“Radical Redesign saves Crossrail £50m on Whitechapel Station”
Presenter: Hugo Axel-Berg Manager of Engineering West Central Area Crossrail Ltd.
• Putting safety first on the agenda at every meeting
• Conducting weekly “toolbox talks” on a range of issues affecting designers in the office for all staff
• Encouraging all staff working on the project to have the appropriate CSCS accreditation
• Providing safety training for all staff covering CDM, workplace and site safety.
Safety in Design
90 km existing alignment 21 km new twin bore tunnels 8 new underground stations Extension/ renovation / improvements to 28 surface stations 24 trains / hr 200 million passengers per year
Crossrail...Currently Europe‘s largest civil engineering project
Changing Stations
Existing
Proposed
Whitechapel Station Interchange
Durward
Street Shaft
Cambridge
Heath Shaft Swanlea School
Kempton Court
Royal London
Hospital
Whitechapel
Sports Centre
Whitechapel Station
Sainsburys
The Whitechapel Vision |
Whitechapel Station Interchange
The Whitechapel Vision | Design Strategy
Whitechapel Station Interchange
Station Design | Station ‘Bridge’ Concept
Social Benefits
- Improved accessibility
- Intuitive wayfinding
- Inclusive design
Economic Benefits
- Invigorates High Street
- Optimises footfall
- Optimised Journey time
Environmental Benefits
- Reduced excavation
- Increased daylight levels
- Optimises natural ventilation
Whitechapel Station Interchange
Station Design | Passenger Flow Analysis
Passenger Flow Analysis
- Improved wayfinding
- Improved accessibility
- More daylight
- Less turns
- Shorter journey times
Whitechapel Station Interchange
Station Design | Design and Character
The Entrance
Whitechapel Station Interchange
Station Design | Lower Concourse
Whitechapel Station Interchange
Durward Street Shaft
Whitechapel Station Interchange
Station Concourse
Whitechapel Station Interchange
Station Design | Lower Concourse
Whitechapel Station Interchange
Station Design | Platforms
Whitechapel Station Interchange
2011 2012 2013 2014
SCL Starts
D-wall starts
Pilot Tunnels
complete
Platform Tunnels
complete
D-wall excavated
LCW2 VA5 EP1
LCE CP1a
TBMs Launched
Westwards
Geotechnical Monitoring
Whitechapel Station Interchange
Strengthening measures
School
• Strengthening foundations – piles – prior to tunnelling
Sport Hall
• Repair after construction
Residential Block
• Ground improvement, grout injection – prior to tunnelling
Whitechapel Station Interchange
Whitechapel Station Interchange
The design changes we made:
• Change to north-south alignment from east-west
• New concourse design
• Demolition of Winthrop St and Durward St Bridges
• Removed Fulbourne St ticket office
• New internal configuration of Durward St Shaft
• Inclusion of new public walkway
• GSM refurbished, not demolished
• Reduction in excavation
• Sustainable design features, e.g. green roof and wall.
In summary…
Whitechapel Station Interchange
How was it done?
• Thinking laterally • Embracing change • Listening to and understanding the needs of the client • Delivering for the client • Working collaboratively with all teams on the project
Whitechapel Station Interchange
Questions