LEAN in BIMBenjamin Crosby

BIM success! – Sort of ?

Software

Jump In.

Or Think it through first.

Installation

Sched. L5

Author -Shop. /

Fab. Design

Author –

Detailed Eng. /

Const Docs

Schematic

Design

Marketing

Prefabrication

Modularization

Detailed

Estimating

Sched

6D Owner Information

Phase (COBie)

3D Coordination Phase

(Clash Detection)

5D and 4D

(Quantities and

Sched)

Schematic

Estimating/

Sched.

Installation

Sched. L5

Author -Shop. /

Fab. Design

Author –

Detailed Eng. /

Const Docs

Schematic

Design

Marketing

Prefabrication

Modularization

Detailed

Estimating

Sched

6D Owner Information

Phase (COBie)

3D Coordination Phase

(Clash Detection)

5D and 4D

(Quantities and

Sched)

Schematic

Estimating/

Sched.

Destini

GT

STRUDL

SketchUp

3DsMax

DProfiler SketchUp

ArchiCAD

Revit

Primavera 6 Timberline

MC2

Vico

SynchroTekla CM

Assemble

Navisworks

or 360 Glue

BIMSight Viewpoint for Projects

Navigator

Projectwise

AECOSim

Solibri

Tekla

ArchiCAD

Revit

Other

SDS2

CADMech

SDS2

Tekla

File Exchange

/CollaborationBIM 360

Field

CNC

Mach.

Plasma

Cutter

VicoAssemble

BIM 360

Field

Civil

3DCivil

3D

BlueBeam

Project

Synchro

WebEx

Autodesk

Point

Layout

DES

CADPipe

CADDuct

East Coast

CAD

Designer 3D

DProfiler

Consensus

Docs

Cost

OS

3D

DWG

CAD

Works

STAAD

Solibri

DOE-2

Energy

Plus

CAD

Works

NewFormaProcore

VFC

Lumion

3D

HCSS

Business

Center

PlanGrid

iConstruct

VP

Command

VP

Command

SysQue

Revit

Revizto

YouBIMBusiness

Center

Oculus /

Vive

360 Docs

BIM to

Field

Unity /

Unreal

Cost

OS

General Items

Let Me Explain!

Or Stuff We need to Address.

Where do models come from?

Background – what is LOD?

http://bimforum.org/lod/

Installation

Sched. L5

Author -Shop. /

Fab. Design

Author –

Detailed Eng. /

Const Docs

Schematic

Design

Marketing

Prefabrication

Modularization

Detailed

Estimating

Sched

6D Owner Information

Phase (COBie)

3D Coordination Phase

(Clash Detection)

5D and 4D

(Quantities and

Sched)

Schematic

Estimating/

Sched.

Design-Bid-BuildPre-Design Phase

Schematic Phase

Design Development

ConstructionDocuments

Bid Phase

Construction Phase

Ops Phase

Shop Drawing and Fabrication

Models

Steel Fab Model

Ductwork Model

Mechanical Pipe Model

Plumbing Model

Electrical Model

Fire Protection Model

Other Models

SD ARC Design Model

SD STR Design Model

SD MEP-FP Design Model

DD ARC Design Model

DD STR Design Model

DD MEP-FP Design Model

CD ARC Design Model

CD STR Design Model

CD MEP-FP Design Model

Design Models

Preliminary Design Model

Conceptual Estimating

Model

Energy Analysis Model

Preliminary Design Models

Facility Managemen

t Model

Design AssistPre-Design Phase

Schematic Phase Design Development

ConstructionDocuments

Bid Phase

Construction Phase

Ops Phase

Shop Drawing and Fabrication Models

Steel Fab Model

Ductwork Model

Mechanical Pipe Model

Plumbing Model

Electrical Model

Fire Protection Model

Other Models

SD ARC Design Model

SD STR Design Model

SD MEP-FP Design Model

DD ARC Design Model

DD STR Design Model

DD MEP-FP Design Model

CD ARC Design Model

CD STR Design Model

CD MEP-FP Design Model

Design Models

Preliminary Design Model

Conceptual Estimating

Model

Energy Analysis Model

Preliminary Design Models

Pre-Construction Planning Model

Facility Management

Model

Design-BuildPre-Design Phase

Schematic Phase

Design Development

ConstructionDocuments

Bid Phase

Construction Phase

Ops Phase

Pre-Construction Planning Model

Shop Drawing and Fabrication Models

Steel Fab Model

Ductwork Model

Mechanical Pipe Model

Plumbing Model

Electrical Model

Fire Protection Model

Other Models

ARC Design Model

STR Design Model

Design Models

Facility Management

Model

Conceptual Estimating

Model

Energy Analysis Model

Preliminary Design Models(Critical Design

Models)

BIM Makers!

Models for nothing and the clicks for free?

Or Determine how BIM, when done right, doesn't cost anything.

Model Used to create

Drawings??

Model Used to design –

with Drawings as a

reporting function!!

Process Paradigm

Schematic

Drawings No

Model

Model

Model Coord.

Drawings

Construction

LOD 100

LOD 200-300

This work flow costs more, takes longer, and fails.

Process Paradigm

Schematic

Drawings Via

Model

Model

Model Coord.

Drawings

Construction

LOD 100

LOD 200-300

This work flow is hard and takes longer, but can work.

Process Paradigm

Schematic

Drawings

Design Model

s

Model Coord.

Construction

LOD 200-300LOD 100

This work flow costs less, is faster, and reduces risk.

Process Paradigm

Design Docs

Shop Drawings

Model Creation

Model Coord.

Fabrication

Construction

LOD 200-300

LOD 300-400

Process Paradigm

This work flow costs more, takes longer, and fails.

Design Docs

Shop Drawing

s

Shop Model

Model Coord.

Fabrication

Construction

LOD 350-400*LOD 200-300

This work flow costs less, is faster, and reduces risk.

*LOD 400 - Enables Automated Fabrication and Prefabrication(CNC, 3D Printing, Robotic Total Station Layout, Warehouse Fab, etc..)

Process Paradigm

BIM Makers!

Show Me the Money!!

Or Explore the financial benefits of BIM

and how to tap into them.

BIM costs less when it is Virtual Design & Construction.

Savings FromVDC/BIM

Document CreationReduced Field Changes

Scope Creation

Reduced Time and Risk

Models UsedReduced Duration

Reduced Time and Risk

Reduced Labor and Rework

Reduced Labor

Reduced Labor

Document Creation

Practice!

Third Time’s the Charm.

Or It takes Planning and Practice.

Let’s Get VDC Started

1.Decide what you want to do.

Let’s Get VDC Started

1.Decide what you want to do.2.Have a written plan to get started.

a. Update the plan regularly.

Let’s Get VDC Started

1.Decide what you want to do.2.Have a written plan to get started.

a. Update the plan regularly.3.Communicate with partners.

Let’s Get VDC Started1.Decide what you want to do.2.Have a written plan to get started.

a. Update the plan regularly.3.Communicate with partners.4.Use the right processes.

Let’s Get VDC Started

1.Decide what you want to do.2.Have a written plan to get started.

a. Update the plan regularly.3.Communicate with partners.4.Use the right processes.5.Use the models.

Examples!

Off to the Races.

Or What it might look like.

BIM costs less when it is Virtual Design & Construction.

Results FromVDC/BIM

VDC Results

Let’s Get VDC Started

Let’s Get VDC Started

VDC Results

BIM success! – YES!!