Pictorial presentation of some projects (Stage 2)

Lagos State

INDEPENDENT PERFORMANCE MGT OF 2011 CGS - LG INTERVENTIONS 1

13/02/13. LG/EO/001: Construction of a new block of 8 classrooms with water source - project up to lintel level. Borehole drilled and cased (sited at the back of the

building)

13/02/13. LG/EO/003: Construction of a block of additional 10 classrooms for Olomu primary school - at substructure/DPC level.

13/02/13. LG/EO/004: Construction of lab facility at Ogombo health post and water source/water plant. Project up to “finishes”

13/02/13. LG/EO/004: Construction of lab facility at Ogombo health post and water source/water plant. Project up to “finishes” (Contd)

13/02/13. LG/EO/006: Rehabilitation of Addo-Langbasa PHC & water source – PHC painted

Windows remaining to be fixed

13/02/13. LG/EO/009: Construction of a new PHC and water source/treatment plant at Araromi – project at substructure/DPC level

12/02/13. LG/EO/010: Supply of basic equipment and furniture to Araromi PHC – ambulance kept at the LG headquarters, other items stored at Okumopo PHC awaiting completion of the

PHC

13/02/13. LG/EO/075: Reconstruction of collapsed fence of Badore PHC – project completed

13/02/13. LG/EO/076: Conversion of drug store to sandcrete block at Sangotedo PHC - project up to “finishes”

13/02/13. LG/EO/077: Replacement of entire PVC ceiling and painting of Sangotedo PHC – PVC replaced, painting yet to be done

12/02/13. LG/IL/025: Renovation of a block of 6 classrooms at Roman Catholic Mission School, Idotun – painting in progress

12/02/13. LG/IL/036: Construction of borehole at Apakin PHC – borehole installed and functioning

12/02/13. LG/IL/034: Procurement of 2 ambulances for the entire LGA – procured , yet to be properly branded

12/02/13. LG/IL/040-042: Provision of medical equipment for Apakin, Folu, Okunraye PHC – equipment in store at the LG headquarters awaiting distribution to the beneficiary facilities.

12/02/13. LG/IL/078: Construction of fence walls around Community Primary School Otolu with gate and gate house – gate house at substructure level

12/02/13. LG/IL/079: Renovation of a block of six classrooms at Roman Catholic Mission School, Olomowewe – making good the superstructure/frame

The consultant and Asst Area Engineer discussing

12/02/13. LG/IL/080: Rehabilitation of PHC Idaso – electrical and plumbing work in progress

11/02/13. LG/IK/043: Renovation of a 2-storey block at Central primary school, Ikeja: finishing works - electrical works etc.

11/02/13. LG/IK/043: Renovation of a 2-storey block at Central primary school, Ikeja: finishing works - electrical works etc. (contd)

11/02/13. LG/IK/044: Rehabilitation of 1 block of classrooms at Community primary school, Wasinmi, Ikeja: plastering in progress

11/02/13. LG/IK/053: Provision of solar powered borehole, pumping machine & overhead tanks at Bola memorial primary school, Abule Onigbagbo – already serving the school

11/02/13. LG/IK/054: Provision of solar powered borehole, pumping machine & overhead tanks at Community primary school, Wasinmi – already serving the school

11/02/13. LG/IK/055: Provision of solar powered borehole, pumping machine & overhead tanks at Opebi primary school, Opebi – already serving the school

11/02/13. LG/IK/057: Rehabilitation of Beko-Ransome Kuti PHC, GRA

11/02/13. LG/IK/058: Construction of PHC at Olusosun – project at DPC level. PHC is being constructed in the same compound with the school but will be separated out at completion

11/02/13. LG/IK/059: Construction of PHC at Opebi – project at “finishes”- plastering, electrical works etc.

11/02/13. LG/IK/060: Upgrading of health post at Wasinmi to PHC – finishing work in progress

A fleet of ambulances (excluding the mobile clinic) purchased for PHC’s in Onigbongbo LCDA of Ikeja LGA

11/02/13. LG/IK/067: Purchase of ambulance including registration, branding, insurance, and tracking for Olusosun PHC

11/02/13. LG/IK/068: Purchase of ambulance including registration, branding, insurance, and tracking for Opebi PHC

11/02/13. LG/IK/069: Purchase of ambulance including registration, branding, insurance, and tracking for Onigbongbo PHC

11/02/13. LG/IK/070: Purchase of ambulance including registration, branding, insurance, and tracking for Wasinmi PHC

11/02/13. LG/IK/073: Purchase of ambulance including registration, branding, insurance, and tracking for Oregun PHC