedback AV R Hz
Pump 2
Pump enable/disable BV R/W
0=Off
1=Enabled
Pump status BV R 0=Off
1=Running
Pump speed control AV R/W Hz
Pump feedback AV R Hz
Flow temperature ‐ primary AV R °F
Return temperature ‐ primary AV R °F
Flow temperature ‐ secondary AV R °F
Return temperature ‐ secondary AV R °F
Alarms
Both pumps shutdown alarm BV R 0=Normal
1=Alarm
Total 38
Notes1 Time schedule includes Schedule and Calender functions
2 BI=Binary Input
BO=Binary Output
AI=Analog Input
AO=Analog Output
AV= Analog Value
BV=Binary Value
MS=Multi‐State (Input or Output)
MPA L1227 Page 24December 2013
EXHIBIT II-L MONITORING Master Building Control System - RFP
MAPPED POINTS TO MBCS TYPESHAREDPOINTS LOGGING
TYPICAL PLANT POINT TAG POINT DECSRIPTION
BIBOAIAOAVBVMS RE
AD/W
RITE
TREN
D LO
G
HOURS
RUN
SCHED
ULED SETP
OINT
SETP
OINT
ENGINEERING UNITS
STAT
E TEXT
CO2
For Airport Facilities HVAC Dept. InstrumentsCarbon dioxide AV R ppm
Setpoint AV R/W ppm
Total 2
COFor Airport Facilities HVAC Dept. Instruments
Carbon monoxide AV R ppm
Setpoint AV R/W ppm
Total 2
Differential PressureFor Airport Facilities HVAC Dept. Instruments
Differential pressure AV R "WC
Setpoint AV R/W "WC
Total 2
Space TemperatureFor Airport Facilities HVAC Dept. Instruments
Space temperature AV R °F
Setpoint AV R/W °F
Total 2
Plumbing Plant
For Airport Facilities HVAC Dept. Alarm BV R
0=Normal
1=Alarm
Total 1
Mechanical Plant
For Airport Facilities HVAC Dept. Alarm BV R
0=Normal
1=Alarm
Total 1
Electrical Plant
For Airport Facilities HVAC Dept. Alarm BV R
0=Normal
1=Alarm
Total 1
Weather StationInstrumentsTemperature AV R °F
Relative humidity AV R %rH
Total 2
Notes1 Time schedule includes Schedule and Calender functions
2 BI=Binary Input
BO=Binary Output
AI=Analog Input
AO=Analog Output
AV= Analog Value
BV=Binary Value
MS=Multi‐State (Input or Output)
MPA L1227 Page 25 December 2013
Master Building Control System - RFP
MPA L1227 Page 26 December 2013
III. PROPOSAL AND SELECTION PROCESS A. Proposal Process
It is Massport's intent to maintain the following schedule for the proposal and selection processes:
Step
Description
Date
RFP Released Massport issues RFP. December 5, 2013
Last Day for Written Questions
MBCS Integrator will be allowed to submit inquiries and questions through this date. Inquiries may be submitted via E-mail to CPBidquestions@massport.com
December 30, 2013
Pre-proposal Conference
Massport will conduct onsite Pre-proposal meeting. An optional meeting for MBCS Integrators to ask Massport personnel questions regarding the RFP
11:00 A.M., January 7, 2014
Official Answers Published (Estimated)
Massport will issue all answers regarding this RFP in writing by this date, including responses to all written questions received and those posed at the pre-proposal conference.
January 14, 2014
Submission of Proposals
MBCS Integrators will submit detailed proposals in conformance with the requirements of this RFP by this date and time.
12:00 P.M., January 28, 2014
Review of Proposals
Massport’s evaluation committee will review the proposals received in accordance with the evaluation criteria set forth elsewhere in this document.
January 29- February 14, 2014
Oral Presentations and tour of MBCS reference site (Estimated)
MBCS Integrators may be notified by February 17 of the date and time for presentations and tours, if these are required.
Week of February 24, 2014.
Final Selection (Estimated)
Massport will notify the selected MBCS Integrator. March 4, 2014
Contracting Execution of a contract with chosen MBCS Integrator March 4- April 4, 2014
Work Commences Kick off meeting April 4, 2014
Master Building Control System - RFP
MPA L1227 Page 27 December 2013
B. Written Questions
All questions prior to the Pre-proposal Conference pertaining to this Request for Proposal (“RFP”) shall be submitted in writing (email) to CPBidquestions@massport.com . All questions must be received by Massport by the date and time specified for the last day for written questions in the schedule above. Massport will provide a written summary of the questions and answers which will be sent to the principal representative of each RFP holder.
C. Pre-proposal Conference
This is an optional meeting at which MBCS Integrators may ask Massport personnel questions regarding the MBCS project context and the RFP in particular. The meeting will be held at 11:00 A.M., January 7, 2014, at the Logan Office Center, One Harborside Drive, East Boston, MA (at Logan Airport). The Security Desk personnel in the Lobby will sign attendees in and will direct them to the scheduled conference room.
D. Answers to Questions Regarding the RFP
Clarifications, interpretations, and responses to written questions regarding this RFP, as prepared by Massport, will be issued to the principal representative of each RFP holder. Revisions to the RFP documents will be issued as addenda to the RFP. All Q/A responses and addenda will be issued as specified in the schedule above.
E. Proposal Submission
Massport requires submittal of your complete RFP response in both printed and PDF format. The MBCS Integrator’s response to this RFP (the Proposal) shall be provided as ten (10) copies of a bound document and one PDF version on disc. Submissions shall be printed on both sides of the sheet (8 1/2" x 11"), no acetate covers - each limited to 20 sheets double-sided (40 pages) exclusive of cover letter, price proposal, and proposal appendices (resumes, SDO certification letters, etc.), covers, and dividers. The Vendor shall also provide an original and ten (10) copies of litigation and legal proceedings information, signed under the pains and penalties of perjury, in a separate sealed envelope entitled “Litigation and Legal Proceedings”. See http://www.massport.com/doing-business/_Pages/CapitalProgramsResourceCenter.aspx for more details on litigation and legal proceedings history submittal requirements. This submission, including the litigation and legal proceedings history in a separate sealed envelope as required, shall be delivered in a sealed package not later than 12:00 P.M., Tuesday, January 28, 2014 to:
Houssam H. Sleiman, P.E., CCM Director of Capital Programs and Environmental Affairs Massachusetts Port Authority Capital Programs Department Office, Suite 209S Logan Office Center One Harborside Drive, East Boston, Massachusetts 02128
Your Proposal must be received at the Capital Programs Department Bid Counter. Proposals received after the time and date stated above will be marked as late and may not be considered. The proposal package shall be labeled "Proposal for System Integration Services, MBCS".
Master Building Control System - RFP
MPA L1227 Page 28 December 2013
F. Proposal Guarantee
A proposal guarantee must be submitted with each proposal in the amount of 5% of the total bid amount in the form of a proposal bond, a certified check or treasurers’ check, issued by a responsible bank or trust company acceptable to the Massachusetts Port Authority, made payable to the Massachusetts Port Authority in the name of the entity under which the contract for the work is to be executed.
G. Evaluation
The Authority is soliciting competitive proposals pursuant to a determination that such a process best serves the interests of the Authority and the general public, and not because of any legal requirement to do so. The Authority reserves the right to accept one or more of the proposals, to award the entire contract or portions of the contract to one or more proposers, to reject any or all proposals, to waive any informality of the proposal or the proposal form, to modify or amend with the consent of the proposer any proposal or prior to acceptance, and to effect any agreements(s) otherwise, all as the Authority in its sole judgment may deem to b in its best interest. Those proposals which meet the requirements of this RFP and which are deemed to represent a beneficial solution to Massport's needs will be further evaluated by criteria identified on the following tables. Proposals which fail to meet the requirements of this RFP or which are otherwise deemed non-responsive shall not receive further consideration. Massport may make such investigations as it deems necessary to determine the ability of the MBCS Integrator to perform the work. The MBCS Integrator shall furnish to Massport all such references, information, and data for this purpose as may be requested. Massport reserves the right to reject any proposal if evidence submitted by, or investigation of, the MBCS Integrator fails to satisfy Massport that such MBCS Integrator is properly qualified to carry out the obligations of the Contract and to complete work contemplated therein. Massport, at its sole direction, may select one or more proposals with which to proceed for further consideration and/or negotiations. In selecting a MBCS Integrator to provide professional services, Massport will consider the information in the proposals and shall include, but not be limited to, consideration of the following evaluation criteria:
Master Building Control System - RFP
MPA L1227 Page 29 December 2013
MBCS Evaluation Criteria
SCORE WEIGHT
Integrator Qualifications (1 - 5) 5 best
1 Strong positive references and level of experience in projects of similar scope and nature 10%
2 Demonstrated ability to execute projects of similar scope and range 25%
3
Qualifications of vender personnel assigned, relevance of each person's experience to the work to be performed under this proposal, and extent of BACnet experience 5%
4 Local Presence 5%
5
Experience with:
a. Carrier CCN Integration 5%
b. Automated Logic Integration 5%
c. Schneider Electric Integration 5%
d. Integration of other BACnet platforms 5%
6 Financial stability of the Integrator 5%
7
Ability to work within a team framework. This project requires close coordination between Massport's and the Integrator's teams in order to be successful 5%
8 Overall quality of the written proposal 10%
9 Quality of MBCS Integrator's proposed Work Plan and Schedule for carrying out the work 10%
10
Commitment to Affirmative Action and meaningful M/WBE subcontractor participation as well as employment of special groups of interest to Massport (i.e., residents of Impacted Communities)
5%
100%
Master Building Control System - RFP
MPA L1227 Page 30 December 2013
SCORE WEIGHT
MBCS Software Product (1-5) 5 best
1 Product licensing strategy 5%
2 Established platform 15%
3
Product features
a. Trending 5% b. Alarms 5% c. Graphics 5% d. Scheduling 5% e. Utilities (file conversion, etc.) 5% f. User-friendly 5%
4 Level of BACNet protocol administration 5%
5 Backward compatibility 5%
6 Ease of product administration 10%
7 Hardware compatibility (server) 5%
8 Web-based 5%
9 User security (application-layer) 20%
100%
COST
SCORE (1-5) 5 best
Master Building Control System - RFP
MPA L1227 Page 31 December 2013
G. Facility Tour and Oral Presentations
The MBCS Integrators may be requested to participate in an interview and provide an oral presentation to Massport’s Selection Committee. MBCS Integrators will be required to have a local installation of its MBCS system available for the Massport Selection Committee to tour. MBCS Integrators will be advised of the need for such activities and arrangements by the end of the day January 17, 2014. Oral presentation and interview, and site tours will be scheduled for the week of February 24, 2014.
H. Notification, Negotiation and Award
The selected MBCS Integrator will be notified promptly of its selection by the Selection Committee. The selected MBCS Integrator shall be expected to enter into an agreement with Massport, materially the same as the Draft Contract Agreement provided as Attachment B to this RFP unless the selected MBCS Integrator specifically notes suggested changes to such a contract in its Proposal. Massport will subsequently enter into negotiations with the chosen MBCS Integrator to establish mutually agreeable terms regarding the scope of services and/or compensation. All unsuccessful MBCS Integrators will be notified after the execution of an agreement. Non-acceptance of any proposal will be devoid of criticism and of any implication that the proposal was deficient. Non-acceptance of any proposal will mean only that another proposal was deemed to be more advantageous to Massport. Copies of all proposals and support material will be retained by Massport. If mutually agreeable contract terms cannot be reached after a reasonable length of time, Massport reserves the right to proceed with another bidder’s proposal or reevaluate its options.
Master Building Control System - RFP
MPA L1227 Page 32 December 2013
IV. PROPOSAL ORGANIZATION A. General Instructions
Proposals shall demonstrate a thorough understanding of the project requirements with emphasis on completeness and clarity of content. Proposals should concisely describe the approach to completing tasks, performing the services and delivering the items described in and required by Section II – System Integration Contract Objectives and Scope of Work of the RFP. Unsubstantiated statements addressing the requirements of this RFP such as "will comply as specified" will be considered non-responsive. Although certain technical explanations may be required, the Proposal language should accommodate a non-technical audience. The response shall be submitted in the format specified in the instructions below and shall include all completed forms required in the Exhibits and Attachments. The Proposal shall include the full legal name and business address of the MBCS Integrator, and shall be signed and dated by the person or persons authorized to contractually bind the MBCS Integrator. The state of incorporation shall be stated for each corporation that is party to the Proposal. The preparation of the Proposal and any subsequent presentations or other activities related to the Proposal shall be at the expense of the MBCS Integrator, and no subsequent compensation will be made. The rejection of any proposal in whole or in part will not render Massport liable for incurred costs and/or damages. Unless otherwise formally notified in writing by Massport, the contact point for all information and/or questions pertaining to this RFP shall be:
E-mail: CPBidquestions@massport.com
B. Proposal Format and Content
All proposals in the response to this RFP are to be presented following the format outlined below. The Proposal must address all of the requirements of this RFP and provide a complete and concise description of how the MBCS Integrator will perform the required project work. In addition to the narrative that comprises the response, the MBCS Integrator shall complete Exhibit D – Certificate of Compliance with Laws, provided in Attachment B – Draft Contract Provisions of this document. Failure on the part of the MBCS Integrator to complete the certificate form may be reason for rejection of the Proposal. The Proposal shall have the following format and order: A. Letter of Transmittal (Title Page)
B. Executive Summary
Table of Contents
Master Building Control System - RFP
MPA L1227 Page 33 December 2013
C. Scope of Work Part I: MBCS, System Installation and Implementation I-1. Understanding of the Project and Approach I-2. Proposed Work Plan and Schedule I-3. Price Proposal – Products and Services Costs I-4. Proposed Project Team and Qualifications I-5. Specific Relevant Experience and References I-6. Responses to particular questions I-7. Other Relevant Information (optional)
D. Scope of Work Part II: System Maintenance and Support II-1. Understanding of Massport’s Maintenance and Support Needs II-2. Proposed Service Level Alternatives II-3. Price Proposal for System Maintenance and Support II-4. Maintenance Team Organization and Qualifications II-5. Specific Relevant Experience and References II-6. Other Relevant Information (optional)
E. Proposal Appendices
1. MBCS Integrator’s Information a. Attachment A: Appendix D – Information Technology Technical Environment Matrix b. Attachment B: Exhibit D – Certificate of Compliance with Laws
2. Resumes of Key Project Team members and any proposed alternates 3. Organization Chart 4. Schedule 5. Compliance Statement regarding Technical Specifications 6. Cost Proposal
The Proposal components shall include the following content: A. Letter of Transmittal
The Letter of Transmittal must consist of a Cover Letter signed by an individual authorized to bind the MBCS Integrator contractually. It shall: • Briefly and concisely identify the services offered in the Proposal. • State that the Proposal will remain in effect for period of 120 calendar days after the
deadline for submission of Proposal. • Include the name, title, address, telephone number, and email address of one or more
individuals who can respond to requests for additional information. • Include the name, title, address, and telephone number of one or more individuals who
are authorized to sign a contract.
B. Executive Summary The Executive Summary should present a clear and concise summary of the MBCS Integrator's background, level of expertise, and direct relevant experience in relation to the MBCS Integrator’s understanding of the scope and requirements of the MBCS Integrator’s work for Massport on this MBCS Project. It should make a case as to why the MBCS Integrator is the best candidate for the job. Please structure the Executive Summary in a manner that allows it to serve as a stand-alone summary when separated from the other sections of the Proposal.
Master Building Control System - RFP
MPA L1227 Page 34 December 2013
C. Scope of Work Part I: MBCS, System Installation and Implementation
I-1. Understanding of the Project and Approach Provide a concise presentation of the MBCS Integrator’s understanding of issues facing Massport and the MBCS Integrator in implementing the scope of work defined in the RFP. Alert Massport to particular difficulties that may be faced in implementing the work, and management or operational decisions that will need to be made during the Contract. A well-thought-out discussion of the Integrator’s understanding of issues should provide: a. Team organization and project management issues. Include an organization chart
in Appendix 3 of the Proposal. b. Implementation Plan for the staged MBCS installation. c. Technical Proposal for MBCS. d. Logistical issues pertinent to implementation. e. Any other issues deemed pertinent by the MBCS Integrator.
I-2. Proposed Work Plan and Schedule
Present a description of the approach and the tasks that the MBCS Integrator will undertake in order to successfully complete the requested work and to address issues noted in Section I-1 above, and how these tasks will be organized and managed. Provide a proposed schedule by task. MBCS Integrators shall also provide a table showing the level of effort in an estimate of hours by labor category for each task in the proposed Work Plan.
I-3. Price Proposal – Products and Services Costs, and Proposed Total Price
Exhibit IV A - Pricing Summary and Exhibit IV B - Pricing Matrix summate the points to be integrated under this RFP and allow for all costs to be added by the MBCS Integrator. To be responsive to this RFP, proposing MBCS Integrator shall complete the Pricing Summary and Matrix in order to present price information on the hardware and software items required. Please follow the format in the matrix, and only modify it if you deem such modification to be more helpful to Massport in understanding the pricing of your Proposal. Any modifications made to the matrix format shall be accompanied by an explanation. A price for labor costs for the work proposed under Phase I of this Scope is requested. Massport requests that the method by which labor costs have been estimated be explained. Earlier in the Proposal, a Work Plan with a table showing labor estimates will have been presented by MBCS Integrators. As far as possible, Massport requests that labor costs be detailed by showing labor hours by labor category and labor rate for each of the tasks identified in that Work Plan. Identification of proposed staff members for each task in the Work Plan, and their labor category is also requested. Labor costs to be included to Exhibit IV B - Pricing Matrix. The price should also identify and detail the subcontractor costs – if any. Any other costs that will be incurred for completion shall also be estimated and identified, and a total proposed price for the acquisition, installation and implementation work defined for Phase I of this Scope of Work shall be identified.
Master Building Control System - RFP
MPA L1227 Page 35 December 2013
I-4. Proposed Project Team and Qualifications Identify the key personnel the MBCS Integrator plans to assign to the Project, their intended roles, and the experience and skills that make them appropriate for this Project. Also clearly identify who will be the lead person representing your firm in contract negotiations and the subsequent contract with Massport. Any changes in the project team during the selection process or the course of the Project must be approved by Massport's Project Manager. Include, in Appendix 2 of the proposal, brief resumes for each of the key personnel named above. Include in those resumes the specific relevant projects on which those individuals have worked or are presently working.
I-5. Specific Relevant Experience and References
The MBCS Integrator should describe relevant projects performed by the firm in the past ten (10) years. At a minimum, the MBCS Integrator should:
• Describe the most recent (last ten years) relevant experience of the firm and any
proposed sub-contractors. Clearly state the roles of any sub-contractors used by the MBCS Integrator's organization on each of the projects.
• For each of the relevant experience projects listed, include client names, titles, telephone numbers and the roles of the clients responsible for the contracts.
• Make available visits to client sites which demonstrate the proposed MBCS in operation with integration to legacy BAS, including: Automated Logic WebCTRL, Carrier CCN , Carrier i-Vu, Schneider Electric Continuum, Schneider StruxureWare, Schneider TAC and Siemens.
I-6. Responses to Particular Questions
The MBCS Integrator shall provide responses to the following questions about the proposed system:
a. State how many spare points are available and the expansion capability of any
gateway/router/server at each location.
b. Provide estimated throughput figures for Ethernet based systems, for phases I-A, I-B and II, and the basis for calculating them.
c. State the number of concurrent users that the provided system can support without any license or hardware upgrade, and also the maximum number of concurrent users the system can support via license and/or hardware upgrades.
I-7. Other Relevant Information (optional)
At the discretion of the MBCS Integrator, other additional and relevant information may be included in this section. This would include any exceptions taken to Attachment B - Draft Contract Provisions as provided in this RFP.
D. Scope of Work Part II: System Maintenance and Support
II-1. Understanding of Massport’s Maintenance and Support Needs In this section of the Proposal, identify and describe support issues that will need to be resolved that may have been raised by our description above of the levels of support and response desired by Massport.
II-2. Proposed Service Level Alternatives
Master Building Control System - RFP
MPA L1227 Page 36 December 2013
Identify any proposed service levels you wish Massport to consider in relation to our needs and costs Massport would incur for such support. The MBCS Integrator may include alternative plans of maintenance that may reduce the “on-site” requirement for technical staff while maintaining an acceptable service response.
II-3. Price Proposal for System Maintenance and Support
Include definition of the costs for MBCS maintenance levels proposed and your organization’s support price for the 3 years of maintenance and support described previously under Sections II-1 and II-2.
II-4. Maintenance Team Organization and Qualifications
Identify the key personnel the MBCS Integrator plans to assign to maintenance and support, their intended roles, and the experience and skills that make them appropriate for this Project. Clearly identify who will be the lead person representing your company for maintenance and support. Any changes in the project team during the selection process or the course of the Project must be approved by Massport's Project Manager. Include, in Appendix 2 of the Proposal, brief resumes for each of the key personnel. Include in those resumes the specific relevant projects on which those individuals have worked or are presently working.
II-5. Specific Relevant Maintenance and Support Experience and References
The Integrator should describe relevant maintenance and support efforts performed by the firm in the past five (5) years. At a minimum, the Integrator should:
• Describe the most recent (last five years) relevant experience of the company and
sub-Integrators. Clearly state the roles of any sub-Integrators used by the Integrator's organization on each of the projects.
• For each of the relevant experience projects listed, include client names, titles,
telephone numbers and the roles of the clients responsible for the contracts. II-6. Other Relevant Information (optional)
At the discretion of the MBCS Integrator, other additional and relevant information may be included in this section. This would include any exceptions taken to Attachment B - Draft Contract Provisions as provided in this RFP.
E. Proposal Appendices The MBCS Integrator's Appendices should be presented in the following order: Appendix 1. MBCS Integrator’s Information
• Company Introduction Present an introduction to your company that details its principal business(es), company size and structure, company ownership, etc. If a local office is proposing, describe the attributes of the local office. In particular, the MBCS Integrator should describe its company’s (local office's) system integration services, and how its professional background and expertise is most suited toward meeting Massport's needs.
• Project References Present an overview of prior project experience relevant to the scope and requirements of this MBCS Integration. Provide project examples and owner references.
Master Building Control System - RFP
MPA L1227 Page 37 December 2013
a. Attachment A: Appendix G – Information Technology Technical Environment Matrix
b. Attachment B: Exhibit D – Certificate of Compliance with Laws
Appendix 2. Resumes of MBCS Integrator's Key Personnel
• Present your company’s key personnel and potential alternates. Appendix 3. Organization Chart
• Present the structure, relationships and responsibilities of your team in an organization chart.
Appendix 4. Proposed Schedule
• Present the project approach in a master schedule. • Include all aspects of Scope of Work as defined in the RFP.
Appendix 5. Compliance Statements
• Provide a compliance statement regarding the MBCS Technical Specifications and MPA IT Specifications provided in Attachment A.
• Identify any exceptions of software or vendor’s ability to comply with the MBCS Technical Specifications and MPA IT Specifications provided in Attachment A.
Appendix 6. Cost Proposal
• Exhibit IV-A. • Exhibit IV-B
Changes to the RFP format or failure on the part of the MBCS Integrator to comply with all requirements may be cause for rejection of the Proposal.
EXHIBIT IV-A PRICING SCHEDULE Master Building Control System - RFP
NOTE: Contractor to fill these cells below
BAS LEGACY SYSTEM TYPE & TOTAL POINTS
# Building
Carrier C
CN
Carrier i‐Vu
ALC Web
CTRL
Schn
eide
r/ TA
C
Schn
eide
r/
StruxureWare
Siem
ens
Other
To be de
term
ined
(In
Design)
Total
PHASE IA8 Hanger (jetBlue) 449
9 Hanger (American) 449
11 State Police and TSA Bldg. 1434
20 Terminal C, Main Pier A 1280
20 Terminal C, Pier A CBIS 57
22 Terminal C, Main (included with Pier A)24 Terminal C, Pier D (included with Pier A)26 Air Traffic Control Tower 56
27 Terminal B, Pier A (American) 159
27 Terminal B, Various Fan Rooms 2737
53 Green Bus Depot (bus maintenance) 597
56 South Cargo Bldg. (Delta) 641
60 RCC Customer Service Center 1117
80 State Police K-9 Facility 53
Product Display Center 78
PHASE IB31 Terminal A, Main 3354
31 Terminal A, Satellite 3305
31 Terminal A, Satellite (CBIS) 57
Total I/O Points 6659 1280 6345 0 898 641 0 0 15823
Total I/O Points plus margin 7325 1408 6980 0 988 705 0 0 17405
Total Cost ($)Legacy Rate ($) / Point 0 0 0 #DIV/0! 0 0 #DIV/0! #DIV/0! 0
ReferencePlant Integrated # Points/Plant % margin 10
AHU Type A 38
AHU Type B 35
AHU Type C 34
Exhaust Fan Type 1 6
Exhaust Fan Type 2 8
Stair Pressurization 8
Destratification Fan 11
VAV Type 1 8
VAV Type 2 10
VAV Type 3 13
Fan Powered VAV Box 12
Fan Coil Unit 11
Duct Heating Coil 8
HW Unit Heater 8
Door Air Curtain 11
Infrared Heater 12
Finned Tube Heating 7
Gas Fired Unit Heater 7
Air Cooled Condenser Unit 9
Hot Water Heating 26
Domestic Hot Water 9
High temp HW Station 45
Chilled Water 17
Chilled Water Station 38
Monitoring 1
MPA L1227 Page 38 December 2013
EXHIBIT IV-B SUMMARY PRICING MATRIX Master Building Control System - RFP
SUMMARY PRICING MATRIX
Item TypeQuantity of I/O Points
Total Price Unit Price/Point (3) Engineer Grade 1 Engineer Grade 2
Hardware (1)
Software (2) 6980
Licenses
Hardware (1)
Software (2)7325
Licenses
Hardware (1)
Software (2)1408
Licenses
Hardware (1)
Software (2) 988
Licenses
Hardware (1)
Software (2) 705
Licenses
Workstations2
Laptops2
Training
O&Ms
3‐year maintenance
and support
Total
Notes1
2
3
4 Provide rates for additional grades if required
Labor Rates (4)
Provide quantities and prices for hardware including BACnet gateways, routers, panels etc. if required to facilitate
integration
Software includes integration and display on graphics of all Exhibit IV‐A points from legacy system to MBCS and all
specified functionality.
Unit price includes integration of future legacy systems to MBCS and all specified functionality.
INTERFACE TO ALC WebCTRL HARDWARE AND SOFTWARE POINTS
INTERFACE TO CARRIER CCN HARDWARE AND SOFTWARE POINTS
INTERFACE TO CARRIER i‐Vu HARDWARE AND SOFTWARE POINTS
INTERFACE TO SCHNEIDER STRUXUREWARE HARDWARE AND SOFTWARE POINTS
INTERFACE TO SIEMENS HARDWARE AND SOFTWARE POINTS
MASTER BUILDING CONTROL SYSTEM
Integrator Footnotes
MBCS Integrator: Insert Integrator footnotes text by footnote number here:
MPA L1227 Page 39 December 2013
Master Building Control System - RFP
MPA L1227 Page 40 December 2013
V. GENERAL PROPOSAL SUBMITTAL CONDITIONS A. Acceptance of the Proposal
It is the intent of Massport to award a contract on the basis of the responses to this RFP. However, Massport, at its sole discretion, reserves the right to accept or reject any or all proposals received in response to this request, to negotiate with any qualified source, or to cancel in part or in its entirety this RFP. Massport may request additional information from the proposers during the course of the selection process. Any proposal determined to be non-responsive to any of the requirements of this RFP may be disqualified without complete evaluation. The Selection Committee may, at its discretion, determine noncompliance is insubstantial and can be corrected or that an alternative proposed by the proposer is an acceptable substitute. In such cases, the Selection Committee may ask for clarifications and/or allow the proposer to make minor changes or corrections to its Proposal. Massport reserves the right to suspend, withdraw, amend, or supplement this RFP including all appendices, exhibits, and addenda, at any time prior to opening the proposals. Massport further reserves the right to accept any proposal, to modify or amend with the consent of the proposer any proposal prior to acceptance, to reject any or all proposals, to waive any informality and to effect any agreement otherwise, all as Massport in its sole judgment may deem to be in its best interest. By submitting a proposal in response to this RFP, the proposer agrees to accept award of the successfully negotiated contract to perform the work described in the submitted proposal. The selected company will be expected to sign an agreement substantially in the form provided in Attachment B - Draft Contract Provisions of this RFP document. If the proposer believes that modification of the RFP or any article contained in Massport's standard contract is necessary, or the proposer takes exception to any portion of this RFP, the proposer shall so indicate, in detail, at the time of proposal submission. Otherwise, it will be assumed that the terms of the contract and RFP are acceptable, and by submission of a signed proposal to Massport, the proposer will be deemed to have accepted in their entirety the terms and conditions of the contract and this RFP. Massport need not select the lowest cost proposal; rather, Massport will select the proposal that is deemed by Massport to be most responsive to its needs.
B. Conflict of Interest
Massport seeks to avoid any conflict of interest, or the appearance of a conflict of interest. Each proposer is advised that its performance of work for Massport may, at any time, raise questions about real or perceived conflicts of interest because of the proposer's relationship to other entities or individuals, including without limitation: (1) private and public owners of companies that may be affected by the Project, and/or (2) other state-created entities with potential conflicting interests and/or concerns. Accordingly, Massport reserves the right to: (1) disqualify any proposer or reject any proposal at any time solely on the grounds that a real or perceived legal or policy conflict of interest is present; (2) require any proposer to take any action or supply any information necessary to remove the conflict, including without limitation, obtaining an opinion from the State Ethics Commission; and (3) terminate any contract arising out of this solicitation if, in the opinion of Massport, any such relationship would constitute or have the potential to create a real or perceived conflict of interest that cannot be resolved to the satisfaction of Massport.
Master Building Control System - RFP
MPA L1227 Page 41 December 2013
In addition, representatives and/or employees of the successful proposer may be required to certify from time to time, in a form approved by Massport, that in connection with work under any contract arising from this RFP, that they are in full compliance with the provisions of Chapter 268A of Massachusetts General Laws and any other applicable conflict of interest laws. The proposer agrees to disclose in writing any facts Massport may seek in order to resolve questions about potential conflicts of interest occurring during the period of solicitation of performance hereunder and, upon request of Massport, describe on-going relationships between any party to the proposer's team and suppliers and manufacturers of equipment which may be deployed in the work of this project. Proposers are required, as part of the proposal to disclose performance of any work previously completed or ongoing with any member of Massport or Massport itself.
C. Proprietary Information, Non-Disclosure
Massport will seek to hold all RFP's and subsequent submissions in confidence, to the extent consistent with applicable law, until a final decision has been made or the selection process is terminated. Proposers are advised, however, that pursuant to M.G.L.c.66, all materials received by Massport which fall within the definition of "public record" as set forth in M.G.L.c.4.7, cl. (26), shall be disclosed by Massport upon request. Any information given to Massport in any proposer's proposal, or any correspondence, discussion, meeting, or other communications between the proposer and Massport before, with, or after the submission of the proposer's RFP, either orally or in writing, will not be, or deemed to have been, proprietary or confidential, although Massport will use reasonable efforts not to disclose such information to persons who are not employees of or consultants retained by Massport except as may be required by state and federal law. Use or disclosure of such information by Massport may be made without obligation or compensation and without liability of Massport of any kind whatsoever. The foregoing applies to any information, whether or not given at the invitation of Massport. Any statement which is inconsistent with the foregoing provisions of the paragraph whether made as part of, or in connection with, any information received from the Proponent or otherwise made at any time in any fashion, and whether made orally or in writing, shall be deemed null and void and of no force or effect. Massport's receipt or discussion of any information submitted in response to the RFP, including information submitted during discussions after said submittal (including ideas, drawings or other materials communicated or exhibited) does not, and will not impose any obligations whatsoever on Massport, or entitle Proponents to any compensation. Massport reserves the right to use any or all ideas or concepts presented in any proposal submitted in response to the RFP, whether accepted or not. Selection or rejection of the Proposal shall not affect this right.
D. Representations Made by Proposer
By submitting a proposal, a proposer represents that:
• Proposer has read and understands this RFP and proposer's response is made in agreement and compliance with the RFP.
• Except as expressly stated by proposer, all terms and conditions set forth herein are accepted and incorporated in the Proposal.
• Proposer possesses the capabilities, equipment, personnel and financial wherewithal to provide efficient and successful assistance.
• If selected, the RFP response may be incorporated into the final contractual agreement.
Master Building Control System - RFP
MPA L1227 Page 42 December 2013
• The proposer will enter into an agreement with Massport which will be substantially in the same form as Attachment B of this RFP. Any issues with the terms of this Draft Contract must be identified in the Proposal response in order to be included in subsequent contract negotiations.
E. Insurance
MBCS Integrator shall carry professional liability insurance coverage for errors, omissions and negligent acts in an amount of not less than $1,000,000. Such insurance shall extend to MBCS Integrator and to its legal representatives in the event of death, dissolution or bankruptcy, and shall cover the errors, omissions or negligent acts of MBCS Integrator's agents and employees. Such insurance shall extend to any act, error or omission in the performance of services under the subject contract committed by MBCS Integrator or alleged to have been committed by Integrator or any person for whom Integrator is responsible. MBCS Integrator shall also carry insurance furnishing benefits in accordance with Mass. G.L.c. 152 or such other worker's compensation requirements as may pertain. Integrator shall also carry general liability/automobile liability insurance coverage in an amount of not less than $1,000,000. MBCS Integrator's insurance coverage shall also cover restoration of plans, drawings, field notes or other documents in the event of loss or destruction in the custody of MBCS Integrator. On all liability policies, Massport must be named as Additional Insured.