lc - 358lc#!!358" !!!! position" senior’project’manager" location"townsville...
Post on 12-Jul-2020
1 Views
Preview:
TRANSCRIPT
LC -‐ 358
www.linkedindustries.com.au
Position
Senior Project Manager
Location Townsville, QLD
Personal Summary
Ambitious Project Manager, with a can do attitude who has structured my career in line with PMBOK principals, coupled with substantial experience of working to the highest standards in project delivery. I have a long track record of ensuring projects are delivered to the highest quality and safety, within budget by effectively organizing, managing and utilizing all resources. I am able to develop and lead teams in Civil Construction, Infrastructure, petrochemical, Solar utility and Building projects where the highest standards are routinely demanded. Always actively involved in all aspects of the project life cycle I can deliver high value projects in matrixed organizations and across different geographies.
I have extensive remote construction experience throughout Australia, with considerable hands on experience at project sites.
Qualifications and Memberships
Certificate 4 in Workplace Training and Assessment ASIC Aviation Card Holder (Australia Wide)
Diploma of Project Management Construction Industry White Card
Australian Private Pilot License JP (Qual) Queensland
HR Driving License Australian Women Pilots Association
Australian Institute Project Management (MAIPM) National Association of Women in Construction Australia
Key Skills and Computer Programs • Microsoft Project – Advanced • Primavera Suretrack –Intermediate. • Auto-‐cadd and Microstation, drafting packages -‐ Basic • Databuild and Toolbox Estimating packages – Advnaced. • Microsoft Word and Excel -‐ Advanced • Access and Power Point -‐Basic • Practical accounting and purchasing system -‐ Intermediate • MYOB and E-‐ Commerce -‐ Intermediate • Reflect – Intermediate • JDE Accounting and project reporting package • Infoexpert – Basic
www.linkedindustries.com.au
LC – 358
Industry Experience
Job Title Project Manager (Contract) Dates February 2019 to January 2020
Company
Key Responsibilities: • Run multiple packages for pre mobilisation of the contract works • Packages included tendering, negotiating and operating the package to successful completion of that scope of
works • Managing supervisors, safety and environmental site staff to deliver works on the ground • Key interface with design packages for project delivery, dealing directly with local councils on infrastructure
agreements and state government on extensive project delivery requirements • Packages being maintained, Geotechnical for entire length of corridor, access roads and junction upgrades, camp
construction, camp catering contractor, cadastral survey, 20km of road upgrade including Geotech, design and delivery on ground
Job Title Project Manager (Contract) Dates May 2018 to April 2019 Company Ertech NSW/ACT
Key Responsibilities: • Daily oversee supervisors, engineers, administrators and workforce, ensuring works are undertaken in
accordance with plans, specifications, and program • Prepare and negotiate a variety of contractual claims relating to the project including in depth delay and
prolongation claims relating to the project • Review and approve subcontractor claims and prepare and submit progress claims for payment, plus prepare and
submit variation claims and extension of time claims • Develop and update program schedules for works indicating sequence of activities including detailed resourcing • Provide technical/design support for construction works, consult with stakeholders in relation to construction
works, contracts and specifications • Manage works within budget in an effective and efficient manner, prepare reports and answer correspondence
and track project costs and report against estimate • Ensure quality, safety and environmental standards are implemented, monitored and controlled
www.linkedindustries.com.au
LC – 358
Job Title Project Manager (Contract) Dates November 2017 March 2018
Company Assigned to Ostwald Bros (in liquidation) and Price Waterhouse Cooper
Key Responsibilities: • Negotiate, broker and successfully delivery a triparty deal between TMR, PWC and Ostwald for the completion of
the works to the satisfactory of all parties • Daily oversee supervisors, engineers, administrators and workforce, ensuring works are undertaken in
accordance with plans, specifications, and program • Review and approve subcontractor claims and prepare and submit progress claims for payment, plus prepare and
submit variation claims and extension of time claims • Consult with all stakeholders in relation to construction works, contracts and specifications • Meet with the client on a regular basis to demonstrate the delivery and completion of the project as per the
strict quality expectations • Develop and update program schedules for works indicating sequence of activities including detailed resourcing • Provide technical/design support for construction works, consult with stakeholders in relation to construction
works, contracts and specifications • Manage works within budget in an effective and efficient manner, prepare reports and answer correspondence
and track project costs and report against estimate • Ensure quality, safety and environmental standards are implemented, monitored and controlled
Job Title Senior Project Manager (Contract)
Dates April 2017 to October 2017
Company Haslin Constructions
Key Responsibilities: • Project manage, monitor and report on the performance of the construction of 3 solar power stations Dubbo,
Narromine and Griffith piling and mechanical installations • Oversee site managers, engineers, site supervisors and workforce, ensure works are undertaken in accordance
with plans, specifications, and program • Work in a team environment to provide guidance and expert assistance to staff regarding works • Review and approve subcontractor claims and prepare and submit progress claims for payment, plus prepare and
submit variation claims and extension of time claims • Develop and update program schedules for works indicating sequence of activities including detailed resourcing • Provide technical/design support for construction works, consult with stakeholders in relation to construction
works, contracts and specifications • Manage works within budget in an effective and efficient manner, prepare reports and answer correspondence
and track project costs and report against estimate • Ensure quality, safety and environmental standards are implemented, monitored and controlled • Successfully delivered 3 solar farms on time and within budget
www.linkedindustries.com.au
LC – 358
Job Title Project Manager Major Projects Superintendents Representative (Contract Role)
Dates November 2016 to April 2107
Company Hornsby Shire Council
Key Responsibilities: • To plan and manage the design of major projects, call tenders, manage consultants and contractors (as
Superintendents Representative) and approve payments Monitor and report on the performance of consultants, contractors and progress of works
• Supervise works undertaken by contractors, ensure works are undertaken in accordance with plans, specifications, and program
• Work in a team environment to provide guidance and expert assistance to staff regarding works • Review and approve contractor and consultant payments, variation claims and extension of time claims • Develop and update program schedules for works indicating sequence of activities • Provide technical/design support for construction works, consult with stakeholders in relation to construction
works, contracts and specifications • Manage works within budget in an effective and efficient manner, prepare reports and answer correspondence
and track project costs and report against estimate • Track all expenditures and report against budget, monitor and report on consultant and contractor performance • Report on the necessity to deviate from designs/specifications report on project progress and update program • Ensure quality standards are implemented, monitored and controlled
Job Title Operations Manager (Temp/ Contract Role)
Dates August 2016 to November 2016
Company Bulloo Shire Council QLD
Key Responsibilities: • Delivery Councils civil works schedule and associated roads programs ensuring all activities in the Operations
department are carried out in a technically sound manner and are managed within identified timelines, budgetary provisions and legislative guidelines
• Ensure the TMR (TIDS, RMPC and WRUP) program is delivered efficiently and effectively and in accordance with contract and meets TMR requirements
• Respond and submit NDRRA applications when relevant including active management and reporting • Ensure councils roads are managed in accordance with Councils Asset Management Plans Finalise 10 year road
strategy, develop and deliver forward works schedule, deliver R2R program, deliver LG road network maintenance and Maintain all relevant asset data
• Contribute towards the development and input of strategies and actions as part of Councils Corporate plan and Operational Plan
• Develop and present Departmental Budgets to the Chief Executive Officer for approval including monthly reporting in relation to progress against annual budget
• Monthly reporting to Council through to the Chief Executive Officer about the progress of all Departmental Programs and plans
• Manage and support staff according to approved HR policies and procedures, set clear performance standards, deliver constructive feedback and manage all performance according to the Council’s Performance Management System
• Foster a positive culture within Council which attracts and retains skilled enthusiastic staff empowered through continuous learning and committed to quality service delivery in accordance with Council standards
• Actively manage and promote Councils operational WHS requirements and ensure compliance by all staff, and contractors (workers) in line with legislative and corporate policy requirements
www.linkedindustries.com.au
LC – 358
Job Title Project Management Consultant
Dates March 2016 to July 2016 Company Kyogle Council NSW
Key Responsibilities: • Working with the council to complete a major infrastructure project in Kyogle • Preparing and submitting novation deeds to subcontractors and suppliers • providing technical support for the construction of a river break out channel • construction to roads with spray and asphalt sealing and HV electrical installation
Job Title Project Manager Dates November 2014 to February 2016
Company Civil Team Engineering
Key Responsibilities: • Ensure projects are managed within budget within applicable laws, company procedures, specifications and
contractual obligations including GC21 contracts and complying to RMS specifications • Ensure projects are completed to the client’s satisfaction • Manage Construction Programme • Provide supervision, guidance and mentoring to the project team • Ensure project teams operate cohesively and efficiently • Took control of a project which was failing, restructured and reorganized the project to deliver the project 1
month ahead of practical completion to the client • Building of a project team which consistently delivered above expectations of service to the client throughout the
life of the project
Job Title Senior Project Manager (Contract Role)
Dates May 2011 to August 2014
Company QCC
Key Responsibilities: • Project management aspects of the business, including business development • Developing and maintaining existing and new client relationships • Project planning, contracts administration and OHSE delivery • Subcontractor and supplier management and negotiations for projects at all levels • Running multiple disciplined site crews, supervisors and office support • Taking control of the full project life cycle from tender to handover for multiple projects
www.linkedindustries.com.au
LC – 358
Further Experience
Gumula Enterprises – Senior Project Manager (Contract Role) -‐ 2011 (4 Months)
Responsibilities:
• Worked on a Gumla project at Rio Tinto mine site at Paraburdoo Security Compound Upgrade works for the explosive’s storage magazine
• Managed bulk earthworks, road works, stormwater drainage, • Subcontractor management for the electrical and fencing • Actively the managed training and development of a multicultural site crew • Client liaison to Rio Tinto, Contractual and project reporting
PCE Australia – Senior Project Manager (Contract Role) -‐ 2010 (4 Months)
Responsibilities:
• Worked for PCE on the Groote Eylandt (BHPB GEMCO) project for the completion and demobilisation phase of a bulk earthworks rehandle project on the island the works included large scale cut to fill of spoil, overburden and rehandle, movement of topsoil for rehabilitation of mined areas
• Running Three production crews and a workshop crew running 24/7 shifts • Client liaison ensuring total compliance and delivery to BHPB requirements for all the onsite safety, quality and
environmental aspects of the project • Delivering contracts administration, progress tracking and claiming, programming works and demobilisation
logistics from the island
Marsh Civil – Project Manager (Contract Role) -‐ 2010 (5 Months)
Responsibility:
• Running the full life cycle of multiple subdivision projects including bulk earthworks, sewer and stormwater installation, utilities installation, road construction and retaining walls
• Responsible for budgeting, monthly reporting, client liaison, contracts administration and programming works, crews
QCC – Project Manager (Contract Role) -‐ 2010 (3 Months)
Responsibility:
• Work at Caltex Mackay for the construction of a new 28ml litre Diesel tank • Works included bulk earthworks, construction of concrete ring beam and associated structures, installation of
HDPE and clay liners, controlled sand fill, road base and Asphalt installation
S&N Civils -‐ Project Manager (Contract Role) -‐ 2008 to 2009
Responsibility:
• Manage BHPB client interface • large multi skilled construction crew All contractual and commercial issues including correspondence, progress
claims, contractual claims, variation claims, subcontractors and suppliers • Compliance and delivery to BHPB requirements of all onsite safety, quality and environmental aspects for the
project • Successfully completed the project BHP at Nelson point on time • Worked with the GM to develop and implement a Companywide integrated management system
www.linkedindustries.com.au
LC – 358
VDM Group (Wylie & Skene) -‐ Project Manager -‐ 2007 to 2008
Responsibility:
• Developing and maintaining client relationships • Project planning, cost control, contracts administration, subcontractor management and negotiations for projects
at various levels • Running large multiple disciplined and culturally diverse work crews, supervisors and office support teams • Recovered the FMG schedule which was behind when I took over to deliver the project on time and with only 7
punch list items
Piling Contractors -‐ Project Manager (Contract Role) -‐ 2006 to 2007
Responsibility:
• Project manager for Sub Alliance • Maintaining, managing and developing client relationships • Project planning, cost control, senior contracts administration, supplier management and negotiations for
projects at various levels and running multiple piling crews • Successful managed the Subcontract Alliance producing both quality result and profit, working both night and
day shifts in the centre of Brisbane • Challenging installation of bored piles in the Brisbane river including complex false work to support a piling rig • Completed multiple rail projects, safely, on time and budget
Civmec -‐ Project Manager -‐ 2005 to 2006
Responsibility:
• Developing and maintaining client and stake holder relationships • Project planning, development and delivery, contracts administration, subcontractor management • Running large multiple disciplined diverse work crews and supervisors • Completed projects on time and budget with no safety issues Organised and delivered a complex works program
and interface as to keep the mines maintenance operations running smoothly while the extension works were carried out
top related