LHC Sync. Light Monitors Status and Plans
05 Feb 2014Emittance Meeting (~= BI-TB Jan 2014)
F.RoncaroloA.Goldblatt, G.Trad, E.Bravin, S.Mazzoni, W.Andreazza,
G.Shneider,M.Wendt, N.Chritin
2Federico Roncarolo
Overview
• BSRTM Design– Option A: original design with ceramic pieces– Option B (BASELINE): Longer mirror, support behind RF screen, all metal
• Optics– Low wavelength optics– Interferometer (B1 only)
• New calibration line (B1 only)• Change tank support from ‘chair’ to 3 pillars (B1 only?)• New light shielding
• SW– New functionalities to cope with new optics layout– Filter wheels pneumatic IN-OUT– Interferometer– Possible request of tomography meas. (ABP) fastest and synchronized
camera acquisition• Discussion on Digital Cameras
3Federico Roncarolo
New Calibration Line BSRTR B1
4Federico Roncarolo
New Calibration Line BSRTR B1
ECR circulatingSystem (BSRTR = BTVSI modified) in productionexpected delivery: MarchScheduled installation: March
Components outside vacuum to be ordered, not critical, will be installed fall 2014
5Federico Roncarolo
BSRTM Option A (ceramic)
• 2 systems in fabrication• Expected delivery• Keep as backup solution
Mirror holder components (except springs)
made in ceramic
6Federico Roncarolo
BSRTM Option B
• BASELINE Option• ECR submitted• 2 systems in fabrication• Expected Delivery: February• Schedule
– RF tests in the LAB?– To TE-VSC for testing: 15 March– Installation: April ?
For both option A and B, see BI-TB Oct 2013 for details on RF studies
7Federico Roncarolo
Tank Support
• Decision: change B1 support from ‘chair’ to 3 pillars (existing) to free space on optical table
Proposal: change B2 immediately, to free space for halo monitor
8Federico Roncarolo
Optics Layout
9Federico Roncarolo
New mirrors
• 2 mirrors compatible with option B, coating visible : arrived, backup solution
• 3 mirrors with coating in the UV (down to 230nm) for option A + 3 for Option B– Expected delivery end of February– Can be the bottleneck for scheduling
10Federico Roncarolo
New Light Shielding
11Federico Roncarolo
Digital Cameras
12Federico Roncarolo
Summary
13Federico Roncarolo
14Federico Roncarolo
https://espace.cern.ch/be-dep-bi-tb/Lists/Calendar/Attachments/840/LHC%20PROPOSAL.pptx
https://dfs.cern.ch/dfs//Departments/AB/Groups/BI/Sections/PM/Projects/LHC/BSR/Docs-Litterature-Publications/BSRTWG/2013-09-10/BSRT_WakefieldAnalysis.pptx
RF Simu (M.Wendt)
top related