letter from penndot secretary regarding route 11/15 rock slope closure in 2016

Post on 12-Jan-2016

6.017 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

PennDOT Seceretary Leslie Richards responds to concerns expressed by state Sen. Rob Teplitz regarding the planned closure of Route 11/15 in summer of 2016 for rock slope work.

TRANSCRIPT

top related