location plan - epd.gov.hk
Post on 24-Dec-2021
3 Views
Preview:
TRANSCRIPT
Project Title: Harbour Area Treatment Scheme (HATS) Stage 2A工程名稱工程名稱工程名稱工程名稱:::: 淨化海港計劃淨化海港計劃淨化海港計劃淨化海港計劃 – 第二期甲第二期甲第二期甲第二期甲
Figure 1d:::: Location Plan圖圖圖圖 1d:::: 位置圖位置圖位置圖位置圖
Environmental Permit No.: EP-322/2008/A環境許可證編號:EP-322/2008/A
LOCATION PLAN1:4 000 000
PTW BOUNDARY
WORKS AREA
SHAFT LOCATION
TUNNEL ALIGNMENT
DROP SHAFT
CYBERPORT PTW
SITE PORTION Abd -(TEMPORARY REQUIREMENT)- AREA ~ 1520m2
- WORKS AREA
PRODUCTION SHAFTDROP / RISER SHAFT
PRODUCTION SHAFT
SITE PORTION Abd -(TEMPORARY REQUIREMENT)- AREA ~ 4140m2
- PRODUCTION SHAFT AND WORKS SITE (WITHSURFACE EXCAVATION WORKS)
LOCATION PLAN1:4 000 000
PTW BOUNDARY
WORKS AREA
SHAFT LOCATION
TUNNEL ALIGNMENT
SITE PORTION CP –(TEMPORARY REQUIREMENT)- SHAFT CONSTRUCTION- AREA ~ 2300m2
- WORKS AREA
WAH FU PTW
DROP SHAFT
LOCATION PLAN1:4 000 000
PTW BOUNDARY
WORKS AREA
SHAFT LOCATION
TUNNEL ALIGNMENT
ABERDEEN PTW
AP LEI CHAU PTW
DROP SHAFT
SITE PORTION ALC -(TEMPORARY REQUIREMENT)- AREA ~ 1400m2
- WORKS AREA
LOCATION PLAN1:4 000 000
PTW BOUNDARY
WORKS AREA
SHAFT LOCATION
TUNNEL ALIGNMENT
top related