This second floor remodel transformed a 1960's antiquated floor plan into the 21st century. We gutted and enlarged the master bathroom and the hall bath; enlarged the master closet and added a second master walk-in closet off the bathroom. The master bedroom and hall carpet was replaced with hardwood floors and the remaining 3 bedrooms were carpeted, painted, had new light fixtures installed and all the doors and millwork was refurbished bringing this newly renovated gem into the 21st century!.

TRANSCRIPT

LJT DESIGNS

2010

Second Floor Remodel

Master bedroom: Before:

THE master Bathroom was enlarged by taking 34” from the back wall of the

master bedroom which included the window below thereby providing natural

light in the bath.

After...

we removed wallpaper, painted walls, installed hardwood floors

and added New bedroom furniture

before... Master bedroom Closet on left was Expanded by taking 2 feet from bedroom #3

which allowed for additional hanging space. The sliding door was

replaced with a new hinged door and shelves added for audio/tv equipment.

Before...

After...

Installed new closet system and

shelving for audio equipment and

shoes

After... Same tv wall

During... Left photo shows shelving for shoes and

equipment; right photo shows openings for equipment which

was covered by a door which matched the walls

During... Master bathroom: retrofitted new dresser as vanity

During...

installed above counter

sinks, wall mounted faucets

and sconces on mirror

which is bordered in mosaic

tiles.

During... On left: converted former bathtub/toilet area

to second walk-in closet and shower

After...

Recessed lights were

installed.

Toilet and plumbing was

relocated to immediate

right in photo next to half

wall

During and after...

Converted toilet room with tub into shower and additional walk-in closet

During... Left photo: Shower Floor. Right photo: shower

walls with intricate Mosaic and tile set at a 45 degree angle

After... shower on left and mirrored Closet door on right

During and after...

Relocated toilet next to half wall and entrance to

bath

During... created a tile ‘rug’

During... Another shot of the tile rug from opposite direction

After...

Before...

Second floor hall bath

completely gutted

after...

new vanity, mirror, toilet,

wall sconces plus

recessed cans were

installed in the ceiling

After... New floor on left – new tub and tile using a

honed/dull finished 12 x 12 tile bordered by a polished mosaic

After... Bedroom #2 pictured. all second floor bedrooms were updated with

carpet, paint, new light fixtures, and the doors and woodwork were refinished.