march 2010 tb short visual resume
Post on 16-Apr-2017
658 Views
Preview:
TRANSCRIPT
+ health sciences projects
Visual Resume
Tony Burley BA(hons) Dip. Arch. (UCL), ARB, RIBA
March 2010
Visual Resume Highlights
Tony BurleyBA(hons) Dip. Arch. (UCL), ARB, RIBA
March 2010
+tbMarch 2010
Visual Resume Highlights
Tony BurleyBA(hons) Dip. Arch. (UCL), ARB, RIBA
March 2010
+ Sidra Medical and Research Centre
Doha, Qatar260,000sqm - $2.2Bn (exc equip)360 bed Academic Teaching HospitalCompletion 2013
+ Senior Medical Planner | KEO
+ Shaikh Khalifa HospitalHoms, Syria45,000sqm - $50.m (exc equip)260 bed General HospitalCompetition Entry
+ Project Director | Dyer
+ Life CentreNewcastle, UK3,000sqm - $60.m Genetics Institute Labs
+ Package Architect | Terry Farrell & Partners
+ St James’s Hospital
Leeds, UK60,000sqm - 160.m Oncology Centre
+ Package Architect Anshen Dyer
+ Great Ormond Street Hospital
London, UK60,000sqm - 160.m Octav Botnar Wing
+ Project Architect Anshen Dyer
+ Pembury HospitalTunbridge Wells, UK65,000sqm - 200.m 512 Bed General HospitalFITN PFI Bid
+ Associate & Project Manager RTKL ( London)
+ Fable RoomAs presented at Healthcare Design 07 Conference, Dallas USA
+ Tony Burley & Roger Ulrich
+tbMarch 2010
+ St James’s HospitalDublin, Ireland3,000sqm - 11.m Inpatient & Research Labs
+ AssociateRTKL ( London)
+ Poole HospitalPoole, UKDevelopment Control Plan& department relocations
+ AssociateRTKL ( London)
top related