Large Data Centers
Small & Medium Data Centers
Computer Rooms & Closets
Network-Critical Physical Infrastructure
Presented by
Ian P. de la RosaEnterprise District Manager
APC Philippines
© 2003 APC corporation.
Agenda
About APC
Network-Critical Physical Infrastructure investment and their Imperatives
Maximizing the performance of your investment• Availability
• Agility
• TCO
Next Step
© 2003 APC corporation.
CIO Priorities: Top Initiatives
Question: Which of the following technology initiatives are important to your organization ….
Top 2 Box Scores (Critically or Very Important)Totals (000)
Co size <99
Co size 100-999
Co size 1,000+
Improve business continuity (e.g. restore/recover, downtime prevention) 23,129 41% 49% 52%
Integrate applications to improve efficiency and customer service 22,923 38% 53% 53%
Improve security of data or network access 22,427 36% 51% 54%
Update aging systems such as hardware, equipment or software 20,594 35% 48% 46%
Improve network bandwidth or reduce network bottlenecks 12,016 18% 28% 30%
Improve storage infrastructure 11,156 18% 26% 26%
E-business improvement initiatives 8,619 14% 16% 22%
Increase wireless access 8,513 14% 21% 19%
Source: Survey by Ziff Davis Media
# 1: Business Continuity &
Downtime Prevention / Increased
Availability
© 2003 APC corporation.
Is Your Company experiencing these trends?
Rapid changes in IT technology
Regulatory requirements
Increasing availability expectations
High operating/service costs
High density
Server consolidation
In response, APC is changing the way the world designs, installs, operates, manages and maintains Network-Critical Physical Infrastructure (NCPI). What is NCPI?
© 2003 APC corporation.
What is Network Critical Physical Infrastructure (NCPI)?
The facility, physical support, power, and cooling for Information Technology
NCPI consists of:
Power (UPS, Power Distribution)
Air (Air Conditioners, Air Distribution)
Rack (Enclosures, Cable Mgmt, etc.)
Management (common platform)
Services (professional & break/fix)Data Centres or “IT Rooms” could be as small as an oversized closet or as large as a 100,000 square foot facility!
© 2003 APC corporation.
Essential foundation of
reliability
Network-Critical Physical Infrastructure (NCPI)
© 2003 APC corporation.
• Lifecycle Costs• Adaptability/Modularity/Scalability• Availability/Redundancy• Manageability• Serviceability
NCPI Challenges
© 2003 APC corporation.
1. Optimize capital investment and available space
2. Accelerate Speed of deployment
3. Lower the cost of Service contracts
Lifecycle Cost / Economics
Challenges…
© 2003 APC corporation.
Average Utilization of NCPI
•Forecasted capacity does not equal actual demand• Over sizing results in lost capital & operating $$
•Data centers are everbuilt to the most optimistic future needs that may ever be realized
© 2003 APC corporation.
4. Plan for a Power Density that is increasing and
unpredictable
5. Adapt to ever changing environments
6. Vendor Neutral Mounting
Adaptability/Modularity/Scalability
Challenges…
© 2003 APC corporation.
Heat Density Trends
Source: The Uptime Institute - Reprinted with permission from a White Paper titled “Heat Density Trends in Data Processing, Computer Systems, and Telecommunications Equipment” v1.0
© 2003 APC corporation.
7. Minimize Human Error
8. Minimize points of failure between NCPI
and the critical load
9. Reduce failure points that drop customers
simultaneously
10. Eliminate Hot Spots
Availability
Challenges…
© 2003 APC corporation.
Case Study of Downtime Failures
Root Causes
0%
5%
10%
15%
20%
25%
30%
35%
EquipmentFailure
Human Error ConstructionRelated
DesignRelated
ExternalCauses
Consistent with Surveys which attribute 60% or more of failures to Human Error
© 2003 APC corporation.
11. Monitor Attributes at the Rack level
12. Provide predictive failure analysis
Manageability
Challenges…
© 2003 APC corporation.
13. Decrease mean time to recovery
14. Simplify the complexity of the system
Serviceability
Challenges…
© 2003 APC corporation.
Frequent IT changes create chaos resulting in human error
They were not planned at all
These systems were not planned to look like this
© 2003 APC corporation.
The Business Value Equation for Network-Critical Physical Infrastructure
Availability Agility
TCOValue
x=
To Achieve Higher Business Continuity…
© 2003 APC corporation.
Availability Agility
TCOValue
x=
Equipment Reliability
Mean-Time-To-Recover
Human Error
© 2003 APC corporation.
Standardization enables improved availability
Modularize
Pre-test systems in the factory
Hot swappable
Pre-Integrate Power-Cooling-Rack Management & diagnostics
One-Time Engineering
Unique training requirements
On-site assembly
On-site testing
Custom programming
Standardize To Eliminate
Standardization accelerates learning at all levels, reducing human error and increasing availability
© 2003 APC corporation.
Availability
TCOValue
x=
Speed of Deployment
Ability to Scale
Ability to Reconfigure
Agility
The inherent ability to scale due to our modular approach to NCPI allows rightsizing, lower upfront cost and react to changing business requirements..
© 2003 APC corporation.
Traditional Approach (3-6 Mo.)
Design Concept
Construction Design
Construction
Commissioning
Operation
Custom Parts, Applications and Services
“I need more capacity.”
“I have more capacity.”
Needs Assessment
© 2003 APC corporation.
The Design Concept is built on standardized parts that can be scaled to meet the need?
Construction Design incorporates a “Lego Block” approach of pre-engineered components?
Construction is mainly done in a factory instead of on-site?
Commissioning tests pre-integrated infrastructure systems.
It should be that …..
© 2003 APC corporation.
Availability Agility
TCOValue
x=
Capital Cost
Electricity Costs
Service Costs
Oversizing is the dominant contributor…
© 2003 APC corporation.
The Business Value Equation for Network-Critical Physical Infrastructure
Availability Agility
TCOValue
x=
© 2003 APC corporation.
On-Demand Architecture forNetwork Critical Physical Infrastructure
Changing the way the world designs data centers…InfraStruXure™
Symmetra PX
InfraStruXure PDU
NetShelter VX
NetworkAIR FM
Wiring Closets (1-3
Racks)
Small Data Centers (5-20 racks)
Smart-UPS
NetShelter VX
NetworkAir PA
InfraStruXureTM
Computer Rooms (1-5 Racks)
Symmetra RM
NetShelter VX
NetworkAir PA
Symmetra PX
InfraStruXure PDU
NetShelter VX
NetworkAIR FM
Medium Data Centers (20-100 racks) Large Data Centers (>100 racks)
Symmetra MW
InfraStruXure PDU
NetShelter VX
NetworkAIR FM
InfraStruXure™ for:
© 2003 APC corporation.
The next step…
For the next project, challenge your team to:
• Dramatically increase availability
• Do it in half the time
• Right size to the current requirement
• Make sure it can adapt
To help you, we can team with your staff to:
• Survey opportunities for savings
• Develop options for increased availability
• Deliver scalable systems on short notice that minimize over-sizing